1 |
Rajesh Karki, P. Hu and Roy Billinton, "A Simplified Wind Power Generation Model for Reliability Evaluation", IEEE Trans. on Energy Conversion, 21(2), 2006.
|
2 |
Jaeseok Choi, Hongsik Kim, Junmin Cha and Roy Billinton, "Nodal Probabilistic Congestion and Reliability Evaluation of a Transmission System under Deregulated Electricity Market," IEEE, PES, GM2001, Vancouver, Canada, 2001.
|
3 |
Jaeseok Choi, Roy Billinton and M. Futuhi-Firuzabed "Development of[ a New Nodal Effective Load Model Considering of Transmission System Element Unavailabilities" IEE Proc. on G,T&D, Vol. 152, No.1, pp.79-89, Feb. 2005.
|
4 |
Jaeseok Choi, Timothy Mount, Robert Thomas and Roy Billinton, "Probabilistic Reliability Criterion for Planning Transmission System Expansions," IEE G,T&D, Vol.153, No.6, pp.719-727, 2006.
|
5 |
Liang. Wu, Jeongje Park, Jaeseok Choi and A.A. El-Keib, "Probabilistic Reliability Evaluation of Power Systems Including Wind Turbine Generators Considering Wind Speed Correlation, KIEE, Journal of Electrical Engineering & Technology, Vol. 4, No. 4, pp. 514-519, Dec. 2009.
|
6 |
Liang Wu, Jungjae Park, Jaeseok Choi, A.A. El-Keib, M. Shahidehpour and Roy Billinton, "Probabilistic Reliability Evaluation of Power Systems Including Wind Turbine Generators Using a Simplified Multi-State Model: A Case Study," IEEE PES GM, Calgary, 2009.
|
7 |
Jaeseok Choi, Jeongje Park, Kyeonghee Cho, Taegon Oh and Mohammad Shahidehpour, "Probabilistic Reliability Evaluation of Composite Power Systems Including Wind Turbine Generators", PMAPS2010, Grand Copthorne Waterfront Hotel, Singapore, June 14-17, 2010.
|
8 |
Jeongje Park, Kyeonghee Cho, Taegon Oh, Jaeseok Choi and A.A. El-Keib, "Evaluation of Economic impacts of Wind Turbine and Solar Cell Generators on Power system Considering Emission", PMAPS2010, Grand Copthorne Waterfront Hotel, Singapore, June 14-17, 2010.
|
9 |
Roy Billinton and Wenyuan Li, Reliability Assessment of Electric Power Systems Using Monte Carlo Methods, p. 24-30, 1994.
|
10 |
N. Jenkins, R. Allan, P. Crossley, D. Kirschen and G. Strbac, Embedded Generation, p.31-38, 2000.
|
11 |
Roy Billinton and Y. Gao, "Multi-state Wind Energy Conversion System Models for Adequacy Assessment of Generating Systems Incorporating Wind Energy," IEEE Transactions on Energy Conversion, Vol.23, No.2, pp.163-170, 2008.
DOI
ScienceOn
|
12 |
D. Divan, G.A. Luckjiff, J.W. Freeborg, W. Brumsickle, D. Bielinski and T. Grant, " : A New Paradigm in Distribution Grid Power Quality And Reliability Monitoring," in Proceedings of EPRI PQA North America Conference. Portland, OR, 2002.
|
13 |
T. E. Dy-Liacco, "Enabling Technologies for Operation and Real-Time Control in a Liberalized Environment," EPRI second European conference, 1999.
|
14 |
Roy Billinton and L. Gan, "Wind Power Modeling and Application in Generating Adequacy Assessment," in Proceedings of the 14th Power Systems Computation Conference, Sevilla, Spain, 2000.
|
15 |
Jeongje Park, Liang Wu, Jaeseok Choi, A. A. El-Keib and Junzo Watada, "Probabilistic Production Cost Credit Evaluation of Wind Turbine Generators" IJICIC(International Journal of Innovative Computing, Information and Control), Vol.5, No.11(A), pp.3637-3646, November, 2009.
|
16 |
Roy Billinton and Dange Huang, "Aleatory and Epistemic Uncertainty Considerations in Power System Reliability Evaluation", PMAPS'08, Puerto Rico, May 25-29, 2008.
|