Jo, Jung-Hyun;Seo, Yoon-Kyung;Lee, Jin-Young;Yim, Hong-Seo;Lim, Hyung-Chul;Park, Eun-Seo;Park, Jang-Hyun;Park, Jong-Uk
한국우주과학회:학술대회논문집(한국우주과학회보)
/
한국우주과학회 2010년도 한국우주과학회보 제19권1호
/
pp.36.2-36.2
/
2010
Followed the System Design Review (PDR) of a mobile SLR (Satellite Laser Ranging) system, a successful preliminary design review was finished in 2009. With the completion of this mobile SLR system, KASI (Korea Astronomy and Space Science Institute) can perform a series of test observation and calibration/validation procedures. After the operation performance of the whole system reaches the nominal design, a regular scheduled observation will be executed. However, the project has been disturbed by the frequent change of working staff, budget profile, and plan as well as the inexperienced man power. In this study, the contents and the issues of PDR are briefly reviewed and several items of SLR system are suggested. This mobile SLR system will push Korea's Space Geodetic study further and will make us jump to another step to the Space Science in Korea.
Torii, Kiyoshi;Yoo, K.H.;Bari, Muhammad F.;Naz, Maheen
대한원격탐사학회:학술대회논문집
/
대한원격탐사학회 2003년도 Proceedings of ACRS 2003 ISRS
/
pp.1430-1432
/
2003
Agricultural areas in the north region of Bangladesh suffer from water shortages during the dry season as well as dry spells in the monsoon period. The Teesta Barrage was constructed in 1990 to provide supplemental irrigation water during the monsoon period. After completion of the project high yielding variety of crops were introduced more in the project area. Due to this reason unforeseen needs of irrigation water during the dry season has emerged. This study reviews the current irrigation status and related constraints to a full development of the project and provides suggestions for future improvement of the project. Also suggested is to apply remote sensing technique for the management of the system as a whole. Use of remote sensing technique for the management of irrigation water resources is a new approach in Bangladesh. Application of such a powerful tool will provide better management options for large-scale irrigation projects in the country.
In apartment housing construction, window frame installation work, which is conducted after the structural framework, is very important, because its completion time directly affects the starting time of successive interior finishing works, as well as the overall construction period. Construction delays in interior finishing works might occur due to problems inherent to the conventional window frame installation method, such as the poor verticality of window frames, and the water leakage around them. The primary objective of this study is to analyze the problems of a 'Gangform integrated PVC window frame pre-installation method' based on its pilot test results. Next, this study proposes an improved conceptual model that enables the end users to enhance the field applicability of this method in terms of productivity, time, and cost. The field applicability of the proposed 'Gangform integrated PVC window frame pre-installation method' was also verified through a survey.
터널시공 중 터널 완공 후에 발생할 최종변위를 미리 예측하는 것은 터널의 역학적 안정성을 평가하는데 중요하다. 시공 중인 터널에서 계측한 천단 및 내공변위와 변위함수를 이용하여 터널을 시공 완료하였을 때 발생할 터널의 최종변위를 예측하였다. 연구대상 터널은 상반과 하반으로 나누어 시공하였고 터널상반 시공 중 설치한 계측핀을 이용하여 하반막장이 이 계측핀을 통과할 때 발생한 초기변위를 계측할 수 있었다. 터널하반 시공 중 계측한 변위를 이용하여 하반굴착에 따른 변위 증가량을 변위함수로 예측한 결과 터널시공 완료 후 계측한 증가량과 거의 같았다.
As the visual effect frequently used in movies or animations, special effects are well suited for the creation of buildings or materials' destruction and collapse scenes. With the relevant programs developing technologically, the adoption of a real-time physically based-system makes it possible to realistically express dynamic simulations. In the large scale, the visual expression of such effects of destroying is satisfying enough, but most common programs of those effects fail to maximize visual effect generated with the cutting of small materials. Besides, to perform a heavy simulation process needs high-performance hardware and programs, where high costs would become a serious issue. For this reason, this paper suggests a solution optimized for the effect of small materials-cutting. The progress of each step shows technologies which trace movement with the state of the completion of the character's motions and then cut the material in real-time, finally led to the very realistic visual effect. Besides, using vector inner calculation to follow the motions of object and to realize cutting effect, this study provides an experiment that constructs visual effect for visualization from the basis of mathematical algorithm and it would be certainly as an educational material used for further researches.
This paper is a feasibility study on the calculation of operating cost in regards to the overall operation following the completion of a number of LRT lines currently in progress. Owing to the absence of operating experience in driveless LRT system at home, the difficulties lie in the assumption of the optimal operating budget applying domestic real situation. Nevertheless, with 34 years of accumulated operating experience in heavy rail transit system, Seoul Metro, the nation's biggest urban rail transit operator, performs O&M consultancy services for several on-going projects along with every effort to acquire know-how where the appropriateness of the cost estimation as a required deliverable is reviewed and a more efficient way is provided. The main focus of this study is to seek a method to calculate the optimal amount of operating expenses as well as a cost-effective alternative for possible weaknesses from the standpoint of the operator. The body of this paper discusses the five issues such as personnel cost, overhead, maintenance cost, additional purchase price, alternative investment fee from a more macroscopic point of view, and the conclusion deals with the adequacy of the reason for selection of institutions with various operating know-how.
