• Title/Summary/Keyword: water need

Search Result 1,945, Processing Time 0.026 seconds

Evaluation Of LoRaWAN In A Highly Dense Environment With Design Of Common Automated Metering Platform (CAMP) Based On LoRaWAN Protocol

  • Paul, Timothy D;Rathinasabapathy, Vimalathithan
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.16 no.5
    • /
    • pp.1540-1560
    • /
    • 2022
  • Latest technological innovation in the development of compact lower power radios has led to the explosion of Internet of Things. With Wi-Fi, Zigbee and other physical layer protocols offering short coverage area there was a need for a RF protocol that had a larger coverage area with low power consumption. LoRa offers Long Range with lower power consumption. LoRa offers point to point and point to multipoint connections. with Single hop communication in place the need for routing protocols are eliminated. LoRa Wide Area Network stack can accommodate thousands of nodes under a single LoRa gateway with a single hop communication between the end nodes and LoRaWAN gateway. This paper takes an experimental approach to analyze the basic physical layer parameters of LoRa and the practical coverage offered by a LoRaWAN under highly dense urban conditions with variable topography. The insights gained from the practical deployment of the LoRaWAN network, and the subsequent performance analysis is used to design a novel public utility monitoring platform. The second half of the papers is designing a robust platform to integrate both existing wired sensor water meters, current and future generation wireless water meters. The Common Automated Metering Platform is designed to integrate both wired sensors and wireless (LoRaWAN and Wi-Fi) supported water meters. This integrated platform reduces the number of nodes under each LoRaWAN gateway and thus improves the scalability of the network. This architecture is currently designed to accommodate one utility application but can be modified to integrate multi-utility applications.

Regional Development And Dam Construction in Korea (한국의 지역개발과 댐건설)

