Correlation of wind load combinations including torsion on medium-rise buildings

  • Keast, D.C.;Barbagallo, A.;Wood, G.S.
    • Wind and Structures
    • /
    • v.15 no.5
    • /
    • pp.423-439
    • /
    • 2012
  • Three common medium- rise building forms were physically tested to study their overall wind induced structural response. Emphasis was placed on the torsional response and its correlation with other peak responses. A higher correlation was found between the peak responses than between the general fluctuating parts of the signals. This suggests a common mechanism causing the peak event, and that this mechanism is potentially different to the mechanism causing the general load fluctuations. The measurements show that about 80% of the peak overall torsion occur simultaneously with the peak overall along wind drag for some generic building shapes. However, the peak torsional response occurs simultaneously with only 30%-40% of the peak overall drag for the rectangular model. These results emphasise the importance of load combinations for building design, which are often neglected in the design of medium sized rigid buildings for which the along-wind drag is dominant. Current design wind loading standards from around the world were evaluated against the results to establish their adequacy for building design incorporating wind-induced torsion effects. Although torsion is frequently neglected, for some structural systems it may become more important.

Optimum Design of a Wind Power Generation System through Analysis of Wind Data (풍속자료(風速資料) 분석(分析)에 의한 풍역발전(風力發電)시스템 최적(最適) 설계(設計))

  • Lee, Chul-Hyung;Shin, Dong-Ryul
    • Solar Energy
    • /
    • v.4 no.2
    • /
    • pp.3-12
    • /
    • 1984
  • In this paper, how to design the wind power generation system is presented. It is shown that the wind system optimization can be achieved by consideration of the four factors; wind statistics, efficiency of conversion of wind energy to electrical energy, average annual energy extracted and load factor. The wind is characterized by a weibull probability function. The Weibull parameter is calculated for the characterizing wind and the primary design specification of ten different sites. Some graphs are presented, which can be used to design a wind system for maximum output of a specified load factor at given site. Two different systems, $V_c=0.4V_R$ and $V_c=0.5V_R$ are discussed, as samples, for investigation of the effects on the system through the variation of cut-in speed.

  • PDF

A Study on the Safety Frame Interval of Pipe Houses in Kyungpook Region (경북지방 파이프하우스의 안전골조간격에 관한 연구)

  • 이현우;이석건
    • Journal of Bio-Environment Control
    • /
    • v.4 no.2
    • /
    • pp.195-202
    • /
    • 1995
  • As the pipe houses were constructed by imitation and routine without a structural design by now, they were often destructed by a strong wind or a heavy snowfall. The purpose of this study was to provide the basic data for the safety structural design of the pipe houses in Kyungpook region to prevent meteorological disaster. It was shown that the change of frame interval according to the safety factor under the wind load was similar that under the snow load. But the safety frame interval under the snow load was approximately 0.5-0.6m greater than that under the wind load for equal safety factor. Therefore, it seemed that the maximum safety frame interval was to be decided by the snow load. The frame of the pipe houses in Seungju region was structurally stable under the design snow load in recurrence intervals of 8-15years, but was unstable in Kolyong region.

  • PDF

Probabilistic Reliability Based Grid Expansion Planning of Power System Including Wind Turbine Generators

  • Cho, Kyeong-Hee;Park, Jeong-Je;Choi, Jae-Seok
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.5
    • /
    • pp.698-704
    • /
    • 2012
  • This paper proposes a new methodology for evaluating the probabilistic reliability based grid expansion planning of composite power system including the Wind Turbine Generators. The proposed model includes capacity limitations and uncertainties of the generators and transmission lines. It proposes to handle the uncertainties of system elements (generators, lines, transformers and wind resources of WTG, etc.) by a Composite power system Equivalent Load Duration Curve (CMELDC)-based model considering wind turbine generators (WTG). The model is derived from a nodal equivalent load duration curve based on an effective nodal load model including WTGs. Several scenarios are used to choose the optimal solution among various scenarios featuring new candidate lines. The characteristics and effectiveness of this simulation model are illustrated by case study using Jeju power system in South Korea.

Effect of Wire Bracing to Wind Load Acting on Vinyl House Frame (비닐하우스 골조에 작용하는 풍하중에 대한 강선보강효과)

  • Jung, Dong-Jo;Teng, Chhay
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.12 no.2
    • /
    • pp.23-29
    • /
    • 2010
  • Vinyl house is a simple agricultural structure that is installed economically and easily. In contrast, every year the farmers have spent a lot of money because of the collapse of this structure caused by the external forces such as strong wind and heavy snow. To prevent this damage due to frequent heavy snow and strong wind, it would be necessary to design it again. But getting rid of former vinyl house and reconstructing is unreasonable. It would be very economic if the former vinyl house is strengthened simply. This paper covers the investigation of the effect of the bracing systems that are additionally inserted inside the ordinary single frames as well as unbraced multiple frames that resisting only the strong wind load.

