• Title/Summary/Keyword: workload cycle

Search Result 19, Processing Time 0.022 seconds

The Effect Analysis on the Container Terminal Productivity according to Combination of YT Pooling and Dispatching Rules (이송장비 풀링(Pooling)과 우선순위 규칙(Dispatching rule) 조합에 따른 컨테이너 터미널 생산성 효과분석)

  • Chun, Seoyoung;Yoon, SungWook;Jeong, Sukjae
    • Journal of the Korea Society for Simulation
    • /
    • v.28 no.3
    • /
    • pp.25-40
    • /
    • 2019
  • Today, container terminals are fiercely competing to attract an increasing number of containers. As a way to improve terminal productivity, this study proposes two dispatching rules for yard truck allocation priorities. First, Multi-Attribute Dispatching Rule(MADR) is an allocation method to calculate the weighted sum of multiple factors affecting container terminal productivity and priority them. Especially, the workload of the quay crane was considered one of the factors to reduce the residence time of the ship. Second, Cycling Dispatching Rule(CDR) is the effective way to increase the number of double cycles that directly affect terminal productivity. To identify the effects of combinations of pooling and dispatching, a comparative experiments was performed on 8 scenarios that combined them. A simulation environment has been developed for experiments and the results have demonstrated that the combination of terminal level pooling and Multi-attribute Dispatching could be an excellent combination in KPIs consisting of GCR and delayed departure of ships, etc.

A FRAMEWORK FOR ACTIVITY-BASED CONSTRUCTION MANAGEMENT SIMILATION

  • Boong Yeol Ryoo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.732-737
    • /
    • 2009
  • Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.

  • PDF

Performance simulation of an electric multi-purpose cultivator according to rotary tillage

  • Seung-Yun, Baek;Wan-Soo, Kim;Seung-Min, Baek;Hyeon-Ho, Jeon;Jun-Ho, Lee;Dae-Hyun, Lee;Kyu-Hong, Choi;Yong-Joo, Kim;Seung-Muk, Choi
    • Korean Journal of Agricultural Science
    • /
    • v.48 no.4
    • /
    • pp.1027-1037
    • /
    • 2021
  • This study aims to evaluate the performance of an electric multi-purpose cultivator through a simulation analysis. The simulation model was developed using commercial software, Simulation X, by applying the specifications of certain parts, such as an electric motor, a battery, and so on. The input parameter of the simulation was the engine load data according to the rotary tillage level using a conventional multi-purpose cultivator. The data were collected by configuring a load measurement system, and the load cycle was developed by repeating the data collection process under the most severe conditions. The average output engine torque values of conventional multi-purpose cultivator were 10.7, 13.0, 9.4, and 11.2 Nm in the D1P1, D1P2, D2P1, and D2P2 conditions, respectively. As a result of the simulation, the maximum values of the motor torque, rotational speed, and power of the electric multi-purpose cultivator were 16.8 Nm, 2,033.3 rpm, and 3.3 kW, respectively, and the motor was driven in sections within 70, 68, and 45% of the maximum output range. The rate of decrease of the battery state of charge (SOC) level per minute was approximately 0.6%, and it was possible to supply electric power to the motor for 9,550 sec. In the future study, research to verify and improve simulation models of electric multi-purpose cultivators should be conducted.

Assessment of Facility Management Functions for Life-Cycle Information Sharing (생애주기 정보공유를 위한 자산관리 업무기능 분석)

  • Lee, Kwangjin;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.40-52
    • /
    • 2016
  • In the 1960s and 1970s when Korea experienced rapid economic growth, a considerable number of buildings were constructed in the country. And since 2000, a large number of sizable and complex buildings have been being built. Specifically, as the operation and maintenance cost alone accounts for 85% of the life cycle cost of a building, efficient Facility Management (FM) is required. However, data needed in the operation and maintenance phase are not sufficiently exchangeable with data created in other phases like the planning, design and construction phases. The upper phase has higher value of data but data exchange rate is low, resulting in inefficiency. To this end, this research derived major business functions for facility management: three categories and 19 detailed functions in classification from owner's perspective. Based on the derived items, this research proposes a methodology to evaluate the 'FM Workload', 'Facility Management (FM) Data', and 'FM Data Created in Engineering and Construction Phases' thereby analyzing plans for efficient operation and maintenance. The applicability of proposed methodology was tested by examining real-world cases of public and private companies.

Bayesian Selection Rule for Human-Resource Selection in Business Process Management Systems (베이지안 규칙을 사용한 비즈니스 프로세스 관리 시스템에서의 인적 자원 배정)

  • Nisafani, Amna Shifia;Wibisono, Arif;Kim, Seung;Bae, Hye-Rim
    • The Journal of Society for e-Business Studies
    • /
    • v.17 no.1
    • /
    • pp.53-74
    • /
    • 2012
  • This study developed a method for selection of available human resources for incomingjob allocation that considers factors affecting resource performance in the business process management (BPM) environment. For many years, resource selection has been treated as a very important issue in scheduling due to its direct influence on the speed and quality of task accomplishment. Even though traditional resource selection can work well in many situations, it might not be the best choice when dealing with human resources. Humanresource performance is easily affected by several factors such as workload, queue, working hours, inter-arrival time, and others. The resource-selection rule developed in the present study considers factors that affect human resource performance. We used a Bayesian Network (BN) to incorporate those factors into a single model, which we have called the Bayesian Selection Rule (BSR). Our simulation results show that the BSR can reduce waiting time, completion time and cycle time.