  • 안경모
    • Water for future
    • /
    • v.9 no.1
    • /
    • pp.38-42
    • /
    • 1976
  • Because of differences in thoughts and ideology, our country, Korea has been deprived of national unity for some thirty years of time and tide. To achieve peaceful unification, the cultivation of national strength is of paramount importance. This national strength is also essential if Korea is to take rightful place in the international societies and to have the confidence of these societies. However, national strength can never be achieved in a short time. The fundamental elements in economic development that are directly conducive to the cultivation of national strength can be said to lie in -a stable political system, -exertion of powerful leadership, -cultivation of a spirit of diligence, self-help and cooperation, -modernization of human brain power, and -establishment of a scientific and well planned economic policy and strong enforcement of this policy. Our country, Korea, has attained brilliant economic development in the past 15 years under the strong leadership of president Park Chung Hee. However, there are still many problems to be solved. A few of them are: -housing and home problems, -increasing demand for employment, -increasing demand for staple food and -the need to improve international balance of payment. Solution of the above mentioned problems requires step by step scientific development of each sector and region of our contry. As a spearhead project in regional development, the Saemaul Campaign or new village movement can be cited. The campaign is now spreading throughout the country like a grass fire. However, such campaigns need considerable encouragement and support and the means for the desired development must be provided if the regional and sectoral development program is to sucdceed. The construction of large multipurpose dams in major river basin plays significant role in all aspects of national, regional and sectoral development. It ensures that the water resource, for which there is no substitute, is retained and utilized for irrigation of agricultural areas, production of power for industry, provision of water for domestic and industrial uses and control of river water. Water is the very essence of life and we must conserve and utilize what we have for the betterment of our peoples and their heir. The regional and social impact of construction of a large dam is enormous. It is intended to, and does, dras tically improve the "without-project" socio-economic conditions. A good example of this is the Soyanggang multipurpose dam. This project will significantly contribute to our national strength by utilizing the stored water for the benefit of human life and relief of flood and drought damages. Annual average precipitation in Korea is 1160mm, a comparatively abundant amount. The catchment areas of the Han River, Keum River, and Youngsan River are $62,755\textrm{km}^2$, accounting for 64% of the national total. Approximately 62% of the national population inhabits in this area, and 67% of the national gross product comes from the area. The annual population growth rate of the country is currently estimated at 1.7%, and every year the population growth in urban area increases at a rising rate. The population of Seoul, Pusan, and Taegu, the three major cities in Korea, is equal to one third of our national total. According to the census conducted on October 1, 1975, the population in the urban areas has increased by 384,000, whereas that in rural areas has decreased by 59,000,000 in the past five years. The composition of population between urban and rural areas varied from 41%~59% in 1959 to 48%~52% in 1975. To mitigate this treand towards concentration of population in urban areas, employment opportunities must be provided in regional and rural areas. However, heavy and chemical industries, which mitigate production and employment problems at the same time, must have abundant water and energy. Also increase in staple food production cannot be attained without water. At this point in time, when water demand is rapidly growing, it is essential for the country to provide as much a reservoir capacity as possible to capture the monsoon rainfall, which concentarated in the rainy seaon from June to Septesmber, and conserve the water for year round use. The floods, which at one time we called "the devil" have now become a source of immense benefit to Korea. Let me explain the topographic condition in Korea. In northern and eastern areas we have high mountains and rugged country. Our rivers originate in these mountains and flow in a general southerly or westerly direction throught ancient plains. These plains were formed by progressive deposition of sediments from the mountains and provide our country with large areas of fertile land, emminently suited to settlement and irrigated agricultural development. It is, therefore, quite natural that these areas should become the polar point for our regional development program. Hower, we are fortunate in that we have an additional area or areas, which can be used for agricultural production and settlement of our peoples, particularly those peoples who may be displaced by the formation of our reservoirs. I am speaking of the tidelands along the western and southern coasts. The other day the Ministry of Agriculture and Fishery informed the public of a tideland reclamation of which 400,000 hectares will be used for growing rice as part of our national food self-sufficiency programme. Now, again, we arrive at the need for water, as without it we cannot realize this ambitious programme. And again we need those dams to provide it. As I mentioned before, dams not only provide us with essential water for agriculture, domestic and industrial use, but provide us with electrical energy, as it is generally extremely economical to use the water being release for the former purposes to drive turbines and generators. At the present time we have 13 hydro-electric power plants with an installed capacity of 711,000 kilowatts equal to 16% of our national total. There are about 110 potential dams ites in the country, which could yield about 2,300,000 kilowatts of hydro-electric power. There are about 54 sites suitable for pumped storage which could produce a further 38,600,000 kilowatts of power. All available if we carefully develop our water resources. To summarize, water resource development is essential to the regional development program and the welfare of our people, it must proceed hand-in-hand with other aspects of regional development such as land impovement, high way extension, development of our forests, erosion control, and develop ment of heavy and chemical industries. Through the successful implementation of such an integrated regional development program, we can look forward to a period of national strength, and due recognition of our country by the worlds societies.

  • PDF

Evaluation of the Irrigation Water Supply of Agricultural Reservoir Based on Measurement Information from Irrigation Canal (수로부 계측정보 기반 농업용 저수지의 관개용수 공급량 평가)

  • Lee, Jaenam;Noh, Jaekyoung;Kang, Munsung;Shin, Hyungjin
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.62 no.6
    • /
    • pp.63-72
    • /
    • 2020
  • With the implementation of integrated water management policies, the need for information sharing with respect to agricultural water use has increased, necessitating the quantification of irrigation water supply using monitoring data. This study aims to estimate the irrigation water supply amount based on the relationship between the water level and irrigation canal discharge, and evaluate the reliability of monitoring data for irrigation water supply in terms of hydrology. We conducted a flow survey in a canal and reviewed the applicability of the rating curve based on the exponential and parabolic curves. We evaluated the reliability of the monitoring data using a reservoir water balance analysis and compared the calculated results of the supply quantity in terms of the reservoir water reduction rate. We secured 26 readings of measurement data by varying the water levels within 80% of the canal height through water level control. The exponential rating curve in the irrigation canal was found to be more suitable than the parabolic curve. The irrigation water supplied was less than 9.3-28% of the net irrigation water from 2017 to 2019. Analysis of the reservoir water balance by applying the irrigation water monitoring data revealed that the estimation of the irrigation water supply was reliable. The results of this study are expected to be used in establishing an evaluation process for quantifying the irrigation water supply by using measurement information from irrigation canals in agricultural reservoirs.

