• Title/Summary/Keyword: wind resources

Search Result 573, Processing Time 0.028 seconds

The Estimaion of Wind Energy Resources through out the QuikSCAT Data (위성 관측 자료를 이용한 서해 해상 풍력자원 평가)

  • Jang, Jea-Kyung;Yu, Byoung-Min;Ryu, Ki-Wahn;Lee, Jun-Shin
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.486-490
    • /
    • 2009
  • In order to investigate the offshore wind resources, the "QuikSCAT Level 3" data by the QuikSCAT satellite was analyzed from Jan 2000 to Dec 2008. QuikSCAT satellite is a specialized device for a microwave scatterometer that measures near-surface wind speed and direction under all weather and cloud conditions. Wind speed measured at 10 m above from the sea surface as extrapolated to the hub height by using the power law model. It has been found that the high wind energy prevailing in the south sea and the east sea of the Korean peninsula. From the limitation of seawater depth for piling the tower and archipelagic environment around the south sea, the west and the south-west sea are favorable to construct the large scale wind farm. Wind map and monthly variation of wind speed are investigate at the positions.

  • PDF

Characteristics of Vertical Variation of Wind Resources in Planetary Boundary Layer in Coastal Area using Tall Tower Observation (타워 관측 자료를 이용한 연안 대기 경계층 내 바람 자원의 연직 변동 특성)

  • Yoo, Jung-Woo;Lee, Hwa-Woon;Lee, Soon-Hwan;Kim, Dong-Hyeok
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.28 no.6
    • /
    • pp.632-643
    • /
    • 2012
  • Analysis of wind resources in Planetary Boundary Layer (PBL) using long term observation of tall tower located near coast line of the Korean Peninsula were carried out. The data observed at Pohang, Gunsan and Jinhae are wind, temperature and relative humidity with 10 minute interval for one year from 1 October 2010. Vertical turbulence intensity and its deviation at Pohang site is smaller than those of other sites, and momentum flux estimated at 6 vertical layers tend to show small difference in Pohang site in comparison with other sites. The change of friction velocity with atmospheric stability in Pohang is also not so great. These analysis indicate the mechanical forcing due to geographical element of upwind side is more predominant than thermal forcing. On the other hand, wind resources at Gunsan and Jinhae are mainly controlled by thermal forcing.

Study on the Prediction of Wind Power Outputs using Curvilinear Regression (곡선회귀분석을 이용한 풍력발전 출력 예측에 관한 연구)

  • Choy, Youngdo;Jung, Solyoung;Park, Beomjun;Hur, Jin;Park, Sang ho;Yoon, Gi gab
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.4
    • /
    • pp.627-630
    • /
    • 2016
  • Recently, the size of wind farms is becoming larger, and the integration of high wind generation resources into power gird is becoming more important. Due to intermittency of wind generating resources, it is an essential to predict power outputs. In this paper, we introduce the basic concept of curvilinear regression, which is one of the method of wind power prediction. The empirical data, wind farm power output in Jeju Island, is considered to verify the proposed prediction model.

Analysis of Wind Resources of the South Seashore of JeonNam Province (전남지역 남해안 풍력자원조사 연구)

  • Kim, Young-Chan;Chung, Chin-Wha;Lee, Eung-Chae;Chun, Ch.-H.;Han, Kyung-Seop;Kim, Yong-Whan
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.281-285
    • /
    • 2006
  • As the needs of wind energy increase, the more sites for the wind farm are required. As a part of searching for the prominent wind farm site, specially for offshore wind farm, we chose 4 sites along the southern part seashore of JeonNam province based on the analysis of the data gathered by meteorological observatory ud have gathered wind data for more than a year by use of 40m Met masts installed in the representative locations, ie. small islands of 4 different bay area. The siting for the Met masts were very limited by the geographical circumstances The wind data of those areas show a little lower annual average wind speeds, for the wind farm development, of 4m/s to 5.5m/s at the height of 40m above the ground level of the respective islands. The detail figures of one year wind data of those area are presented in this report.

  • PDF

Assessment of Wind Energy Potentiality in Wolryong using Short-term Observation (단기관측에 의한 월령 연안지역 풍력에너지 잠재량 평가)

  • Jeong, Tae-Yoon;Lim, Hee-Chang
    • New & Renewable Energy
    • /
    • v.5 no.4
    • /
    • pp.11-18
    • /
    • 2009
  • Wind energy resources are recently considered as an important power generation alternative in the future. The fact that the investment of wind turbine installation continues to increase has motivated a need to develop more widely applicable methodologies for evaluating the actual benefits of adding wind turbines to conventional generating systems. This study is aiming to estimate the future wind resources with various estimation methods. The wind power is calculated at the hub height 75m of 800KW and 1,500KW wind turbines in Wolryong site, Jeju island, South Korea. Three equations - logarithmic, profile, and power law methods are applied for the accurate prediction of wind profile. In addition, yearly wind power can be calculated by using Weibull & Rayleigh distribution. It is found that predicted wind speed is highly affected by friction velocity, atmospheric stability, and averaged roughness length. It is concluded that Rayleigh distribution provides greater power generation than the Weibull distribution, especially for low wind-speed condition.

