한국건축시공학회:학술대회논문집 (Proceedings of the Korean Institute of Building Construction Conference)
- 한국건축시공학회 2005년도 추계 학술논문 발표대회
- /
- Pages.117-120
- /
- 2005
물가변동에 따른 계약금액 조정방식의 지수조정율 산출에 관한 연구
A Study on the Escalation Method for Contract Adjustment Public Construction Project
- 발행 : 2005.11.01
초록
The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.
키워드