디지탈화 및 복합화된 전력기기 변성기용 퓨즈 설치의 문제점

The Study of FUSE Installing of PT in the trend of Digitalization and Convergence of Power Machinery.

  • Ok Yeon Ho (Energy Business Dept. Korea Water Resource Corporation) ;
  • Lee Hyoung Mook (Energy Business Dept. Korea Water Resource Corporation) ;
  • Hong Yeong Jae (Energy Business Dept. Korea Water Resource Corporation) ;
  • Lee Eun Woong (Chungnam National University Engineering)
  • 발행 : 2004.07.14

초록

Fuse is the initial equipment of Protective Relay The installation standard of Fuse has been used for long time in Power Facilities. However according to the innovative development of Electric & Electronic element(=semiconductor) Technology, Protective Relay and other Power Equipments are being changed into Digitalization and Multi-Functional Convergence. In contrast with it, the installation standard of Fuse is just the same. There is a need to give careful consideration to it. This study will bear a Part of producing a safe and efficient Power by examining the current installation of primal 8f secondary 1'use in multi-functional PT of Power plant, giving a problem careful consideration and suggesting suitable countermeasures.

키워드