Putting Climate Change into Water Resource Management: Adaptation Efforts in the U.S., U.K., Canada, Australia, and the Netherlands

  • Chang, Hee-Jun;Franczyk, Jon;Bae, Deg-Hyo
    • Journal of Environmental Policy
    • /
    • v.5 no.4
    • /
    • pp.19-49
    • /
    • 2006
  • As global climate change is expected to influence regional water resources, water resource managers need to establish adaptive management to cope with climate change. We examined adaptive management efforts in the US, UK, Canada, Australia, and the Netherlands. Each country is implementing different levels of adaptation efforts based on current water management practices, institutional arrangements, as well as the varying degree of water availability, current climate effects and expected climate change effects. Based on the comparison of these countries, we suggest policy implications for the sustainable water resource management of Korea under climate changes.

  • PDF

Application of Sewage Treatment Processes to a System Design for Water Resource Production 1. Analysis and Assessment of Sewage Treatment Process Efficiency (하수처리공정의 물 자원 생산 시스템 설계에 대한 적용 1. 하수처리공정의 처리효율 분석 및 평가)

  • Shin, Choon Hwan
    • Journal of Environmental Science International
    • /
    • v.25 no.8
    • /
    • pp.1155-1163
    • /
    • 2016
  • The treatment efficiencies of domestic sewage treatment processes were analysed and assessed to suggest and design a suitable technology for coal seam gas (CSG) water treatment. Two sewage treatment plants (S and G in Busan) were selected. The former operates with standard activated sludge and modified Ludzak Ettinger processes while the later uses the combination of $A_2/O$ and gravity fiber filtration. For both plants, the concentrations of BOD, $COD_{Mn}$, T-N and T-P were about 5.0, 19.0, 5.0, 11.0 and 1.0 ppm, respectively, which satisfy the discharge standards. Therefore, although sewage treatment processes seems to be applicable for CSG water treatment, additional processes to remove total dissolved solids and ionic compounds (i.e. bicarbonate) need to be introduced to produce fit-for-purpose water resources for beneficial use (in accordance with Water ACT 2013). This, for the CSG treatment process design, it is necessary to align the operating conditions with merging methods of combinable unit technology obtained from sewage treatment processes.

A Study on the Application of Micro Hydro Power Generator at the Water Treatment Plant (정수장 마이크로 소수력 발전기 적용에 대한 연구)

  • Kim, Jong-Gyeum;Park, Young-Jeen;Kim, Il-Jung
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.9
    • /
    • pp.67-72
    • /
    • 2014
  • Inflow or outflow from the water treatment plant and the sewage water has potential energy. If this potential energy can be converted into electrical energy by water turbine generator, it can help to save energy because of the high capacity utilization. So recently, micro hydro power plant is reviewed in the water treatment facility. If generation capacity is low, induction generator is primarily used. If output capacity is low, generated power is supplied to the inside load. Induction generator can cause voltage drop by the inrush current at a start-up and requires reactive power for magnetization. In this study, we analyzed the flow of power and voltage variation against inrush current that occurs when the induction generator starts under the terms that loads of linear and non-linear of the water purification plant are used. Analysis results are that the voltage drop is within an allowable range and the power factor is slightly reduced by the need of reactive power.

A Study on the Optimal Use of Silent Discharge Type Ozonizer in Purification Plant (정수장의 무성방전형 오존발생기 최적활용방안에 관한 연구)

  • Shin, Hong-Sub;Park, Hyun-Mi;Kwon, Young-Hak;Song, Hyun-Gig;Park, Won-Joo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.3
    • /
    • pp.54-60
    • /
    • 2015
  • There are 5 purification plants with the adopted advanced water purification treatment process in Korea. Annual operating costs were 8,990 million won including purchase cost of oxygen and power usage charges. We need research to optimize, in the future, when considering the direction of domestic water treatment continues to adopt advanced water treatment process. In this paper, calculate the optimal operating costs by injected the oxygen gas, used power cost. approximately 25% of the operating costs can be reduced when injected the ozone gas is 1.0ppm than 2.0ppm, the necessary amount of oxygen is increased then power is lower. so operating costs are decided according to oxygen costs. On the other hand, high ozone concentration 2.0ppm, the necessary power is increased then amount of oxygen is lower. Therefore, in the case of G purification plant, the controlling factor of the input ozone concentration 2ppm, PID control operation by setting the concentration of over 10Wt% is efficient. The installed capacity is the more little the more better when considering on Ozone injection rate in the process of water treatment.

