• Title/Summary/Keyword: water environmental management

Search Result 2,961, Processing Time 0.03 seconds

Water Quality Analysis in Nakdong River Tributaries Using 2012-2016 Monitoring Data (2012-2016년 모니터링 자료를 이용한 낙동강 지류·지천 수질 특성 분석)

  • Son, Younggyu;Na, Seungmin;Im, Tae Hyo;Kim, Sang-hun
    • Journal of Korean Society on Water Environment
    • /
    • v.33 no.6
    • /
    • pp.680-688
    • /
    • 2017
  • Water quality monitoring for flow rates and BOD/COD/T-N/T-P/SS/TOC concentrations has been conducted in Nakdong river tributaries since 2011. In this study concentrations and loading rates of BOD, T-P, and TOC were analyzed to evaluate water quality monitoring stations using accumulated data at 206 tributary monitoring stations in Nakdong river 2012 ~ 2016. Average concentration ranges for 206 monitoring stations were 0.3 ~ 6.4 mg/L, 0.025 ~ 1.562 mg/L, and 0.6 ~ 10.7 mg/L for BOD, T-P, and TOC, respectively. Additionally, average loading rate ranges were 0.96 ~ 46,040 kg/d, 0.087 ~ 1,834 kg/d, and 1.51 ~ 80,425 kg/d for BOD, T-P, and TOC, respectively. Average concentration for BOD, T-P, and TOC at each monitoring station was evaluated using ambient water quality standards of rivers and water quality regulation level for medium-sized management areas. Average loading rate and specific loading rate (loading rate/drainage basin area) for BOD, T-P, and TOC at each monitoring station was considered to evaluate monitoring stations using suggested classification (BOD, TOC: -1, 1 ~ 10, 10 ~ 100, 100 ~ 1,000, and 1,000 ~ kg/d; T-P: -0.1. 0.1 ~ 1, 1 ~ 10, 10 ~ 100, and 100 ~ kg/d) Using results of this study, various water quality status maps were provided, and three evaluation methods were suggested to determine priority monitoring stations in Nakdong river for rational water quality control and tributaries basin management.

Hydrological Variability of Lake Chad using Satellite Gravimetry, Altimetry and Global Hydrological Models

  • Buma, Willibroad Gabila;Seo, Jae Young;Lee, Sang-IL
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.467-467
    • /
    • 2015
  • Sustainable water resource management requires the assessment of hydrological variability in response to climate fluctuations and anthropogenic activities. Determining quantitative estimates of water balance and total basin discharge are of utmost importance to understand the variations within a basin. Hard-to-reach areas with few infrastructures, coupled with lengthy administrative procedures makes in-situ data collection and water management processes very difficult and unreliable. In this study, the hydrological behavior of Lake Chad whose extent, extreme climatic and environmental conditions make it difficult to collect field observations was examined. During a 10 year period [January 2003 to December 2013], dataset from space-borne and global hydrological models observations were analyzed. Terrestial water storage (TWS) data retrieved from Gravity Recovery and Climate Experiment (GRACE), lake level variations from Satellite altimetry, water fluxes and soil moisture from Global Land Data Assimilation System (GLDAS) were used for this study. Furthermore, we combined altimetry lake volume with TWS over the lake drainage basin to estimate groundwater and soil moisture variations. This will be validated with groundwater estimates from WaterGAP Global Hydrology Model (WGHM) outputs. TWS showed similar variation patterns Lake water level as expected. The TWS in the basin area is governed by the lake's surface water. As expected, rainfall from GLDAS precedes GRACE TWS with a phase lag of about 1 month. Estimates of groundwater and soil moisture content volume changes derived by combining altimetric Lake Volume with TWS over the drainage basin are ongoing. Results obtained shall be compared with WaterGap Hydrology Model (WGHM) groundwater estimate outputs.

