• Title/Summary/Keyword: water environmental management

Search Result 2,961, Processing Time 0.03 seconds

Classification of Water Facility Inventories for the Construction of Water Supply Asset Management System (상수도 자산관리 시스템 구축을 위한 정수시설 인벤토리 분류)

  • Kim, Jinkeun;Lee, Junghoon
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.6
    • /
    • pp.651-657
    • /
    • 2015
  • Recently, the need for asset management(AM) plan introduction to reduce increasing O&M cost with aging water facilities is on the rise. Therefore, asset inventory classification is necessary as the first step for AM plan construction. In this study, all assets of YW water treatment plant(WTP) were classified as 5 steps. In addition, specific code name was given to each asset which can increase compatibility in constructing the AM programs among WTPs. In the future, codes for attribute and status of asset will be allocated, which can facilitate proper AM operation.

Application of PCSWMM for the Analysis of Water Quantity and Quality Considering CSOs (CSOs를 고려한 도시유역의 수량 및 수질 분석을 위한 PCSWMM 모형의 적용)

  • Hong, Won-Pyo;Chung, Eun-Sung;Lee, Joon-Seok;Kim, Kyung-Tae;Lee, Kil Seong
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.1
    • /
    • pp.26-36
    • /
    • 2009
  • Combined sewer system (CSS) has been built in the most urban areas across the nation. During dry weather conditions, CSS works fine. But during heavy rain storms, combined sewage frequently overflows into the stream. This study simulated the hydrologic cycle and pollutant loads (BOD, SS, TN and TP) in the Mokgamcheon watershed considering combined sewer overflows (CSOs). PC storm water management model (PCSWMM) was used for continuous simulation and CSOs are considered using the flow divider. Sensitivity analysis, calibration and verification for water quantity and quality are carried out. To verify CSOs, field measurements of CSOs are compared with simulated results. As a result, 41.3% of precipitation flows into the stream directly and 1.1% of water supply flows into stream as CSOs. 6.5% of BOD total loads, 12.0% of SS, 13.6% of TP, and 29.2% of TN are from CSOs. This result will be effective to the integrated watershed management for sustainability.

Application of the Load Duration Curve (LDC) to Evaluate the Rate of Achievement of Target Water Quality in the Youngsan · Tamjin River Watersheds (부하지속곡선(LDC)을 이용한 영산강 · 탐진강수계 오염총량관리 목표수질 평가방법 적용 방안)

  • Cheong, Eunjeong;Kim, Hongtae;Kim, Yongseok;Shin, Dongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.4
    • /
    • pp.349-356
    • /
    • 2016
  • Total Maximum Daily Loads (TMDLs) System has been used to improve water quality in the Youngsan·Tamjin river basin since 2004. The Basic Policy of TMDLs sets up the standard flow based on the average dry condition or mid-range flow during the last 10 years. However, Target Water Quality (TWQ) assessment on TMDLs has been used to evaluate water quality through eight-day intervals over 36 times a year. The results for allocation evaluation and target water quality evaluation were different from each other in the same unit watershed during the first period. In order to improve the evaluation method, researchers applied Load Duration Curve (LDC) to evaluate water quality in nine unit watersheds of the Youngsan·Tamjin river basin. The results showed that achievement rates of TWQ assessment with the current method and LDC were 67~100% and 78~100%, respectively. Approximately 11% of the achievement rates with use of LDC were higher than those with use of the current method. In conclusion, it is necessary to review the application of the LDC method in all Four Major River Watersheds.

Selection of Priority Management Target Tributary for Effective Watershed Management in Nam-River Mid-watershed (남강 중권역의 효율적인 유역관리를 위한 중점관리 대상지류 선정)

