ACTIVITY-BASED STRATEGIC WORK PLANNING AND CREW MANAGEMENT IN CONSTRUCTION: UTILIZATION OF CREWS WITH MULTIPLE SKILL LEVELS

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;SangHyun Lee;Hyunsoo Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.359-366
    • /
    • 2013
  • Although many research efforts have been conducted to address the effect of crew members' work skills (e.g., technical and planning skills) on work performance (e.g., work duration and quality) in construction projects, the relationship between skill and performance has generated a great deal of controversy in the field of management (Inkpen and Crossan 1995). This controversy can lead to under- or over-estimations of the overall project schedule, and can make it difficult for project managers to implement appropriate managerial policies for enhancing project performance. To address this issue, the following aspects need to be considered: (a) work performances are determined not only by individual-level work skill but also by the group-level work skill affected by work team members, each member's role, and any working behavior pattern; (b) work planning has significant effects on to what extent work skill enhances performance; and (c) different types of activities in construction require different types of work, skill, and team composition. This research, therefore, develops a system dynamics (SD) model to analyze the effects of both individual-and group-level (i.e., multi-level) skill on performances by utilizing the advantages of SD in capturing a feedback process and state changes, especially in human factors (e.g., attitude, ability, and behavior). The model incorporates: (a) a multi-level skill evolution and relevant behavior development mechanism within a work group; (b) the interaction among work planning, a crew's skill-learning, skill manifestation, and performances; and (c) the different work characteristics of each activity. This model can be utilized to implement appropriate work planning (e.g., work scope and work schedule) and crew management policies (e.g., work team composition and decision of each worker's role) with an awareness of crew's skill and work performance. Understanding the different characteristics of each activity can also support project managers in applying strategic work planning and crew management for a corresponding activity, which may enhance each activity's performance, as well as the overall project performance.

  • PDF

Developing a Data Model of Product Manufacturing Flow for an IC Packaging WIP System

  • Lin, Long-Chin;Chen, Wen-Chin;Sun, Chin-Huang;Tsai, Chih-Hung
    • International Journal of Quality Innovation
    • /
    • 제6권3호
    • /
    • pp.70-94
    • /
    • 2005
  • The IC packaging industry heavily relies on shop floor information, necessitating the development of a model to flexibly define shop floor information and timely handle manufacturing data. This study presents a novel data model of product manufacturing flow to define shop floor information to effectively respond to accelerated developments in IC package industry. The proposed data model consists of four modules: operation template setup, general process setup, enhanced bill of manufacture (EBOMfr) setup, and work-order process setup. The data model can flexibly define the required shop floor information and decision rules for shop floor product manufacturing flow, allowing one to easily adopt changes of the product and on the shop floor. However, to handle floor dynamics of the IC packaging industry, this work also proposes a WIP (i.e. work-in-process) system for monitoring and controlling the product manufacturing flow on the shop floor. The WIP system integrates the data model with a WIP execution module. Furthermore, an illustrative example, the MIRL WIP System, developed by Mechanical Industrial Research Laboratories of Industrial Technology Research Institute, demonstrates the effectiveness of the proposed model.

직무자율성과 자기효능감이 창의적 행동에 미치는 영향: 스마트워크 환경에서 지식공유의 매개효과를 중심으로 (Effects of Job Autonomy and Self-Efficacy on Creative Behavior: Focusing on the Mediation Effect of Knowledge Sharing in Smart Work Environment)

  • 고은정;이성진;김상수
    • 지식경영연구
    • /
    • 제19권2호
    • /
    • pp.163-185
    • /
    • 2018
  • In order to solve problems in an uncertain and complicated management environment of the modern world, a creative solution that combines diverse perspectives, knowledge, and effort based on diversity within an organization is required. Smart work environment provides an opportunity to express the potential diversity of an individual, extending the source of ideas to the organization, enhancing communication, and linking and sharing information and knowledge. So, this results in increased creative behavior. The purpose of this study is to investigate the effect of the process of connecting and sharing information and knowledge of organizational members on creative behavior and the effect of smart work environment in the process. The purpose of this study is to identify roles of job autonomy, self-efficacy, knowledge sharing and smart work environment in creative process. For the study, 353 surveys with work use group(156 people) and unused group(197 people). Statistical analysis included validity and reliability analysis, structural model analysis. The results showed that self-efficacy and job autonomy had positive effects on creative behavior and knowledge sharing, and job autonomy had a positive effect on self-efficacy. Knowledge sharing has a positive effect on creative behavior, and mediates the relationship between self-efficacy, job autonomy and creative behavior. Particularly, knowledge sharing has a more positive effect on smart work use group. In case of smart work use group, self-efficacy and job autonomy have a relatively high influence on knowledge sharing rather than direct influence on creative behavior appear. This result implies that the achievements of smart work are revealed in terms of knowledge sharing and creative behavior.

