• Title/Summary/Keyword: work schedule

Search Result 591, Processing Time 0.025 seconds

The Effects of Family Rituals on Family Strengths (가족의례가 가족건강성에 미치는 영향)

  • Bae, Jae-Hyun
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.12
    • /
    • pp.622-635
    • /
    • 2016
  • The purpose of this study is first to examine the tendency in what kind of activities and difficulties are carried out as family rituals. Second, the study was to investigate the effects of family rituals on family strengths. To accomplish study purpose, 216 married women/men were asked to fill out the survey questionnaires. For analysis of data, SPSS Win program was used to perform Frequency Analysis, MANOVA, Multiple Regression Analysis. (1)In the dinner rituals, it turned out that a main activity was 'serving homemade food' and a majority of subjects had a difficult time establishing a regular ritual due to 'their busy schedule at work'. In the weekend leisure rituals, a main activity was 'paying a visit to suburbs' and a main difficulty was 'lack of mutually available time for all family members'. In the birthday rituals, a main activity was 'preparing a birthday cake' and a main difficulty was 'because family members forget their birthday'. In the wedding anniversary rituals, women's main activity was 'eating out' and men's main activity was 'give a partner to a flower or gift', and a main difficulty was 'because family members forget their birthday' and 'because it was not a wanted celebration'. Finally, in the traditional rituals, women's main difficulty was 'partner doesn't understand my difficulties' and men's main difficulty was 'trouble human relationships with relatives'. (2)The family rituals were significantly different according to the age. (3)'Closeness of family members', 'task performance and problem solving skills' and 'sharing a value system of family members' were affected by the family rituals.

KCCH Medical Cyclotron Operation for Neutron Therapy and Isotope Production (1989) - A Technical Report - (중성자 치료와 동위원소 생산을 위한 KCCH 의학용 싸이클로트론의 운영 (1989))

  • Kim, Byung-Mun;Kim, Young-Sear;Bak, Joo-Shik;Lee, Jong-Du;Yoo, Seong-Yul;Koh, Kyung-Hwan
    • Journal of Radiation Protection and Research
    • /
    • v.15 no.2
    • /
    • pp.113-122
    • /
    • 1990
  • After four years of planning, equipment acquisition, facility construction and beam testing, the KCCH cyclotron facility was put into operation in November1986. Now the KCCH cyclotron(MC-50) has been used for four years in neutron therapy and radioisotope production. Up to December 1989, 179(1852 sessions) patient have undergone neutron therapy. Radioisotope production for nuclear medicine use was started from March 1989 after extensive work to overcome target transport, target melting, beam diagnostic and chemical processing problems. This status report introduces the cyclotron facility, and the experiences of neutron therapy and isotope production with the MC-50 cyclotron. Besides, the operation results and the general troubles of the MC-50 during 1989 are summarized. Total operation time was 1252.5 hours. Four hundred hours were used for neutron therapy of 599 treatment sessions and 832.5 hours for radioisotope production. Total amount of produced raioisotope was 1695 mCi(Ga-67 : 1478mCi, Tl-201 : 107 mCi, I-123 : 25mCi, In-111 : 85mCi). Twenty hours were used for scheduled beam testing. In 1989, 882% of the planned operation were performed on schedule and this rats is improved remarkably compared to 71.0% in 1988.

  • PDF

A Study on the Process of Semicurrent Records Management in the United States: A Focus on Records Transfer and Appraisal in the Federal Records Center (미국 준현용 기록관리 프로세스에 관한 연구: 연방레코드센터의 기록 이관과 평가를 중심으로)

  • Jo, Ae-Ran;Yang, Dong-Min;Youn, Eun-Ha
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.20 no.3
    • /
    • pp.139-160
    • /
    • 2020
  • Semicurrent records are documents that are stored and managed in a separate section because they are infrequently referred to in work. The semicurrent records management stage is when records from the processing department are collected for the first time, serving as a bridge between the current and noncurrent records. For systematic records management, records management at the semicurrent stage is vital. Although Korea has established numerous records centers, various problems remain in the records management environment. In response, this study examines the United States' semicurrent records management system and discusses the features that are different from that of Korea. For this purpose, the records management system of the United States was selected as the scope of research and is analyzed through its records schedule, transfer, and appraisal. The data for the research were obtained through the relevant records management law, guidelines compiled by related agencies, and written inquiries for the records management officer. Through these methods, this study was able to identify the relationship between the federal agency and the Federal Records Center, the introduction of new technology in the aspect of transfers, the privatization of records preservation, and the status of the Federal Records Center as a passive appraisal entity.