  • Jung, Kang-Young;Kim, Gyeong-Hoon;Lee, Jae-Woon;Lee, In Jung;Yoon, Jong-Su;Lee, Kyung-Lak;Im, Tae-Hyo
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.4
    • /
    • pp.514-522
    • /
    • 2013
  • The major 24 tributaries in Nam-River mid-watershed were monitored for discharge and water quality in order to understand the characteristics of the watershed and to select the tributary catchment for improving water quality. According to the analytical results of discharge and water quality monitoring data of 24 tributaries, the mean value of discharge below $0.1m^3/s$ was 62.5% among the monitored tributaries and it mostly exceeded the water quality standards of Nam-river mid-watershed ($BOD_5$ = 3 mg/L, T-P = 0.1 mg/L over). According to the stream grouping method and the water quality delivery load density ($kg/day/km^2$) based on the results of tributary discharge and water quality monitoring, the tributary watersheds for improving the water quality were selected. In the Nam-River mid-watershed, tributaries in the GaJwaCheon, HaChonCheon catchment (Group D, $BOD_5$ = 3 mg/L over) and in the UirYeongCheon, SeokGyoCheon catchment (Group A, T-P = 0.1 mg/L over), which have a small flow (and/or large flow) and a high concentrations of water pollutants. The various water quality improving scheme for tributaries, in accordance with the reduction of potential point source pollution by living sewage and livestock wastewater, should be established and implemented.

A Study on the Method of Implementation Assessment for Total Maximum Daily Load Management (수질오염총량관리를 위한 효율적 이행평가방안 연구)

  • Park, Jun-Dae;Park, Ju-Hyun;Rhew, Doug-Hee;Jeong, Dong-Hwan
    • Journal of Environmental Impact Assessment
    • /
    • v.17 no.2
    • /
    • pp.125-132
    • /
    • 2008
  • It is desirable that implementation assessment (IA) should be carried out efficiently in order to make successful progress of Total Maximum Daily Load (TMDL) in watershed management. There are many difficulties in the process of the implementation assessment because of the early stage in the application of TMDL in Korea. This study reviewed the present status of IA and proposed the methodology of its improvement such as flexible application of TMDL ledger, and standardization of assessment index and criteria. The deficient time for assessment period could be corrected by the consideration of the post-procedure after the submission of IA report.

Assessment and Analysis of Coal Seam Gas Water Management Study for Water Resource Production 2. Prediction of Treatment Technology and Design of Co-treatment System (물 자원 생산을 위한 Coal Seam Gas Water Management Study의 평가 및 분석 2. 처리기술 예측 및 병합 시스템 설계)

  • Shin, Choon-Hwan
    • Journal of Environmental Science International
    • /
    • v.24 no.12
    • /
    • pp.1629-1637
    • /
    • 2015
  • To develop various usable water from coal seam gas (CSG) water that needs to be pumped out from coal seams for methane gas production, a feasibility study was carried out, evaluating and analysing a recent report (Coal Seam Gas Water Management Policy 2012) from Queensland State Government in Australia to suggest potential CSG water treatment options for fit-for-purpose usable water production. As CSG water contains intrinsically high salinity-driven total dissolved solid (TDS), bicarbonate, aliphatic carbon, $Ca^{+2}$, $Mg^{+2}$ and so on, it was found that appropriate treatment technologies are required to reduce the hardness below 60 mg/L as $CaCO_3$ by setting the reduction rates of $Ca^{+2}$, $Mg^{+2}$ and Na+ concentrations, as well as TDS reduction. Also, Along with fiber filtration and membrane separation, an oxidation degradation process was found to be required. Along with salinity reduction, as CSG water contains organic compounds (TOC: 248 mg/L, $C_6-C_9$: <20 mg/L and $C_{10}-C_{36}$: <60 mg/L), compounds with relatively high molecular weights ($C_{10}-C_{36}$) need to be treated first. Therefore, this study suggests a combined system design with filtration (Reverse osmosis) and oxidation reduction (electrolysis) technologies, offering proper operating conditions to produce fit-for-purpose usable water from CSG water.

Investigation and Analysis of Water Quality Environmental for Preparing a Natural Learning and Experimental Area in Bukchun and Boundary (북천지역 자연학습 체험단지 조성을 위한 수질 환경성 조사 및 분석)

  • 정종현;최석규;이종현;정덕영;이강우
    • Journal of Environmental Health Sciences
    • /
    • v.28 no.2
    • /
    • pp.11-22
    • /
    • 2002
  • This study analyzes the river system and water quality conditions of Bukchun in order to establish a basic plan for Preparing a natural learning and experimental area of environmental ecosystem in Bukchun, Gyeongju. It also tries to establish an integrated plan for water management of Bukchun stream based on water contaminants. In addition, after analysing the water quality at 13 points during the non-rainy season, the effluent of municipal wastewater was of relatively better quality with I ~ II grade, below the water quality standard of the river, except in points near Samsung apartments. However, analysing the Hyeongsangang and the effluent of Bomunho and Duckdongdam in rainy season, the water quality was II ~ III grade according to environmental standard. The water Quality of those samples was strongly dependent of non-point source.