조적공사에서의 작업 지연 요소 도출 및 개선 시스템 제안 (Delay Factor Analysis and Process Enhancement System Development Focusing on Masonry Work)

  • 박민하;이혜린;고용호;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.119-120
    • /
    • 2015
  • Appropriate management of the finish works in construction project is one of most important activities that must be conducted considering the total duration of the project. Masonry work is a fundamental process that is performed in the preliminary steps of finish works. However, it has been investigated that the analysis of delay factors affecting masonry work has been neglected in the domestic construction site. Therefore, this study deducts delay factors affecting masonry work by literature review and survey on site engineers and labors. This study has been conducted as a preliminary step of developing a construction project interference management system which is expected to suggest objective information for the decision making in construction sites.

  • PDF

여성 재킷의 생산능력 설정을 위한 연구 (A Study on the Productive Capacity Setting of Women's Jacket)

  • 김진선;심규남;오순
    • 한국의류산업학회지
    • /
    • 제13권2호
    • /
    • pp.269-278
    • /
    • 2011
  • This study aims at setting up productive capacity which can be usefully utilized for work management of apparel manufacturers. So as to achieve this goal, an apparel manufacturing company which has been operated by miniline system in Seoul was selected. Standard time and man-hour were calculated to create the accurate productive capacity by observing and measuring a work flow included cutting, sewing and finishing processes. And the result is as following. The standard time for each process was presented as cutting process 47004.5s, sewing process 671050.5s and finishing process 22426.3s. And 15284.4ms was computed as total procession man-hour per day of the manufacturer which is organized of 16 people. Also, the procession man-hour for each process was revealed as cutting process 396.7ms(2.6%), sewing process 14509.3ms(94.9%) and finishing process 378.5ms(2.5%). +Surplus was found in the productivity for each process included the cutting process(outshell, lining and seam process), the sewing process(preparation and arrangement process) and the finishing process. But, additional man-hour 52436.18ms was required because the productive capacity was calculated as -surplus(-13.9%) in the sewing process(part and assembly process). Therefore, a work schedule was planned based on the previous result. However, loading can be ideal when a capacity and a load become '0'. The object company should find the way to reduce allowance(26.25%) of the sewing process through reconstruction of consciousness and improvement in functions with analyzing works of operators. Also, they need to consider an additional supplement of the personnel.

인터넷기반 공동주택 하자분류 및 관리 시스템 구축에 사례기반 추론기법을 활용한 연구 (Defect Classification and Management System Using CBR technique Based Internet in Apartment Housing Project)

  • 김광희;신한우;서덕석;윤지언
    • 한국건축시공학회지
    • /
    • 제8권1호
    • /
    • pp.63-70
    • /
    • 2008
  • Management process of apartment buildings construction has increased because the after service of construction company meet the needs of customers. Many defect data, which was inspected by construction company or customers before moving into a new apartment house, were classified by field engineers and then communicated to corresponding subcontractors. The classification process needs to be performed by an expert engineer because there is so much data, it is unfeasible to complete in a short period of time. For this classification process, an automatic classification system using case base reasoning (CBR) should be considered. This research proposed a defect management system with automatic classification system using CBR. This constructed defect management system consists of cyber after service system for tenants and the whole defect management process of construction, preservation and management of apartment buildings. This system could improve the efficiency of expert work in terms of time and accuracy, as well as helping laymen users to conduct defect classification work as experts do.

거푸집공사 위험성 평가에 관한 연구 (The Study on the Risk Assesment of Formwork)

  • 고성석;오준호
    • 한국안전학회지
    • /
    • 제17권3호
    • /
    • pp.96-101
    • /
    • 2002
  • The object of risk assesment is to prevent the accident from arising. The main reason for risk assesment of construction work is to determine priority order of improvement plan about risky work. Formwork is a complicated process that determines the total duration of apartment construction, and occupies 10∼15% of total construction expense, and 17% of serious accidents occur during formwork. So, formwork occupies very importment roles in work sites, economical efficiency and safety. We need to identify the work type with a high risk of accidents, and to establish suitable safety counterplan and implement intensive safety management.

