Productivity Analysis for Strutural Formwork Using 3D BIM (3D BIM을 활용한 골조 거푸집 공사의 생산성 분석에 관한 연구)

  • Choi, Chang-Hoon;Park, Young-Jin;Soh, Ji-Yoon;Kim, Sung-Yeon;Lee, Junbok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.292-300
    • /
    • 2014
  • The construction progress control is very important because there are many unexpected factors affecting time schedule delay and cost overruns. A complicated measure including item quantity and inherent time and costs is used to monitor the progress. Another element to be considered is a productivity, which is cost effectiveness because productivity is primarily measured by the costs. Productivity is stated as constant in-place value divided by inputs such as worker-hour. The main purpose of this paper is to analyze the productivity of structural formwork using a 3D BIM. In order to achieve the research objective, an integrated model of a BIM with a daily foreman's report is developed. The quantities being extracted from a 3D model and information are integrated with manpower utilized. The developed model is applied to a case project to measure and analyze the productivity in terms of individual building and work crew team. The results are discussed and further research topics will be addressed.

Survey on Working Conditions of Women Workers about a Part of Manufacture (일부 제조업 여성근로자의 근로환경에 관한 연구)

  • Yi, Yun-Jeong;Lee, Jung-Hwa;Yoo, Chan-Young;Park, Dong-Ki;You, Ki-Ho
    • Korean Journal of Occupational Health Nursing
    • /
    • v.12 no.1
    • /
    • pp.5-18
    • /
    • 2003
  • The purpose of this study was to survey working conditions of women workers. We conducted a field survey of 504 manufacturing company with many women working from May 13 to June 29, 2002. We focused on only 3 categories of metal, textile and electronics industry. The result were as follows : 1. Subjects were constituted metal 27.0%, textile 37.9% and electronics industry 35.1%. Size distribution was small scale(<50 workers) 38.1%, medium(50-299 workers) 50.2% and large(${\geq}300$ workers) company 11.7%. Women workers' proportion was 43.6% of total workers, 63.8% of total contractors. 2. A medical examination enforcement of contractors workers was very poor in comparison with that of employees(p<0.001). 3. A 53.8% of total companies have conducted shiftwork system and 2-crew 2-shift(12 hours shift system) ranked first, 56.1%(151 companies). 4. Only 61.3% of total companies conducted more than 90 days as legal standard of a maternity leave and only 2.6% of total companies had a day nursery. In conclusion, many strategies for women workers are needed by companies and government. For example, the raising of understanding about maternity protection, social support insurancing of woman worker and occupational health system improvement for contractors and small size companies.

  • PDF

OLAP and Decision Tree Analysis of Productivity Affected by Construction Duration Impact Factors (공사기간 영향요인에 따른 생산성의 OLAP 분석과 의사결정트리 분석)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.100-107
    • /
    • 2011
  • As construction duration significantly influences the performance and the success of construction projects, it is necessary to appropriately manage the impact factors affecting construction duration. Recently, interest in the construction industry has been rising due to the recent change in the construction legal system, and the competition among the construction companies on construction time. However, the impact factors are extremely diverse. The existing productivity data on impact factors is not sufficient to properly identify the impact factor and measure the productivity from various perspectives, such as subcontractor, time, crew, work and so on. In this respect, a multidimensional analysis by a data warehouse is very helpful in order to view the manner in which productivity is affected by impact factors from various perspectives. Therefore, this research proposes a method that effectively takes the diverse productivity data of impact factors, and generates a multidimensional analysis. Decision tree analysis, a data mining technique, is also applied in this research in order to supply construction managers with appropriate productivity data on impact factors during the construction management process.

A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works - (시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 -)

  • Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.

A Study on the Technique for Preventing Passing-by of High-speed Train (KTX 정차역 통과사고 원인분석 및 예방대책)

  • Chun, Chung-Geun;Chung, Sung-Bong;Lee, Min-Gyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.101-109
    • /
    • 2012
  • It is commonly recognized that railway is one of the representative transportation and it offers public service based on strategies for being rapid, automation, safety. Since the opening of high speed railway, 3-hundred-million people have used it and acknowledged its efficiency. However, derailed accident at Kwangmyeong station in February, 2011, frequent malfunction of KTX-Sancheon, and accidents by engineer's careless fault damaged on credibility of safety, Especially, spreaded accidents through social networking service by cell phones amplified anxiety of public, being criticized by the press. This study analyzed statistics of past accident and cases of passing-by accident, and surveyed 152 KTX captain engineers about their recognition of the accident by careless fault and experiences of possibility of occurrence for preventing engineer's careless fault and restoring trust According to the analysis, engineers worry about responsibility and disadvantages related to the accidents for the most, and they are nervous about malfunction for the second most. This study presents prevention methods regarding the result. First, it is required to improve mental stability and concentration on their work, secondly, advanced ability to cope with malfunction or error through repetitive education and training are required to increase confidence, and for the last, improvement of operational supporting system such as ATP, GPS to prevent errors by human factors. Improvement of the system is expected to lead engineers to prevent careless fault and regain the reputation of railway.