KSII Transactions on Internet and Information Systems (TIIS)
/
제13권8호
/
pp.4108-4122
/
2019
Workflow process mining is becoming a more and more valuable activity in workflow-supported enterprises, and through which it is possible to achieve the high levels of qualitative business goals in terms of improving the effectiveness and efficiency of the workflow-supported information systems, increasing their operational performances, reducing their completion times with minimizing redundancy times, and saving their managerial costs. One of the critical challenges in the workflow process mining activity is to devise a reasonable approach to discover and recognize the bottleneck points of workflow process models from their enactment event histories. We have intuitively realized the fact that the iterative process pattern of redo-activities ought to have the high possibility of becoming a bottleneck point of a workflow process model. Hence, we, in this paper, propose an algorithmic approach and its implementation to discover the redo-activities and their performers' involvements patterns from workflow process enactment event logs. Additionally, we carry out a series of experimental analyses by applying the implemented algorithm to four datasets of workflow process enactment event logs released from the BPI Challenges. Finally, those discovered redo-activities and their performers' involvements patterns are visualized in a graphical form of information control nets as well as a tabular form of the involvement percentages, respectively.
Kim, Min-kyung;Lee, Sang-im;Jablonski, Piotr G.;Lee, Sang-Don
Journal of Ecology and Environment
/
제42권4호
/
pp.285-291
/
2018
The impact of climate change on animals has been globally documented. Especially, migration of birds has been extensively monitored as migratory birds are susceptible to any changes occurring both on breeding grounds and on wintering grounds. However, in contrast to spring migration, the patterns and the factors for autumn migration have not been well documented. In this study, we investigated the relationship with climate condition and the first arrival dates (FADs) of bean geese (Anser fabalis) and white-fronted geese (A. albifrons), the representative group of wintering birds in South Korea, using the data collected by Korean Meteorological Association during 1995-2016. Average temperature of September in wintering grounds has increased, and the FADs of the geese have advanced over the 22 years. Even when the influence of autumn temperature was statistically controlled for, the FADs of the geese have significantly advanced. This suggests that warming has hastened the completion of breeding, which speeded up the arrival of the geese at the wintering grounds. In order to assess the effect of climate condition on the arrival of the wintering migratory birds such as the geese in more detail, extensive data collection over many sampling sites and with long-term monitoring is needed.
This study examined the construction method shown in literatures and materials discovered in rampart, barbican and guard platform for Cheongdo-Eupseong castle which was constructed immediately before Japanese Invasions of Korea (1592-98). According to the result of the examination, the construction method used in the coastal areas and inland areas of Gyeongsang province in the early Joseon period was applied to the rampart, barbican and guard platform in the east and north castle walls, which was constructed earlier than other parts of Cheongdo-Eupseong castle. However, from the western end of the northern castle wall, which was later constructed, to the western castle wall was rebuilt using a construction method different from the method applied to the parts that were constructed earlier after Japanese Invasions of Korea. Cheongdo-Eupseong castle was constructed on a flatland on a large scale and at a low height under unreasonable pressures to construct the castle in a short period of time for military defense as well as civil agitation in the imminent situation just before the outbreak of Japanese Invasions of Korea. In addition, various methods of constructing Eupseong castle utilized at that time were used together, and barbican and guard platform were built generally focusing on rapid completion and convenience, using other methods than the one mainly used at that time. This is the reason why there was a difference in the characteristics of the method and period of castle construction between Cheongdo-Eupseong castle and other Eupseong castles in the coastal areas and inland areas of Gyeongsang province.
L/C(Letter of Credit) is a common payment term designed to prevent credit risk in international trade. However, most companies prefer T/T (Telegraphic Transfer) payment due to its time and cost efficiency. According to related statistics, more than 70% of international trade contracts are based on T/T rather than other payment terms. The time required from the export negotiation to the completion of the export transaction and collection in international trade is very long. In this process, disputes related to settlement are continuous, so caution should be exercised. Therefore, whether or not the export payment is recovered in a timely manner is the core issue of trade transactions for exporters. The purpose of this study is to identify problems that cause delayed payments during settlement by the remittance (T/T) method, which can lead to settlement risk, in order to investigate those factors which can lead to delays in payments and increased risk as well as to determine ways to prevent such factors in advance. According to empirical findings, trading experience, transaction duration, and contract contents can be important determinants in terms of payment delays. Industry uniqueness and market uncertainty were found to be in opposition to the hypothesized relationships. The results of this study will be useful for trading companies to reduce their payment risk.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.