  • PDF

RAINFALL AND RUNOFF VARIATION ANALYSIS FOR WATER RESOURCES MANAGEMENT STRATEGIES

  • Sang-man;Heon, Joo-;Jong-ho;Kum-young
    • Water Engineering Research
    • /
    • v.5 no.3
    • /
    • pp.111-121
    • /
    • 2004
  • For the long-term strategic water resources planning, forecasting the future streamflow change is important to meet the demand of a growing society. The streamflow variation to the decade-long precipitation was investigated for the two major stage gauging stations in Korea. Precipitation and runoff characteristics have been analyzed at Yongwol stream stage in the Han River as well as Sutong stream stage in the Kum River for the future water resources management strategies. Monte Carlo method has been applied to estimate the future precipitation and runoff. Based on the trend line of 10-year moving average of runoff depth for the historical runoff records, the relation between runoff and the time variation was examined in more detail using regression analysis. This study showed that the surface flows have been significantly decreased while precipitation has been stable in these basins. Decreasing in runoff reflects the regional watershed characteristics such as forest cover changes. The findings of this study could contribute to the planning and development for the efficient water resources utilization.

  • PDF

Plausible grid size for a real time decision making system based 3D water quality model (실시간 수질관리도구로서의 3차원 수질모형의 최적 격자크기 산정)

  • Ahn, Ki-Hong
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.4
    • /
    • pp.575-583
    • /
    • 2011
  • In this study, the plausible grid size was estimated to increase for efficiency of reservoir management using 3 dimensional water quality model. To validate utilization of a real time water quality management tool, ELCOM-CAEDYM model was applied to Soyang reservoir in korea. 100m grid size can represent the real topography and take out exact analysis results. $400{\times}400m$ grid can be easily used to analysis because of data capacity. Consequently, the grid size of 200m or 300m was recommended to establish 3D model considering the required simulation time and the irrelevance between horizontal grid size and vertical distribution for temperature and turbidity analysis.

Zooplankton Removal in Seawater using UV, Electrolysis and UV+electrolysis Process (UV, 전기분해 및 UV+전기분해 공정을 이용한 해수 중의 동물성 플랑크톤 제거)

  • Kim, Dong-Seog;Park, Young-Seek
    • Journal of Environmental Science International
    • /
    • v.30 no.7
    • /
    • pp.597-604
    • /
    • 2021
  • The International Maritime Organization (IMO) ballast water management agreement (International Convention for the Control and Management of Ship's Ballast Water and Sediments) came into force on September 8, 2017. This study evaluated the disinfection performance of electrolysis, UV treatment, and electrolysis + UV combined, to improve the treatment of zooplankton (size ≥ 50 ㎛), which is expected to strengthen the standards for biodegradation efficiency. Among the methods used, the disinfection time leading to 100% death was in the order: electrolysis > electrolysis + UV > UV process. For the same level of disinfection performance, the amount of electricity required for the electrolysis, UV, and electrolysis + UV processes were 1,300 W.s, 8,400 W.S, and 4,500 W.s, respectively. The combination of electrolysis + UV process for inactivation of zooplankton in ballast water did not show a synergic effect owing to the slow disinfection time and high power consumption.

A Study of Changes in the Water Quality of Agricultural Reservoirs due to Drought (가뭄으로 인한 농업용 저수지의 수질 변화 연구)

  • Cho, SungHyen;Hwang, Soonho;Lee, Dongguen;Lee, Guntaek;Choi, Jung-Hoon
    • Journal of the Korean earth science society
    • /
    • v.43 no.1
    • /
    • pp.110-118
    • /
    • 2022
  • Frequent drought damage has resulted in the polarization of water resources. In Korea, local periodic abnormal droughts continued to occur between 2011 and 2017, resulting in decreased water storage rates of small-scale reservoirs designed with a frequency of 10-year droughts. This decrease can degrade water quality and limit the use of already secured quantities. Therefore, to prepare for and overcome drought, quality management and recalculation of drought frequency are required. This study estimates the potential pollutants causing quality changes in the reservoir. In addition, it reviews the decrease in storage and consequent changes in the quality of a reservoir during drought.

Enhancement of Estimation Method on the Land T-P Pollutant Load in TMDLs Using L-THIA (L-THIA모형을 이용한 수질오염총량관리제 토지계 T-P 발생부하량 산정방식의 개선)