The Project Management Information System for the Work Efficiency Improvement (업무 효율 향상을 위한 사업관리정보시스템)

  • Ryu, Jee-Woong;Song, Jong-Cheol;Moon, Byung-Joo;Jung, Hoe-Kyung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.1
    • /
    • pp.18-24
    • /
    • 2014
  • For successful projects, Project Management Information System(PMIS) using the formal systematic processes is necessary. Because the existing PMIS focuses on low-level project management, the life-cycle administration of the projects is required. In this dissertation, I describe not only the processes for managing a project with the top-down approach(a hierarchical goal setting of the project outcome), but also PMIS which can control whole processes of R&D projects. The PMIS described in this dissertation can reduce the workload of project management by providing user-adaptive environments and linking with related systems, so can be helpful to enhance the efficiency of the project management. And, it is expected that these processes can be the standard project management processes which are adaptive to various types of projects.

An Application Method and Effect Analysis of the DBR(Drum-Buffer-Rope) Method Under the Re-entrant Process (재투입공정 하에서 DBR 기법 적용 방안 및 효과분석)

  • Yang, Hyunjun;Jeong, Sukjae;Yoon, SungWook
    • Journal of the Korea Society for Simulation
    • /
    • v.29 no.1
    • /
    • pp.57-69
    • /
    • 2020
  • Many researchers have recommended that DBR scheduling would be an efficient method to maintain the balance of their workload among many processes in the general flow shop. However, as product variety has increased in recent years, the process has become more complex and requires the re-entrance of raw materials and work in process. The re-entrant line has known for the complex manufacturing process that raw materials are repeatedly processed on the same machine. This study reviews the applicability of DBR against the re-entrant manufacturing line due to the distinguishing characteristics and the higher complexity caused by multiple visits of a job into the identical process. In order to apply the DBR method to the re-entrant process, the main idea is to reconstruct re-entrant process into a virtual flow process(loop) that has a single bottleneck. This study discusses the following two questions. First, DBR is also superior to traditional scheduling methods against re-entrant manufacturing line. And how we structure and detect the system bottleneck (or sub-bottleneck) through drum-buffer-rope concepts. To answer the above questions, we experimented and analyzed the effects of the applicability of DBR under the general re-entrant process model(TRC, Technology Research Center). As a result, we have identified a balance between loops for cycle time and work in process.

Machine Allocation Based on Salvage Value for Minimizing Purchasing Costs of Consumable Auxiliary Tools (소모성 보조 장비 구입비용 최소화를 위한 잔존가치 기반의 장비 할당 문제)

  • Yoon, Sung-Wook;Jeong, Suk-Jae
    • Journal of the Korea Society for Simulation
    • /
    • v.23 no.4
    • /
    • pp.51-64
    • /
    • 2014
  • Small and medium Enterprises (SMEs), which have a manufacturing method of small quantity batch production produce goods using a general-purpose equipment and attached auxiliary tools. Many previous studies have focused on finding the effective resource allocations for improving the firms' productivity. It is very important for SMEs to keep costs low in assigning jobs to each resource, because they should meet the future uncertain demand of consumers under the limited budget. Using the concept of salvage cost, this paper proposes how to effectively allocate the tasks to main resources in the production process. The salvage cost is defined that purchasing cost minus decrease in value by workload, the method considering this is expected to reduce total purchasing costs during business period. To validate the effect of the proposed method, we proceed the real case study targeting on S company, PCB manufacturer to compare purchase amounts and its costs between the allocation proposed based salvage cost and current allocation method of current S company. As a results, In short-term (3 year) business period, salvage allocation have remarkable superior outcome to existing method, but gradually have cancelled out the effects in long-term (8 year) plans. Unlike the cycle allocation method, there exists the idle-equipments in allocation based salvage value. we additionally analyze the profits with respect to rental strategy of them during business period.

The Correlation between HRCT Emphysema Score and Exercise Pulmonary Testing Parameters (HRCT Emphysema Scoring과 운동부하 폐기능검사 지표들 간의 상관관계)

  • Choi, Eun-Kyoung;Choi, Young-Hee;Kim, Doh-Hyung;Kim, Yong-Ho;Yoon, Se-Young;Park, Jae-Seuk;Kim, Keun-Youl;Lee, Kye-Young
    • Tuberculosis and Respiratory Diseases
    • /
    • v.50 no.4
    • /
    • pp.415-425
    • /
    • 2001
  • Background : The correlation between the high resolution computed tomography(HRCT) emphysema score and the physiologic parameters including resting and exercise pulmonary function test was investigated in 14 patients($60.6{\pm}10.3$ years) with pulmonary emphysema. Methods : The patients underwent a HRCT, a resting pulmonary function test, and incremental exercise testing(cycle ergometer, 10 W/min). Computed tomography scans were obtained on a GE highlight at 10 mm intervals using 10 mm collimation, from the apex to the base after a full inspiration. The emphysema scores were determined by a CT program 'Density mask' outlining the areas with attenuation values less than -900 HU, indicating the emphysema areas, and providing an overall percentage of lung involvement by emphysema. Results : Among the resting PFT parameters, only the diffusing capacity(r=-0.75) and $PaO_2$ (r=-0.66) correlated with the emphysema score(p<0.05). Among the exercise test parameters, the emphysema score correlated significantly with the maximum power(r=-0.74), maximum oxygen consumption(r=-0.68), anaerobic threshold(V-slope method: r=-0.69), maximal $O_2$-pulse(r=-0.73), and the physiologic dead space ratio at the maximum workload(r=-0.80)(p<0.01). Conclusion: We could find that exercise testing parameters showed a much better correlation with the HRCT emphysema score, which is known to have a good correlation with the pathologic severity than the resting PIT parameters. Therefore it is suggested that exercise testing is superior to resting PIT for estimating in the estimation of the physiologic disturbance in emphysema patients.

  • PDF