Evaluation of the Wind Power Penetration Limit and Wind Energy Penetration in the Mongolian Central Power System

  • Ulam-Orgil, Ch.;Lee, Hye-Won;Kang, Yong-Cheol
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.6
    • /
    • pp.852-858
    • /
    • 2012
  • This paper describes evaluation results of the wind power penetration limit (WPPL) and the wind energy penetration (WEP) in the Mongolian central power system (MCPS). A wind power plant (WPP) in a power system possesses an output power limit because the power system must maintain a balance between the generation and consumption of electricity at all times in order to achieve an adequate level of quality. The instantaneous penetration limit (IPL) of wind generation at a load is determined as the minimum of the three technical constraints: the minimum output, the ramp rate capability, and the spinning reserve of the conventional generating units. In this paper, a WPPL is defined as the maximum IPL divided by the peak load. A maximal variation rate (VR) of wind power is a major factor in determining the IPL, WPPL, and WEP. This paper analyzes the effects of the maximal VR of wind power on the WPPL, WEP, and capacity factor (CF) in the MCPS. The results indicate that a small VR can facilitate a large amount of wind energy while maintaining a high CF with increased wind power penetration.

Estimating peak wind load effects in guyed masts

  • Sparling, B.F.;Wegner, L.D.
    • Wind and Structures
    • /
    • v.10 no.4
    • /
    • pp.347-366
    • /
    • 2007
  • Guyed masts subjected to turbulent winds exhibit complex vibrations featuring many vibration modes, each of which contributes to various structural responses in differing degrees. This dynamic behaviour is further complicated by nonlinear guy cable properties. While previous studies have indicated that conventional frequency domain methods can reliably reproduce load effects within the mast, the system linearization required to perform such an analysis makes it difficult to relate these results directly to corresponding guy forces. As a result, the estimation of peak load effects arising jointly from the structural action of the mast and guys, such as leg loads produced as a result of guy reactions and mast bending moments, is uncertain. A numerical study was therefore undertaken to study peak load effects in a 295 m tall guyed mast acted on by simulated turbulent wind. Responses calculated explicitly from nonlinear time domain finite element analyses were compared with approximate methods in the frequency domain for estimating peak values of selected responses, including guy tension, mast axial loads and mast leg loads. It was found that these peak dynamic load effects could be accurately estimated from frequency domain analysis results by employing simple, slightly conservative assumptions regarding the correlation of related effects.

Design of Tower Damper Gain Scheduling Algorithm for Wind Turbine Tower Load Reduction (풍력터빈 타워 하중 저감을 위한 타워 댐퍼 게인 스케줄링 알고리즘 설계)

  • Kim, Cheol-Jim;Kim, Kwan-Su;Paek, In-Su
    • Journal of the Korean Solar Energy Society
    • /
    • v.38 no.2
    • /
    • pp.1-13
    • /
    • 2018
  • This paper deals with the NREL (National Renewable Energy Laboratory) 5-MW reference wind turbine. The controller which include MPPT (Maximum power point tracking) control algorithm and tower load reduction control algorithm was designed by MATLAB Simulink. This paper propose a tower damper algorithm to improve the existing tower damper algorithm. To improve the existing tower damper algorithm, proposed tower damper algorithm were applied the thrust sensitivity scheduling and PI control method. The thrust sensitivity scheduling was calculated by thrust force formula which include thrust coefficient table. Power and Tower root moment DEL (Damage Equivalent Load) was set as a performance index to verify the load reduction algorithm. The simulation were performed 600 seconds under the wind conditions of the NTM (Normal Turbulence Model), TI (Turbulence Intensity)16% and 12~25m/s average wind speed. The effect of the proposed tower damper algorithm is confirmed through PSD (Power Spectral Density). The proposed tower damper algorithm reduces the fore-aft moment DEL of the tower up to 6% than the existing tower damper algorithm.

The use of linear stochastic estimation for the reduction of data in the NIST aerodynamic database

  • Chen, Y.;Kopp, G.A.;Surry, D.
    • Wind and Structures
    • /
    • v.6 no.2
    • /
    • pp.107-126
    • /
    • 2003
  • This paper describes a simple and practical approach through the application of Linear Stochastic Estimation (LSE) to reconstruct wind-induced pressure time series from the covariance matrix for structural load analyses on a low building roof. The main application of this work would be the reduction of the data storage requirements for the NIST aerodynamic database. The approach is based on the assumption that a random pressure field can be estimated as a linear combination of some other known pressure time series by truncating nonlinear terms of a Taylor series expansion. Covariances between pressure time series to be simulated and reference time series are used to calculate the estimation coefficients. The performance using different LSE schemes with selected reference time series is demonstrated by the reconstruction of structural load time series in a corner bay for three typical wind directions. It is shown that LSE can simulate structural load time series accurately, given a handful of reference pressure taps (or even a single tap). The performance of LSE depends on the choice of the reference time series, which should be determined by considering the balance between the accuracy, data-storage requirements and the complexity of the approach. The approach should only be used for the determination of structural loads, since individual reconstructed pressure time series (for local load analyses) will have larger errors associated with them.