The NPS Analysis and CSO Management Based on SWMM for Oncheon Basin (SWMM 모형을 이용한 비점오염 분석 및 CSO 관리방안 연구 - 부산시 온천천 유역 대상 -)

  • Shin, Hyun Suk;Son, Jeong Hwa;Jang, Jong Kyung;Shon, Tae Seok;Kang, Dookee;Cho, Dukjoon
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.2
    • /
    • pp.268-280
    • /
    • 2009
  • Oncheon basin which are located in Busan is divided into 43 basin on the basis of main pipe, constructed with Storm Water Management Model (SWMM). Occurrence situation for Outflow and pollutant loads by long-term continuous rainfall is examined for treatment district and river analysis point of Oncheon basin and a reduction vs effectiveness table for effective CSOs managements is made for each of treatment districts according to each of managements. In case that treatment equipment is located at the discharge point of CSO, treatment efficiency is analysed. It is supposed that treatment equipment have an efficiency on the basis of a concentration and runoff discharge over a critical flow is discharged with it untreated and treating runoff discharge with treatment equipment at each of runoff discharge points and treating it gathered at sewage treatment plant (STP) through trunk sewer is compared for a relative treatment efficiency.

Optimal Location of Best Management Practices for Storm Water Runoff Reduction (우수유출저감 시설의 최적위치 결정)

  • Jang, Su Hyung;Lee, Jiho;Yoo, Chulsang;Han, Suhee;Kim, Sangdan
    • Journal of Korean Society on Water Environment
    • /
    • v.24 no.2
    • /
    • pp.180-184
    • /
    • 2008
  • A distributed hydrologic model of an urban drainage area on Bugok drainage area in Oncheon stream was developed and combined with a optimization method to determine the optimal location and number of best management practices (BMPs) for storm water runoff reduction. This model is based on the SCS-CN method and integrated with a distributed hydrologic network model of the drainage area using system of 4,211 hydrologic response units (HRUs). Optimal location is found by locating HRU combination that leads to a maximum reduction in peak flow at the drainage outlet in this model. The results of this study indicate the optimal locations and numbers of BMPs, however, for more exact application of this model, project cost and SCS-CN reduction rate of structural facilities such infiltration trench and pervious pavement will have to be considered.

The Regulations and Guidelines for Management of Corrosive Water and Pipe Corrosion in Drinking Water Distribution System in North America (상수원 관망 부식 제어를 위한 부식성 수질 관리: 북미지역 관리 사례 및 국외 현황)

  • Kim, Minhee;Hyun, Seunghun;Lee, Won-Seok;Loretta, Y. Li
    • Journal of Korean Society on Water Environment
    • /
    • v.33 no.3
    • /
    • pp.359-369
    • /
    • 2017
  • Water distribution systems supply drinking water to consumers' taps. Internal corrosion of metallic pipe used in drinking water distribution systems has reduced water quality and led to increased levels of toxic heavy metals such as lead, copper and nickel. These problems have been experienced to varying degrees by water utilities in many countries. North America has successfully managed and controlled pipe corrosion and corrosive water in water distribution system based on various policies, regulations and rules. Practical and engineering guidelines for evaluation of pipe corrosion and determination of treatment options are also provided to assist drinking water supplies. In addition, the corrosion mechanism in water distribution systems, such as the complex effects of physical and chemical parameters on the corrosion pipes has been improved to accurately predict corrosion rates of metallic pipes in actual water distribution systems. This paper reviews various regulations, policy statement, and treatment produces on controlling corrosion in drinking water distribution systems in US and Canada and then offers suggestion for management of corrosive water and pipe corrosion in drinking water distribution system in Korea.