Analysis of seepage in trenching for surface desiccation of dredged soft ground

준설매립지반 표층건조처리를 위한 트렌치 굴착시 간극수의 침투해석

  • 정하익 (한국건설기술연구원 토목연구부) ;
  • 오인규 (한국건설기술연구원 토목연구부) ;
  • 이용길 (현대건설 기술연구소) ;
  • 이승원 (현대건설 기술연구소) ;
  • 이영남 (현대건설 기술연구소)
  • Published : 2002.10.01

Abstract

The purpose of this paper os to present and discuss some of flow and drain observed in modelling results. Because dredged fill ground of Yul-Chon located in the south coast of Korea is very soft, this ground should be improved after operation of surface stabilization. There are surface stabilization method such as chemical stabilization, desiccation, horizontally vacuum drain, replacement, and geosynthetics. In Yul-Chon, PTM(Progressive Trenching Method) is adopted to provide the necessity condition of surface desiccation. In the case trench in the dredged soft ground is formed by PTM equipment, pore water in the ground is drained through trench. There, drain and desiccation of surface ground increase, and bearing capacity is improved. In this research, when trench in the dredged soft ground is formed by PTM equipment, permeable characteristics and drain efficiency of pore-water are analyzed using SEEP/W software package. Results show variation of total head, pressure head, flux, hydraulic gradient, and flow quantity.

Keywords