Analysis and survey of design decision making process in steel production process

  • Furukawa, Satoru;Yoshida, Tomohiro;Chi, Naiyuan;Okamoto, Hiroyuki;Furusaka, Shuzo
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.30-37
    • /
    • 2020
  • In the building construction, the steel-frame work occupies an important position in terms of structure, cost and quality. Especially in Japan, steel frames have traditionally been the main structure of many buildings. For steel-frame works in such positions, this paper investigates an existing steel fabricator to clarify the actual conditions of design decision making process and management method in steel production process. This study focuses on a steel fabricator (Company M in the following sentences), whose main market is Japan and which has facilities in Thailand, China, and Japan. Company M uses QR codes to control the production status of products, and exchanges all information between inside and outside the company via specialized departments in the form of documents. The authors have already analyzed the relationship between production lead time and defect rate based on actual project data at Architectural Institute of Japan in 2016. In 2019, we expressed the process from the confirmation of the design information of the current steel frame to the production by WBS, and clarified the relationship between the production lead time and steel frame product quality structurally. In this paper, the authors reoport the progress of the survey conducted so far, the positioning of the collected data, and the future survey policy.

  • PDF

초고층주거건축의 가구공사 프로세스 분석 및 개선방안에 관한 연구 (A Study on Analysis and Improvement of the Process of Furniture Work for High-rise Residential Building)

  • 김현우;송영웅;최윤기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.446-449
    • /
    • 2003
  • 우리나라의 최근의 건설공사의 형태를 보면 초고층 아파트, 대형 주상복합 건물 등 대형주거용 건축물들이 등장하고 입다. 이러한 건설공사의 대형차 추세에 따라 공사기간, 공사비용 등이 크게 증가하였다. 이에 공사기간 및 공사비용을 절약하고 프로젝트의 성공을 위한 건설관리 기법들의 연구가 활발히 진행되고 있다. 본 연구에서는 초고층 주거건축의 마감공사 중에서 공사규모, 자재의 양중 측면에서 많은 부분을 차지하고 있는 가구공사의 관리체계를 정립하기 위하여, 적시생산(Just-In-Time)방식과 린건설(Lean Construction)의 개념을 도입하였다. 생산성 향상을 위한 위의 두 가기 원리를 이용하여 가구공사의 프로세스를 분석하고 그에 따른 개선방안을 제시하고자 한다. 이러한 분석과 개선방안의 제시는 마감공사의 원활한 흐름을 유도할 수 있으며, 또한 공사기간 및 공사 비용을 절약함으로써 프로젝트의 성공에 기여할 수 있다.

  • PDF

유해화학물질 취급 외국인 근로자의 적응과정 (A Qualitative Study for Foreign Workers Exposed hazard Chemical Materials in Korean Industry)

  • 김현리;김정희;송연이;이꽃메;정혜선;현혜진;김희걸
    • 한국직업건강간호학회지
    • /
    • 제15권2호
    • /
    • pp.94-103
    • /
    • 2006
  • Purpose: This study was to understand foreign workers' experiences exposed hazard chemical materials in korean industry. Method: The research subjects were 92 foreign workers worked in seoul, namyangju, ansan, suwon, pocheon, incheon, jincheon, and daejeon. It was that grounded theory method as qualitative approach was applied with in-depth interview, recording and dictation, and collected data was analysed line-by-line by research teams. The analysis process of in depth interview data was three phase. Results: The first phase was that find out meaningful data and confronted data for meaningful data was 53 meaningful items. The second phase was coding process of meaningful data, total coding items were 9, difficulty of new environment, existence of health hazard factors originated in work, performance of basic health management, management of hazard materials in work-site, self care of hazard materials in work-site, discrimination of disaster-compensation originated in work, perception of work stress, motivation of leaving position, satisfaction for present life. The third phase was 5 adaptation process, copying phase for new environment, management phase for health hazard factors, health change phase, life change phase, illegal stay phase. Conclusion: In summary, as a results it was concluded that foreign workers was experienced new environment and then has various problems in working site. But these evidences were not different from korean workers basically, undoubtedly reality of a korean small and medium enterprise. And foreign workers with long time stay have had many health problems probably, but they have want to long stay and so reach an unexpected result, illegal long stay. Therefore, we should make efforts for adequate foreign workers' health management at work-site and overall life in governmental and industrial nursing level.

  • PDF