• Title/Summary/Keyword: water pressure in tunnel

Search Result 238, Processing Time 0.022 seconds

The review about ultra long subsea tunnel design under high water pressure (고수압 초장대 해저터널에 관한 연구)

  • Jun, Duk-Chan;Kim, Ki-Lim;Hong, Eui-Joon;Kim, Chan-Dong;Lee, Young-Joon;Hong, Cheor-Hwa
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.829-843
    • /
    • 2017
  • Subsea tunnel needs to be built over 50 km long to connect between nations and continents. However there are only 19 tunnels longer than 5 km until recently. And there is no history of constructing and operating tunnel longer than 50 km. In Korea, subsea tunnels with a length of more than 50 km are being planned, such as Korea~Japan, Korea~China, Honam~Jeju subsea tunnels. Because of the geographical conditions of Korea, most of these tunnels are inter-contry tunnels. So technology preemption for the subsea tunnel construction is getting more and more important. Most of these subsea tunnels are ultra-long tunnels under high water pressure conditions. So new technologies are required such as ventilation and disaster prevention of high-speed tunnels, securing of structural stability under high pressure conditions, and pressure reduction in high-speed conditions. These technologies are different from those of ground tunnels. Therefore, this paper describes the ultra-long subsea tunnel design under high water pressure of maximum 16 bars through the Honam (land) - Jeju (island) virtual subsea project. We proposed a reasonable solution to various problems such as securing structural stability in high pressure condition and ventilation disaster prevention system of ultra long-tunnel.

Face stability analysis of rock tunnels under water table using Hoek-Brown failure criterion

  • Li, T.Z.;Yang, X.L.
    • Geomechanics and Engineering
    • /
    • v.18 no.3
    • /
    • pp.235-245
    • /
    • 2019
  • This paper presents a novel methodology for face stability assessment of rock tunnels under water table by combining the kinematical approach of limit analysis and numerical simulation. The tunnels considered in this paper are excavated in fractured rock masses characterized by the Hoek-Brown failure criterion. In terms of natural rock deposition, a more convincing case of depth-dependent mi, GSI, D and ${\sigma}_c$ is taken into account by proposing the horizontally layered discretization technique, which enables us to generate the failure surface of tunnel face point by point. The vertical distance between any two adjacent points is fixed, which is beneficial to deal with stability problems involving depth-dependent rock parameters. The pore water pressure is numerically computed by means of 3D steady-state flow analyses. Accordingly, the pore water pressure for each discretized point on the failure surface is obtained by interpolation. The parametric analysis is performed to show the influence of depth-dependent parameters of $m_i$, GSI, D, ${\sigma}_c$ and the variation of water table elevation on tunnel face stability. Finally, several design charts for an undisturbed tunnel are presented for quick calculations of critical support pressures against face failure.

Analysis on the effect of strength improvement and water barrier by tunnel grouting reinforcement (터널 그라우팅 보강에 의한 차수 및 강도 증가효과의 분석)

  • You, Kwang-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.4
    • /
    • pp.291-304
    • /
    • 2011
  • Recently concern for subsea tunnels is increasing, The effect of high water pressure can not be ignored in the case of a deep subsea tunnel. Reinforcement like grouting is necessary for the stability of such a subsea tunnel. In this study, therefore, it was investigated how the water barrier and shear strength increment resulted from grouting had an effect on the stability of a subsea tunnel. To this end, two-dimensional hydromechanical coupled analyses were performed for a sensitivity analysis in terms of different range, permeability coefficient, and cohesion of grouting reinforcement for the rock classes I, III, and V with respect to RMR system. The mutual relationship between strength increment and water pressure increased by barrier effect due to grouting was investigated by analyzing the numerical results.

