LCCA-embedded Monte Carlo Approach for Modeling Pay Adjustment at the State DOTs

도로공사에서 생애주기비용을 사용한 지급조정모델 개발에 관한 연구

  • Published : 2002.11.01

Abstract

The development of a Pay Adjustment (PA) procedure for implementing Performance-related Specifications (PRS) is known to be a difficult task faced by most State Highway Agencies (SHAs) due to the difficulty in such areas as selecting pay factor items, modeling the relationship between stochastic variability of pay factor items and pavement performance, and determining an overall lot pay adjustment. This led to the need for an effective way of developing a scientific pay adjustment procedure by incorporating Life Cycle Cost Analysis (LCCA) embedded Monte Carlo approach. In this work, we propose a prototype system to determine a PA specifically using the data in the pavement management information systems at Wisconsin Department of Transportation (WisDOT) as an exemplary to other SHAs. It is believed that the PRS methodology demonstrated in this study can be used in real projects by incorporating the more accurate and reliable performance prediction models and LCC model.

미국에서는 품질 관리 문제를 해결할 수 있는 아이디어로 지급(Pay) Factor가 사용되어왔으며 현재는 생애주기비용까지 고려한 한층 진보된 지급조정모델 개발에 많은 관심을 가지고 있다. 하지만 이러한 지급조정모델절차의 개발은 품질특성변수 선택의 문제, 품질특성변수의 확률적 분포와 도로 공용성간의 관계 분석의 문제, 그리고 하나의 전체 지급조정모델 개발의 문제 등으로 미 교통부에서 어려움을 가지고 있다. 본 논문에서는 이러한 점을 극복하기 위한 방법론으로 생애주기비용분석을 고려한 몬테카를로 시뮬레이션 접근 방식이 사용되었다. 미 여러 교통부에서 적용 가능한 견본이 될 수 있도록 현 위스콘신 교통국에서 사용중인 도로관리 관련 시스템들에서 데이터를 축출하여 지급조정을 격정하기 위한 분석 절차를 제시하고 이를 근간으로 지급조정모델 결정 지원 시스템을 개발하였으며 민감도 분석을 실행하여 실제 데이터를 사용하여 개발된 지급조정모델의 적정성을 평가하였다. 본 논문에서 사용된 지급조정모델 개발 절차는 한층 정확성을 높인 도로공용성예측모델과 생애주기비용모델을 사용함으로써 실제 프로젝트에 사용 가능할 것으로 판단된다.

Keywords