  • Ryu, Jichul;Kim, Eunjung;Han, Mideok;Kim, Young Seok;Kum, Donghyuk;Lim, Kyoung Jae;Park, Bae Kyung
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.36 no.3
    • /
    • pp.162-171
    • /
    • 2014
  • In this study, the uncertainty analysis of present land pollutant load estimation with simplified land category in TMDLs was performed and the enhanced method for land pollutant load estimation with level II land cover consisting of 23 categories was suggested, which was verified by L-THIA model. For land TP load estimation in Jinwi stream basin, the result of comparison between existing method with simplified land category (Scenario 1) and enhanced method with level II land cover (Scenario 2) showed high uncertainty in existing method. TP loads estimated by Scenario 2 for land covers included in the site land category were in the range of 3.45 to 56.69 kg/day, in which TP loads differed by sixteen times as much among them. For application of scenario 2 to TMDLs, Land TP loads were estimated by matching level II land cover to 28 land categories in serial cadastral map (Scenario 3). In order to verify accuracy of TP load estimation by scenario 3, the simulation result of L-THIA was compared with that and the difference between the two was as little as 10%. The result of this study is expected to be used as primary data for accurate estimation of land pollutant load in TMDLs.

A Study on the Selection of Non-point Pollution Management Regions with High Priority Order in the Yeongsan River Basin (영산강수계 비점오염원 중점관리지역 선정에 관한 연구)

  • Lee, JaeChoon;Park, HyeLin;Lim, ByungJin;Lee, ChangHee;Lee, SuWoong;Lee, YongWoon
    • Korean Journal of Ecology and Environment
    • /
    • v.45 no.4
    • /
    • pp.347-355
    • /
    • 2012
  • In this study, non-point pollution sources in the Yeongsan river basin are analyzed; then, the priority regions (areas divided on a small scale) of management are selected for efficient water management of the Seungcheon and Jooksan reservoirs, which were constructed as one of the 4 major rivers restoration projects. The priority regions are decided by using the criteria of the excessive rate of target water quality, non-point pollution load per unit area, total TP load and down flow distance. The results of this study are as follows. The upper 10% of the priority regions for non-point pollution management includes YB15, YB05, YB10, YB24, YB14 and YB11 for the Seungcheon reservoir watershed, and YC24, YC25, YC30, YC34, YC22 and YC17 for the Jooksan reservoir watershed. However, a few regions in each of the Seungcheon and Jooksan reservoirs need to be selected in higher order, and the non-point pollution removal facilities in the regions need to be installed with respect to budget, urgent matter, and so on.

Current status of Jeju special self-governing province's water infrastructure and direction for improvement (제주특별자치도 물인프라 현황 및 개선방향)

  • Kim, Jinkeun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.35 no.6
    • /
    • pp.497-505
    • /
    • 2021
  • This paper investigates the current status of Jeju special self-governing province (JSSGP)'s water infrastructure and recommends directions for improvement. JSSGP relies on groundwater for most of its water resources. Recently, water usage has been steadily increasing due to the increase of residents and tourists while the quality of groundwater has been steadily worsening. Deterioration in water quality of groundwater can be seen through the increase in concentration of nitrate nitrogen and microorganisms. To overcome such problems, water consumption must be reduced by water demand management in all fields including residential and agricultural water use. The quality of water resources should be preserved through the management of pollutants. For efficient management of water resources, great efforts should be made to reduce the leakage rates in household and agricultural water, which is currently at the highest level in the country. Furthermore, diversification of water intake sources other than groundwater is needed, especially for agricultural water supply. For water and sewerage facilities, compliance with drinking water quality standards and discharge water quality standards must be achieved through the optimization of operation management. This process requires recruiting professionals, improving existing workers' expertise, and improving facilities.

Significance and Development of the Integrated Environment Management System Implementation (통합환경관리제도 시행의 의의와 발전방향)

  • Park, Jae Hong;Kim, Yong Seok;Lee, Won Seok
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.3
    • /
    • pp.318-324
    • /
    • 2016
  • The significance of an integrated environmental management system implementation can be summarized into three sections. The first is that the paradigm of a permit system will be changed from the existing media-specific permits to cross-media permits. In the near future, the cross-media license will be granted based on the diagnostic results of the plant. The second is that it will be established through a social concensus, i.e., consultations with stakeholders and direct participation in the system design process of stakeholders. The third is that it will have flexibility in its operating system. In the near future, it will be possible to management an environment through its industrial workplace itself and determine if emission standards are being complied with or not through statistical methods. In addition there is also an urgent need for complementary parts in order to enhance the driving force of the integrated environmental management system which is based on transparency, reliability and flexibility. In other words, it is necessary to continuously promote in order to diffuse consensus and increase an understanding of implementation through an integrated environmental management system. It is also necessary to establish a new organization and educate authorized representatives so that they have the tools to smoothly perform the system.