A Study on the Design Loads of NATM Tunnel Concrete Lining (NATM 터널 콘크리트라이닝 설계하중에 관한 연구)

  • 천병식;신영완
    • Tunnel and Underground Space
    • /
    • v.11 no.2
    • /
    • pp.96-108
    • /
    • 2001
  • A concrete lining of NATM tunnel is the final product of a process that involves planning and evaluation of user needs, geotechnical investigations, analysis of ground-lining interaction, construction, and observations and modifications during construction. The designer must consider the lining in context of the many function, construction, and geotechnical requirements. Also, the loss of supporting capacity of shotcrete lining due to poor rock qualities and shotcrete erosion must be considered. The values, shapes, and estimating methods of rock load and water pressure are very different with every designers. Estimating methods of rock loads used in the design of NATM tunnel concrete lining are investigated. Structural analyses are done in various load combinations, and the member forces(moment, axial force and shear force) are compared. The adequate load combination of rock load and water pressure is proposed.

  • PDF

An Experimental Study on Performance of neater Stops at Construction joints in Tunnel (터널 시공이음부에서의 방수재 역할에 대한 실험연구)

  • 백송훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.217-223
    • /
    • 1999
  • Mostly, water leakage took place in construction joints. In case of cable tunnels constructed by open-cut method, waterstops have been used to prevent the water leakage. But, we haven't any experience to install the waterstops in NATM cable tunnels. So, it is necessary to develope the waterstops and test the performance of it in laboratory. We manufactured cable tunnel lining quarter scale model by pouring concrete, and installed the waterstops. After filling the inside of concrete lining about two-third with water, we put the air pressure on the water, In addition, it is also carried out water leakage test for concrete lining model without waterstops. As a result, we confirmed the performance of waterstops and its adaptability. It is also tested that the performance of rubber gaskets used in concrete segments of Shield tunnelling. In addition, we determined the allowable infiltration rate for cable tunnel with non-drainage system.

  • PDF

Design and Construction of Bottom Drainage Tunnel and the Watertight Tunnel (배수형 터널과 방수형 터널의 설계와 시공)

  • Kim, Seung-Ryeol;Park, Gwang-Jun;Park, Bong-Gi
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.03a
    • /
    • pp.49-58
    • /
    • 1993
  • Reappraisal of the design and the construction concept of the bottom drainage tunnel has been made through the seepage analysis. An appropriate design approach for this tunnel has also been proposed. It was revealed from this study that water pressures acting on the concrete lining in the bottom dralnage tunnel much depend on the permeability of the surrounding ground, the source of water supply and the discharge capacity of dralnage facilities. The full release of these water pressures by the current drainage system could not be expected if this type of tunnel is constructed in the ground including alluvial deposits having a high permeability. The necessity of a proper reinforcement of the concrete lining or a modification of its shapes corresponding to the water pressure has been suggested.

  • PDF

A Physical Model Test on the Behavior of Shield-tunnel Lining According to Drainage Conditions in Weathered Granite Soil (화강풍화토 지반에서 배수조건에 따른 쉴드터널 라이닝의 거동연구를 위한 모형실험)

  • Choi, Gou-Moon;Yune, Chan-Young;Ma, Sang-Joon
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.6
    • /
    • pp.71-82
    • /
    • 2015
  • Recently, due to the expansion of urban infrastructure for the citizen convenience, the shield tunnel construction has increased considering the civil complaints minimization and construction stability. Most shield tunnels are designed based on the assumption of the undrained condition that underground water does not inflow, but they are operated in the field as drained tunnels with drainage facility to drain underground water. Therefore, the drained condition needs to be considered in the shield tunnel design. It is also necessary to consider the weathered granite soil that is widely distributed throughout the country and consequently is encountered in most of construction sites. In this paper, the model test which can control total stress and pore water pressure and simulate the underground tunnel located in the weathered granite soil below ground water level is conducted. Total stress, pore water pressure and an inflow water into an inner pipe were measured using the testing device. Test results showed that the total stress in a drained condition was lower than in an undrained condition because pore water pressure decreased in a drained condition and an inflow water into an inner pipe was proportional to the loading stress in a drained condition. As a result, if a drained condition is considered in the shield tunnel design, the more economical design can be expected because of the stress reduction of the lining.

