낙동강 달서지구 강변 여과수 취수에 관한 예비 연구

  • Published : 2002.04.01

Abstract

This research introduces some preliminary results of bank filtering intake method adopted in Dalseo area, Nakdong River. This intake method has been planned to supply water resources of 41,000 ㎥/day to Goryeong-Gun and Seongju-Gun in 2016. It is believed that the bank filtering intake method can afford to supply 41,000 ㎥/day amount of water resources and that the raw water quality using the method has more advantages in water treatment than direct surface water intake. Even though the safety yield about individual vertical well is roughly estimated to about 2,000 ㎥/day, it is desirable to decrease the safety yield to about 1,000 ㎥/day in the consideration of long term and simultaneous well pumpings and other unknown factors. Ongoing study will give basic data and new techniques to solve the problems appearing in application of bank filtering method as well.

Keywords