Feasibility Study for the cross border transmission project in Cambodia

캄보디아 국경연계 송전망 타당성 연구

  • Published : 2006.07.12

Abstract

KEPCO is executing a project in Cambodia consisting of two components, "Power Development Master Plan and Institutional Strengthening" and "Greater Mekong Sub-region (GMS) Power Project Preparation" upon request by the government of the Ministry of Industry, Mines and Energy of Cambodia, contracted on $29^{th}$ September 2005. This paper includes a basic design and review of economical efficiency for constructing the two (2) cross border 115 kV transmission lines, which run from the border of Vietnam and Laos to Cambodia, and four (4) 115kV substations. The main contents of the paper include the process of design and results of a review of line route selection, tower and hardware design regarding transmission line design, as well as the type of substation, and arrangement and specifications of equipment with expects to substation design. Also, long-term demand forecasting, and an economic analysis of the project area are included.

Keywords