A Development of A Digital Storyboard for Simulation (시뮬레이션을 지원하는 디지털 스토리보드 개발)

  • Han, Sung-Ho;Lee, Gang-Sung
    • Journal of Korea Game Society
    • /
    • v.6 no.4
    • /
    • pp.3-16
    • /
    • 2006
  • Making storyboards is the process of visualizing your film script by hawing sketches of screen shots. The final output looks like a comic book version of your film without speech bubbles. It helps you imagine how your movies, animations, and game opening movies are going to look like Should I be an artist to do this work? Maybe. But if you take a look at the storyboards of Hitchcock's or Spielberg's, you will notice that they have no talents of drawing. What's important in storyboards is actor's moving routes. Thus, far the easier and faster storyboard-making, we developed a tool for making digital storyboards with simulation. Using digital storyboards, you can be more productive than ever. You can organize your ideas and create your shots with the digital storyboads more effectively and it's time-saving, too. Besides, you can export the storyboard fie to HTML format for viewing/showing on the internet, so that you can share your storyboards with your colleagues, crew and clients through the internet.

  • PDF

A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance (도로포장 및 유지공사 표준품셈 개정 방법에 대한 연구)

  • Jung, Dae-Kwon;Tae, Yong-Ho;Ahn, Bang-Ryul;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.11 no.1
    • /
    • pp.85-94
    • /
    • 2009
  • In cost estimation of construction, several methods including quantity-per-unit costing, job costing, unit cost estimation and lumpsum estimation are being utilized in Korea. Among them, a Quantity-per-unit Costing Method is used as a standard of cost estimation in public and private works. This paper presents the realistic job-costing method on all road construction tasks through statistical analyses with field survey data to solve the problems induced by the existing quantity-per-unit costing method. Furthermore, it was found that the newly developed job costing method is able to produce a simple costing procedure and a more actual construction cost estimation by a case study, which was performed to compare particular construction costs produced by two different methods, existing quantity-per-unit costing and newly developed job costing. These methods is compared by Case-study about sub-base. In the case of Job costing method, the estimate is shorter than the other case about 50% and can make up for the weak point about instrument in the current Standard of cost estimation. And it can be depict by Job Costing method about progress of work for using by a plan about construction management.

  • PDF

Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction

  • Kim, Min-Gyu;Kang, Hyungjoo;Lee, Mun-Jik;Cho, Gun Rae;Li, Ji-Hong;Yoon, Tae-Sagm;Ju, Jaeheung;Kwak, Han-Wan
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.5
    • /
    • pp.361-370
    • /
    • 2020
  • We developed a heavy-duty work class ROV trencher named URI-T (Underwater robot it's trencher) that can conduct burial and maintenance tasks for underwater cables and small diameter pipelines. It requires various supporting systems, including a dynamic positioning (DP) vessel, launch and recovery system (LARS), A-frame, and winch in order to perform burial tasks because of its dimensions (6.5 m × 5.0 m × 4.5 m, 20 t) and the tough working environment. However, operating a DP vessel has disadvantages as it is expensive to rent and operate and it is difficult to adjust the working schedule for some domestic coast construction cases. In this paper, we propose a method using a barge instead of a DP vessel to avoid the above disadvantages. Although burying the cable and pipeline using a barge has lower working efficiency than a DP vessel, it can save construction expenses and does not require a large crew. The proposed method was applied over two months at the construction of the water supply in Yokji-do, and the results were verified.

The improvement of the shellfish dredge vessel in Jeonnam province (전남 지역의 패류 형망어선의 개량)

  • PARK, Sang-Jun;JANG, Choong-Sik;AN, Young-Su;JIN, Song-Han;CHO, Youn-Hyoung
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.55 no.2
    • /
    • pp.162-171
    • /
    • 2019
  • This study is aimed to develop an improved shellfish dredge vessel considering the increase of the fishing safety and welfare of fishermen in Jeonnam province. We visited five fishing village societies in Korea, and conducted field surveys and survey questions to investigate the current status. In order to solve the problems presented by the investigation, a general arrangement of the improvement vessel was written and adopted after meeting between the fishermen and research team, and calculated the initial stability in five loading conditions by using the Napa program. As a result of field surveys and survey questions, the existing vessel have buoyant materials under the bow and the warp pass through the wheel-house. In addition, most fishing equipment and nets are concentrated on a narrow stern, making it difficult to work efficiently. According to the survey, fishermen also responded that operation of casting and hauling is very inconvenient. The fishing equipment of the improvement vessel was rearranged, the size of the wheel-house and the crew room was increased, and we secured a basic welfare space. As a result of the initial stability test, the stability criteria of the fishing vessel were satisfied in all loading condition.

Integrated Ship Cybersecurity Management as a Part of Maritime Safety and Security System

  • Melnyk, Oleksiy;Onyshchenko, Svitlana;Pavlova, Nataliia;Kravchenko, Oleksandra;Borovyk, Svitlana
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.3
    • /
    • pp.135-140
    • /
    • 2022
  • Scientific and technological progress is also fundamental to the evolving merchant shipping industry, both in terms of the size and speed of modern ships and in the level of their technical capabilities. While the freight performance of ships is growing, the number of crew on board is steadily decreasing, as more work processes are being automated through the implementation of information technologies, including ship management systems. Although there have been repeated appeals from international maritime organizations to focus on building effective maritime security defenses against cyber attacks, the problems have remained unresolved. Owners of shipping companies do not disclose information about cyberattack attempts or incidents against them due to fear of commercial losses or consequences, such as loss of image, customer and insurance claims, and investigations by independent international organizations and government agencies. Issues of cybersecurity of control systems in the world today have gained importance, due to the fact that existing threats concern not only the security of technical means and devices, but also issues of environmental safety and safety of life at sea. The article examines the implementation of cyber risk management in the shipping industry, providing recommendations for the safe ship operation and its systems in order to improve vulnerability to external threats related to cyberattacks, and to ensure the safety and security of such a technical object as a seagoing ship.