A Study on the Control Method of Hand & Automatic Operation of On-Off Wiring of an Easy Elevator

간이 엘리베이터 수.자동 개폐배선 제어방식에 관한연구

  • 위성동 (송원대학 전자정보과) ;
  • 구할본 (전남대학교 공과대학 전기공학과) ;
  • 김태성 (전남대학교 공과대화 전기과)
  • Published : 2002.07.08

Abstract

An easy elevator originated is an opened system to compare an existing equipment, and learning efficient is high as a wiring that the sequence control circuit is on and off. The structure of an equipment to be controled from the first floor to the fifth floor is constructed by a lamp to express the function of the open-close of the door according to the cage moving, to express the mechanical actuation of the forward-reverse break and motor of load and of hand-worked control component of Push-Button S/W, L/S and Relay. In order to act of the elevator function that these components connected, designed the auto program and the sequence control circuit. Consequently the process that these(1~5steps) operated the cage with an auto program of the elevator and the sequence control circuit is controled by the step of forward and reverse that the L/S1~L/S5 of sensor adjust function let posit, by the adjustable S/W1~S/W5 of PLC testing panel and the S/W1~S/W5 which installed on the transparent acryl plate of a frame. In here, improved apparatus is the learning equipment of combined use to study the principle and the technique of the originated sequence control circuit and the auto program of PLC.

Keywords