  • PDF

Wind Resource Assessment on the Western Offshore of Korea Using MERRA Reanalysis Data (MERRA 재해석자료를 이용한 서해상 풍력자원평가)

  • Kim, Hyun-Goo;Jang, Moon-Seok;Ryu, Ki-Wahn
    • Journal of Wind Energy
    • /
    • v.4 no.1
    • /
    • pp.39-45
    • /
    • 2013
  • Massive offshore wind projects of have recently been driven in full gear on the Western Offshore of Korea including the 2.5 GW West-Southern Offshore Wind Project of the Ministry of Trade, Industry and Energy, and the 5 GW Offshore Wind Project of the Jeollanamdo Provincial Government. On this timely occasion, this study performed a general wind resource assessment on the Western Offshore by using the MERRA reanalysis data of temporal-spatial resolution and accuracy greatly improved comparing to conventional reanalysis data. It is hard to consider that wind resources on the Western Sea are excellent, since analysis results indicated the average wind speed of 6.29 ± 0.39 m/s at 50 m above sea level, and average wind power density of 307 ± 53 W/m2. Therefore, it is considered that activities shall be performed for guarantee economic profits from factor other than wind resources when developing an offshore wind project on the Western Offshore.

Establishment of a Wind Map of the Korean Peninsula I. Evaluation of Offshore Wind Resources Using Remote-Sensing Data (한반도 바람지도 구축에 관한 연구 I. 원격탐사자료를 이용한 해상풍력자원 평가)

  • Kim Hyun-Goo;Lee H.W;Jung W.S
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.21 no.1
    • /
    • pp.63-72
    • /
    • 2005
  • In order to understand regional wind characteristics and to estimate offshore wind resources, a wind map of the Korean Peninsula was established using remote-sensing data from the satellite, U.S. NASA Quik SCAT which has been deployed for the Sea Winds Project since 1999. According to the linear regression result between the wind map data and in-situ marine-buoy data, the correlation factor was greatly improved up to 0.87 by blending the remote-sensing data of Quik SCAT with U.S. NCEP/NCAR CDAS reanalysis data to eliminate precipitation interference and to increase temporal resolution. It is found from the established wind map that the wind speed in winter is prominent temporally and the South Sea shows spatially high energy density over the wind class 6. The reason is deduced that the north-west winds through the Yellow Sea and the north-east winds through the East Sea derived by the low pressure developed in Japan are accelerated passing through the Korea Channel and formed high wind energy region in the South Sea; the same trends are confirmed from the statistical analysis of the meteorological observation data of KMA.

Analysis of Wind Environments for Siting a Wind Farm (풍력발전 단지조성을 위한 바람환경 분석)

  • 김현구;최재우;손정봉;정우식;이화운
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.19 no.6
    • /
    • pp.745-756
    • /
    • 2003
  • An analysis of wind environments using computational fluid dynamics and an evaluation of wind resources using measurement data obtained from meteorological observation sites at Homi-Cape, Pohang have been carrid out for siting a wind farm. It was shown that a numerical simulation using computational fluid dynamics would provide reliable wind resource map in complex terrain with land-sea breeze condition. As a result of this investigation, Homi-Cape wind farm with 11.25 ㎿ capacity has been designed for maximum power generation and 25.7 GWh electricity production is predicted.

Assessment and Agricultural Use of Wind Resources in Southern Part of Gyeonygi Province (경기 남부지역 풍력자원의 평가와 농업분야 활용방안)

  • Hong, Seong-Gu
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.3
    • /
    • pp.73-82
    • /
    • 2006
  • Wind energy is one of the promising renewable energies that could provide electricity and other mechanical power. Wind energy market is dramatically growing in many European countries, but wind power is only 0.2% of the total renewable energy uses that is only about 2% of the primary energy consumption in Korea. It is widely accepted that wind resources fur power generation are only limited in some areas including coastal regions and mountainous areas in Gangwon province in Korea, particularly in terms of large scale wind power developments. In this study, wind velocity data were analyzed with respect to the potential utilization. The data provided from National Weather Service were used for the analysis. In addition, field wind data were also collected and analyzed for the comparison between the national data. The comparison showed that there were significant differences between the experimental station and the national station that are about 5km away. Annual average wind speed at the experimental station was less than 2 m/s, which is not enough fur wind power generation. It seemed that the topographic condition resulted in a significant difference in wind speed. When 600 W and 2.5 kW wind turbines were used, annual power productions were only 186 kWh and 598 kWh, respectively. When the average wind speed is lower, wind pumping is an alternative use of wind. At the experimental station, the average pumping rate of $3m^3/h$ at the head of 3 m was expected at a 2.5 m rotor under the conditions that efficiencies of the rotor and the pump were 40% and 80%, respectively. It did not seem that the wind pumping was not applicable at the station either. A higher wind speed was required to install the wind machines. Meanwhile, wind pumping would be applicable in conditions with lower pumping heads. Other applications were introduced far further wind energy utilization, including wind powered ventilation and friction heat generation in greenhouses.

Assessment of Wind Power Resources for Rural Green-village Planning (농촌 그린빌리지 계획을 위한 풍력에너지 자원분석)

  • Nam, Sang-Woon;Kim, Dae-Sik
    • Journal of Korean Society of Rural Planning
    • /
    • v.14 no.2
    • /
    • pp.25-32
    • /
    • 2008
  • Wind energy, which is one of renewable energy, would be useful resources that can be applied to making energy recycling villages without using fossil fuels. This study analyzed energy potential on wind power considering weather condition in three rural villages and compared with energy consumption surveyed. A wind turbine system in the 5kW class can generate 26.1%, 73.9% and 39.5% of the yearly mean consumption of electric power per house in Makhyun, Boojang and Soso respectively. A 750kW wind turbine system can generate 1.7%, 30.3% and 22.1% of the total amount of electric power consumption in three study villages respectively. Wind power energy density was too low in Makhyun and Soso, so it is determined that the application of wind turbine system is almost impossible. Wind energy potential was generally low in Boojang either, but it is evaluated that there is a little possibility of wind power generation relatively. For practical application of renewable energy to rural green-village planning, assessment of energy potential for the local area should be preceded.