Implementation of A Multiple-agent System for Conference Calling (회의 소집을 위한 다중 에이전트 시스템의 구현)

  • 유재홍;노승진;성미영
    • Journal of Intelligence and Information Systems
    • /
    • v.8 no.2
    • /
    • pp.205-227
    • /
    • 2002
  • Our study is focused on a multiple-agent system to provide efficient collaborative work by automating the conference calling process with the help of intelligent agents. Automating the meeting scheduling requires a careful consideration of the individual official schedule as well as the privacy and personal preferences. Therefore, the automation of conference calling needs the distributed processing task where a separate calendar management process is associated for increasing the reliability and inherent parallelism. This paper describes in detail the design and implementation issues of a multiple-agent system for conference calling that allows the convener and participants to minimize their efforts in creating a meeting. Our system is based on the client-sewer model. In the sewer side, a scheduling agent, a negotiating agent, a personal information managing agent, a group information managing agent, a session managing agent, and a coordinating agent are operating. In the client side, an interface agent, a media agent, and a collaborating agent are operating. Agents use a standardized knowledge manipulation language to communicate amongst themselves. Communicating through a standardized knowledge manipulation language allows the system to overcome heterogeneity which is one of the most important problems in communication among agents for distributed collaborative computing. The agents of our system propose the dates on which as many participants as possible are available to attend the conference using the forward chaining algorithm and the back propagation network algorithm.

  • PDF

Hypofractionated intensity-modulated radiotherapy in patients with localized prostate cancer: a preliminary study

  • Kang, Hye Jin;Kay, Chul-Seung;Son, Seok Hyun;Kim, Myungsoo;Jo, In Young;Lee, So Jung;Lee, Dong Hwan;Suh, Hong Jin;Choi, Yong Sun
    • Radiation Oncology Journal
    • /
    • v.34 no.1
    • /
    • pp.45-51
    • /
    • 2016
  • Purpose: The aim of this work was to assess the efficacy and tolerability of hypofractionated intensity-modulated radiotherapy (IMRT) in patients with localized prostate cancer. Materials and Methods: Thirty-nine patients who received radical hypofractionated IMRT were retrospectively reviewed. Based on a pelvic lymph node involvement risk of 15% as the cutoff value, we decided whether to deliver treatment prostate and seminal vesicle only radiotherapy (PORT) or whole pelvis radiotherapy (WPRT). Sixteen patients (41%) received PORT with prostate receiving 45 Gy in 4.5 Gy per fraction in 2 weeks and the other 23 patients (59%) received WPRT with the prostate receiving 72 Gy in 2.4 Gy per fraction in 6 weeks. The median equivalent dose in 2 Gy fractions to the prostate was 79.9 Gy based on the assumption that the ${\alpha}/{\beta}$ ratio is 1.5 Gy. Results: The median follow-up time was 38 months (range, 4 to 101 months). The 3-year biochemical failure-free survival rate was 88.2%. The 3-year clinical failure-free and overall survival rates were 94.5% and 96.3%, respectively. The rates of grade 2 acute genitourinary (GU) and gastrointestinal (GI) toxicities were 20.5% and 12.8%, respectively. None of the patients experienced grade ${\geq}3$ acute GU and GI toxicities. The grade 2-3 late GU and GI toxicities were found in 8.1% and 5.4% of patients, respectively. No fatal late toxicity was observed. Conclusion: Favorable biochemical control with low rates of toxicity was observed after hypofractionated IMRT, suggesting that our radiotherapy schedule can be an effective treatment option in the treatment of localized prostate cancer.