Significance of Ground Water Movements in the Numerical Modelling of Tunnelling (터널해석에 있어 지하수 거동의 중요성)

  • 신종호
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.257-264
    • /
    • 2003
  • Tunnelling in water bearing soils influences the ground water regime. It has been indicated in the literature that the existence of ground water above a tunnel influences tunnel stability and the settlement profile. Only limited research, however, has been done on ground water movements around tunnels and their influence on tunnel performance. Time dependent soil behaviour can be caused by the changes of pore water pressure and/or the viscous properties of soil(creep) under the stress change resulting from the advance of the tunnel face. De Moor(1989) demonstrated that the time dependent deformations due to tunnelling are mainly the results of pore pressure dissipation and should be interpreted in terms of effective stress changes. Drainage into tunnels is governed by the permeability of the soil, the length of the drainage path and the hydraulic boundary conditions. The potential effect of lime dependent settlement in a shallow tunnel is likely to occur rapidly due to the short drainage path and possibly high coefficient of consolidation. Existing 2D modelling methods are not applicable to these tunnelling problems, as it is difficult to define empirical parameters. In this paper the time-based 2D modelling method is adopted to account for the three dimensional effect and time dependent behaviour during tunnel construction. The effect of coupling between the unloading procedure and consolidation during excavation is profoundly investigated with the method. It is pointed out that realistic modelling can be achieved by defining a proper permeability at the excavation boundary and prescribing appropriate time for excavation Some guidelines for the numerical modelling of drained and undrained excavation has been suggested using characteristic time factor. It is highlighted that certain range of the factor shows combined effect between the unloading procedure due to excavation and consolidation during construction.

  • PDF

A two-step interval risk assessment method for water inrush during seaside tunnel excavation

  • Zhou, Binghua;Xue, Yiguo;Li, Zhiqiang;Gao, Haidong;Su, Maoxin;Qiu, Daohong;Kong, Fanmeng
    • Geomechanics and Engineering
    • /
    • v.28 no.6
    • /
    • pp.573-584
    • /
    • 2022
  • Water inrush may occur during seaside urban tunnel excavation. Various factors affect the water inrush, and the water inrush mechanism is complex. In this study, nine evaluation indices having potential effects on water inrush were analysed. Specifically, the geographic and geomorphic conditions, unfavourable geology, distance from the tunnel to sea, strength of the surrounding rock, groundwater level, tidal action, cyclical footage, grouting pressure, and grouting reinforced region were analysed. Furthermore, a two-step interval risk assessment method for water inrush management during seaside urban tunnel excavation was developed by a multi-index system and interval risk assessment comprised of an interval analytic hierarchy process, fuzzy comprehensive evaluation, and relative superiority analysis. The novel assessment method was applied to the Haicang Tunnel successfully. A preliminary interval risk assessment method for water inrush was performed based on engineering geological conditions. As a result, the risk level fell into a risk level IV, which represents a section with high risk. Subsequently, a secondary interval risk assessment method was performed based on engineering geological conditions and construction conditions. The risk level of water inrush is reduced to a risk level II. The results agreed with the current tunnel situation, which verified the reliability of this approach.

Site Investigation and stability analysis for water tunnel being neighboring construction (근접시공에 대한 수로터널 지반조사 및 안정성 분석)

  • Jeon, Je-Sung;Kim, Ki-Young;Lee, Sang-Duk;Kim, Doo-Jun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.550-555
    • /
    • 2005
  • In vicinity of Seoul, there has been water service tunnel that classified into 1st grade facility by special act for the safety control of public structures and with providing capacity equals to $1,543{\times}10^3$(ton/day) and inner pressure equals to $2.5-3.5kg/cm^2$. In this research, site investigation and stability analysis for water tunnel caused by new construction of road tunnel were carried out. the ground near water tunnel were zoned into spatial area having similar geotechnical characteristics and estimating geotechnical properties for each area. The site for analysis consists of banded biotite gneiss, biotite schist and granite gneiss with spatial non-homogeneity, and for that reason weathering and fault zone were distributed with large scale. It's important thing to consider spatial ground zone and their geotechnical properties properly into stability analysis at design and construction stage. Also, using results of site investigation, stability of existing tunnel have been analyzed for Hydraulic Fracture/Jacking and deformation in detail.

  • PDF