Problems and their Counter-measures in Water Quality Preservation (수질보전상의 문제와 대책)

  • Ryu Jae Keun
    • Journal of environmental and Sanitary engineering
    • /
    • v.2 no.2 s.2
    • /
    • pp.69-78
    • /
    • 1987
  • Due to the increase of population and development of industry, the demand of available water resources increased . Many reservoirs have been constructed in large scales to meet this urgent need , resulting in the increased amount of water resources. After the constructions, however, serious pollution-especially eutrophication-in some reservoirs become a socialaffair. Therefore, water quality control in these resources should be considered more intensively than any other environmental preservation policies. It also seems to be imminent to prepare the precautionary steps. Most water pollution in Korea-73 percent - can be traced to domestic sewage. It may rome as a surprise to Some, Industry is responsible for just 27 percent of ]Korea's water pollution. What he calls 'non-point' Sources, which may include agricultural Chemicals, Create only negligible amount of water pollution. Up to $15\%$ of domestic sewage is treated in Korea, which is quite low when compared with the waste processing in developed countries. So it is the most urgent matter to control the pollution sources. One of the precautionary plans, more urban domestic sewage treatment plants must be installed and operated efficiently. It is known that nutrients such as nitrogen and phosphorous are the major factors the process of eutrophication, which can be removed majorly by the tertiary or advanced treatment process.

  • PDF

Estimation of Pollutant Load Using Genetic-algorithm and Regression Model (유전자 알고리즘과 회귀식을 이용한 오염부하량의 예측)

  • Park, Youn Shik
    • Korean Journal of Environmental Agriculture
    • /
    • v.33 no.1
    • /
    • pp.37-43
    • /
    • 2014
  • BACKGROUND: Water quality data are collected less frequently than flow data because of the cost to collect and analyze, while water quality data corresponding to flow data are required to compute pollutant loads or to calibrate other hydrology models. Regression models are applicable to interpolate water quality data corresponding to flow data. METHODS AND RESULTS: A regression model was suggested which is capable to consider flow and time variance, and the regression model coefficients were calibrated using various measured water quality data with genetic-algorithm. Both LOADEST and the regression using genetic-algorithm were evaluated by 19 water quality data sets through calibration and validation. The regression model using genetic-algorithm displayed the similar model behaviors to LOADEST. The load estimates by both LOADEST and the regression model using genetic-algorithm indicated that use of a large proportion of water quality data does not necessarily lead to the load estimates with smaller error to measured load. CONCLUSION: Regression models need to be calibrated and validated before they are used to interpolate pollutant loads, as separating water quality data into two data sets for calibration and validation.

Ingestion Exposure to Nitrosamines in Chlorinated Drinking Water

  • Kim, He-Kap;Han, Ki-Chan
    • Environmental Analysis Health and Toxicology
    • /
    • v.26
    • /
    • pp.2.1-2.7
    • /
    • 2011
  • Objectives: N-Nitrosodimethylamine (NDMA) is classified as a probable human carcinogen by the United States Environmental Protection Agency (US EPA) and is formed during the chlorination of municipal drinking water. In this study, selected nitrosamines were measured in chlorinated drinking water collected from Chuncheon, Kangwon-do, Republic of Korea, and a risk assessment for NDMA was conducted. Methods: Twelve water samples were collected from 2 treatment plants and 10 household taps. Samples were analyzed for 6 nitrosamines via solid-phase extraction cleanup followed by conversion to dansyl derivatives and high-performance liquid chromatography-fluorescence detection (HPLC-FLD). Considering the dietary patterns of Korean people and the concentration change of NDMA by boiling, a carcinogenic risk assessment from ingestion exposure was conducted following the US EPA guidelines. Results: NDMA concentrations ranged between 26.1 and 112.0 ng/L. NDMA in water was found to be thermally stable, and thus its concentration at the end of boiling was greater than before thermal treatment owing to the decrease in water volume. The estimated excess lifetime carcinogenic risk exceeded the regulatory baseline risk of $10^{-5}$. Conclusions: This result suggests that more extensive studies need to be conducted on nitrosamine concentration distributions over the country and the source of relatively high nitrosamine concentrations.