Efficient Multi-spot Monitoring System Using PTZ Camera and Wireless Sensor Network (PTZ 카메라와 무선 센서 네트워크를 이용한 효율적인 다중 지역 절전형 모니터링 시스템)

  • Seo, Dong-kyu;Son, Cheol-su;Yang, Su-yeong;Cho, Byung-lok;Kim, Won-jung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2009.10a
    • /
    • pp.581-584
    • /
    • 2009
  • Recently, the cameras which used for observation are installed in children protection area and local crime prevention area in order to protect life and property and by its work being recognized and are installed more. Normal cameras have cost problem to observe multiple area and detail, because they can observe only one place. PTZ camera can observe multiple area by moving focus by schedule or remote control, but it can't automatically move the focus of it to the place where event occurred, because it can't recognize the place. In this study, we can monitor multiple area effectively, by installing a wireless sensor node equipped with temperature, lighting, gas and human detection sensor to each area, to monitor many place low-price and actively and to move the focus of PTZ camera to preset position, and send recorded video to the user, when the various sensor data received from wireless sensors in observation area are to be determined abnormal by analyzing. In addition, at night we can record a scene using infrared, but to reduce power consumption of lighting system which are installed to improve resolution, it supplies power to the lighting system when event occurred. So we were able to implement low power green monitoring system.

  • PDF

The Improvement of maintainability evaluation method at system level using system component information and fuzzy technique (시스템의 구성품 정보와 퍼지 기법을 활용한 시스템 수준 정비도 평가 방법의 개선)

  • Yoo, Yeon-Yong;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.3
    • /
    • pp.100-109
    • /
    • 2019
  • Maintainability indicates the extent to which maintenance can be done easily and quickly. The consideration of maintainability is crucial to reduce the operation and support costs of weapon systems, but if the maintainability is evaluated after the prototype production is done and necessitates design changes, it may increase the cost and delay the schedule. The evaluation should verify whether maintenance work can be performed, and support the designers in developing a design to improve maintainability. In previous studies, the maintainability index was calculated using the graph theory at the early design phase, but evaluation accuracy appeared to be limited. Analyzing the methods of evaluating the maintainability using fuzzy logic and 3D modeling indicate that the design of a system with good maintainability should be done in an integrated manner during the whole system life cycle. This paper proposes a method to evaluate maintainability using SysML-based modeling and simulation technique and fuzzy logic. The physical design structure with maintainability attributes was modeled using SysML 'bdd' diagram, and the maintainability was represented by an AHP matrix for maintainability attributes. We then calculated the maintainability using AHP-based weighting calculation and fuzzy logic through the use of SysML 'par' diagram that incorporated MATLAB. The proposed maintainability model can be managed efficiently and consistently, and the state of system design and maintainability can be analyzed quantitatively, thereby improving design by early identifying the items with low maintainability.

Design of an Efficient Control System for Harbor Terminal based on the Commercial Network (상용망 기반의 항만터미널 효율적인 관제시스템 설계)

  • Kim, Yong-Ho;Ju, YoungKwan;Mun, Hyung-Jin
    • Journal of Industrial Convergence
    • /
    • v.16 no.1
    • /
    • pp.21-26
    • /
    • 2018
  • The Seaborne Trade Volume accounts for 97% of the total. This means that the port operation management system can improve port efficiency, reducing operating costs, and the manager who manages all operations at the port needs to check and respond quickly when delays of work and equipment support is needed. Based on the real-time location information confirmation of yard automation equipment used the existing system GPS, the real-time location information confirmation system is a GPS system of the tablet, rather than a port operation system that monitors location information for the entered information, depending on the completion of the task or the start of the task. Network configurations also reduce container processing delays by using commercial LTE services that do not have shading due to containers in the yard also reduce container processing delays. Trough introduction of smart devices using Android or IOS and container processing scheduling utilizing artificial intelligence, we will build a minimum delay system with Smart Device usage of container processing applications and optimization of container processing schedule. The adoption of smart devices and the minimization of container processing delays utilizing artificial intelligence are expected to improve the quality of port services by confirming the processing containers in real time to consumers who are container information demanders.

Improvement in Rice Cultural Techniques Against Unfavorable Weather Condition (기상재해와 수도재배상의 대책)

  • Ryu, I.S.;Lee, J.H.;Kwon, Y.W.
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • v.27 no.4
    • /
    • pp.385-397
    • /
    • 1982
  • The climatic impacts have been the environmental constraints with soil characteristics to achieve self sufficiency of food production in Korea. In this paper, the distribution and appearance of impacts and the changes in climatological status due to recent trend of early transplanting of rice are widely discussed to derive some countermeasures against the impacts, being focussed on cultural A long term analysis of the climatic impact appearances of the last 74 years showed that drought, strong wind, flood, cold spell and frost were the major impacts. Before 1970's, the drought damage was the greatest among the climatic impacts; however, the expansion and improvement of irrigation and drainage system markedly decreased the damage of drought and heavy rain. The appearance of cold damage became more frequent than before due to introduction of early transplanting for more thermophilic new varieties. Tongillines which were from Indica and Japonica crosses throw more attention to cold damage for high yields to secure high temperature in heading and ripening stages and lead weakness to cold and drought damage in early growth stage after transplanting. The plants became subject to heavy rain in ripening stage also. For the countermeasures against cold damage, the rational distribution of adequate varieties according to the regional climatic conditions and planting schedule should be imposed on the cultivation. A detoured water way to increase water temperature might be suggestable in the early growth stage. Heavy application of phosphate to boost rooting and tillering also would be a nutritional control method. In the heading and ripening stages, foliar application of phosphate and additional fertilization of silicate might be considerable way of nutritional control. Since the amount of solar radiation and air temperature in dry years were high, healthy plants for high yield could be obtained; therefere, the expansion of irrigation system and development of subsurface water should be performed as one of the national development projects. To minimize the damage of strong wind and rainfall, the rational distribution of varieties with different growing periods in the area where the damage occurred habitualy should be considered with installation of wind breaks. Not only vertical windbreaks but also a horizontal wind break using a net might be a possible way to decrease the white heads in rice field by dry wind. Finally, to establish the integrated countermeasures against the climatic impacts, the detailed interpretation on the regional climatic conditions should be conducted to understand distribution and frequency of the impacts. The expansion of observation net work for agricultural meteorology and development of analysis techniques for meteorological data must be conducted in future together with the development of the new cultural techniques.

  • PDF

D4AR - A 4-DIMENSIONAL AUGMENTED REALITY - MODEL FOR AUTOMATION AND VISUALIZATION OF CONSTRUCTION PROGRESS MONITORING

  • Mani Golparvar-Fard;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.30-31
    • /
    • 2009
  • Early detection of schedule delay in field construction activities is vital to project management. It provides the opportunity to initiate remedial actions and increases the chance of controlling such overruns or minimizing their impacts. This entails project managers to design, implement, and maintain a systematic approach for progress monitoring to promptly identify, process and communicate discrepancies between actual and as-planned performances as early as possible. Despite importance, systematic implementation of progress monitoring is challenging: (1) Current progress monitoring is time-consuming as it needs extensive as-planned and as-built data collection; (2) The excessive amount of work required to be performed may cause human-errors and reduce the quality of manually collected data and since only an approximate visual inspection is usually performed, makes the collected data subjective; (3) Existing methods of progress monitoring are also non-systematic and may also create a time-lag between the time progress is reported and the time progress is actually accomplished; (4) Progress reports are visually complex, and do not reflect spatial aspects of construction; and (5) Current reporting methods increase the time required to describe and explain progress in coordination meetings and in turn could delay the decision making process. In summary, with current methods, it may be not be easy to understand the progress situation clearly and quickly. To overcome such inefficiencies, this research focuses on exploring application of unsorted daily progress photograph logs - available on any construction site - as well as IFC-based 4D models for progress monitoring. Our approach is based on computing, from the images themselves, the photographer's locations and orientations, along with a sparse 3D geometric representation of the as-built scene using daily progress photographs and superimposition of the reconstructed scene over the as-planned 4D model. Within such an environment, progress photographs are registered in the virtual as-planned environment, allowing a large unstructured collection of daily construction images to be interactively explored. In addition, sparse reconstructed scenes superimposed over 4D models allow site images to be geo-registered with the as-planned components and consequently, a location-based image processing technique to be implemented and progress data to be extracted automatically. The result of progress comparison study between as-planned and as-built performances can subsequently be visualized in the D4AR - 4D Augmented Reality - environment using a traffic light metaphor. In such an environment, project participants would be able to: 1) use the 4D as-planned model as a baseline for progress monitoring, compare it to daily construction photographs and study workspace logistics; 2) interactively and remotely explore registered construction photographs in a 3D environment; 3) analyze registered images and quantify as-built progress; 4) measure discrepancies between as-planned and as-built performances; and 5) visually represent progress discrepancies through superimposition of 4D as-planned models over progress photographs, make control decisions and effectively communicate those with project participants. We present our preliminary results on two ongoing construction projects and discuss implementation, perceived benefits and future potential enhancement of this new technology in construction, in all fronts of automatic data collection, processing and communication.

  • PDF