• Title/Summary/Keyword: warranty

Search Result 323, Processing Time 0.034 seconds

A Study on the Accelerated Life Test of BLDC Motor in Ceiling Mounted Digital Signage Rotating System (천정 거치형 디지털 사이니지 회전 시스템의 BLDC모터 가속수명시험에 관한 연구)

  • Kim, Ki-Hong;Kwon, Soon-Hong;Kwon, Soon-Gu;Park, Jong-Min;Kim, Jong-Soon;Jung, Sung-Won;Choi, Won-Sik
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.21 no.3
    • /
    • pp.141-147
    • /
    • 2018
  • In a time when product development cycles are getting shorter and shorter, many companies are making efforts to develop products with high reliability in a short period of time, accelerated life test is widely used as a method to quickly evaluate reliability. Accelerated life test reduces the test life or the life of the product from the observed data by shortening the lifetime of the product or abruptly lowering the performance under the worse condition than the actual condition in order to shorten the test cost or the test time. In this paper, BL3640A-06P+RB35, DC12V model, which is used in the support device of an automatic rotation type digital signage, which display various information such as textures and images on a display screen in a public place or a commercial space, BLDC motors were subjected to a constant stress test and at the rotational speed of 1rpm, $180^{\circ}$ rotation and reverse rotation under actual use conditions, the stress was imposed on the rotating speed of 2rpm and the weight of the actual installed product from 22.2kgf to 10kgf were installed. The lifetime of the actual use environment condition is 23,545 hours and the rotation speed is accelerated. The life time of the acceleration condition with the additional weight is 1,380 hours. The acceleration factor is calculated as 17.06, the one year guarantee test day is 235 days to 14 days, of the period from 470 days to 28 days, and the third year from 704 days to 42 days. The test date of the BLDC motor was tested on the shortened test date, and the rotational speed and the current value were measured. It is found that there is no defect even if it operates as the test date corresponding to the specified one year warranty period and the 3 year accelerated life test which is experimented. Using the statistical technique of the regression analysis the expected time for the motor to defect to #4 samples was 20 years.

An Empirical Research how ISO application and Partnership process affect on Business Performance of Import and Export Manufacturing Firms in Korea (한국 수출입 제조 기업의 국제표준인증 활용과 파트너십 프로세스에 대한 연구)

  • Kim, Chang Bong;Koo, Yun Cheol
    • International Commerce and Information Review
    • /
    • v.18 no.2
    • /
    • pp.131-150
    • /
    • 2016
  • As global partnership is recently getting important in order to establish supply chain network in global managing environment, companies tend to improve quality and warranty in SCM(Supply Chain Management) by certifying ISO(International Organization for Standardization). This research investigated structural relationship how strategic and operational ISO application level and trust, immersion, collaborative factors in partnership process affect to companies business performance. This research was surveyed with 147 manufacturing companies in South Korea and conducted empirical analysis using Structural equation model. The research hypothesis and model was derived from the basis of existing theory and empirical research, and obtained the following results. Firstly, the strategic ISO level showed positive(+) effect on trust and immersion factor. Second, the operational ISO level showed positive(+) effect on trust and collaborative factor. Third, trust factor in the partnership process showed positive(+) effect on immersion factor. Lastly, collaborative factor in partnership process showed positive(+) effect on companies business performance. Implication for this research is that companies must consider ISO application in establishing partnership and companies require prolonged effort using trust, immersing, collaborative factors into partnership process to improve business performance.

  • PDF

A Study on the Implied Terms of Safe Berth under Voyage Charterparty (항해용선계약상 안전선석의 묵시조건에 관한 연구)

  • Han, Nak-Hyun;Kim, Eun-Joo
    • Journal of Korea Port Economic Association
    • /
    • v.26 no.3
    • /
    • pp.92-113
    • /
    • 2010
  • The purpose of this study aims to analyse the implied terms of safe berth under Voyage charterparty with the Rebon case. Where the safety of the berth is warranted, but not the safety of the port, then the charterer's obligation is to nominate a berth which can be approached safely from within the port and which was itself, save insofar as affected by hazards or risks which affect the port as a whole or all of the berths within it. This case is an appeal from an order made by the judge dismissing an appeal from a final declaratory award on preliminary issues made by arbitrators. The judge expressed the question for decision somewhat differently as follows: if a specific load port is named in a voyage charterparty and there are several possible berths within that port to which a vessel could be directed to load by the charterers and there is no express warranty in the charterparty of the safety of either the port or the berth to which the vessel is to be directed by the charterers, is the charterparty subject to an implied term that the charterers must nominate a safe berth at that load port?

Case Study for Information Quality Maturity Model (정보 품질 성숙도 모델에 관한 연구)

  • Kim Chang-Jae;Choi Yong-Rak;Rhew Sung-Yul
    • The KIPS Transactions:PartD
    • /
    • v.13D no.4 s.107
    • /
    • pp.557-564
    • /
    • 2006
  • Information is used effectively and contributes in profit creation and not only support management judgment quick but important resource to be possible recycled. The recent information systems improve enterprise's competitive power by reflection of user's various requirements and becoming big and complex for adaptation of rapidly circumstance change. Also it is trend that importance of information quality is emphasized gradually. The biggest problem in user requirement that is based on low quality data support. In case of business management is achieved by low quality information, company can not help dropping their competitive power such as company's strategy establishment, strategy achievement and management concentration breakup against competitor. Information of low quality increase time and expense to improve inaccurate data or revise and it is hard to accept correct information from specific situation. To solve these problems, we have to gain high quality data through definite comprehension, data management system establishment, and systematic data management achievement etc. Up to now, information quality and connected study were developed partially, but systematic methodology of information quality management's whole condition was not existed. Therefore, in this paper can show you how to extract process for information quality management & related evaluate factor with CMM (Capacity Maturity Mode]) 5 steps that is information warranty of quality process step. This paper whishes to contributes in competitive company or organization activity through information quality improvement management process.

An Experimental Study on the Estimation of Chloride Diffusion Coefficient of LNG Storage Tanks (LNG 저장탱크 염해 확산 계수 산출을 위한 실험적 고찰)

  • Lee, Seung-Rim;Hwang, Seung-Hyun
    • Journal of Energy Engineering
    • /
    • v.21 no.2
    • /
    • pp.119-123
    • /
    • 2012
  • Although LNG storage tanks are very delicate with chloride attack owing to its operating inshore location, specific integrity management system for chloride attack has not been studied so far. As the design warranty life time, about 25 years, has come, to prevent paying huge amount of construction cost and required resources for new alternative storage tanks and manage the life time of operating storage tanks, the basic data of chloride attack is necessary. This study intended to build up basic data for following detailed study to develop technologies for life time management of LNG storage tanks, NT Build 492 method in North Europe was used to test chloride diffusion coefficient for the newly-constructing concrete outer tank. Results of these tests lead us to the conclusion that 90 days diffusion coefficients show 46% of 28 days' due to a large quantity of fly ash mixing and much similar to estimation from concrete process table. It seems resonable to conclude that 90 days specimens are recommended estimating the chloride diffusion coefficient for LNG storage tanks to enhance the reliabilities.

A Proposal of Repair Cost Estimating Criteria for Persistent Defects in Apartment Houses

  • Lee, Hae-Jin;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.597-608
    • /
    • 2011
  • It has been often noted as a problem that as there are no objective and clear criteria for the repair cost estimate of persistent defects, when a claim arises in relation to an apartment construction, significantly different amounts of compensation may be given for similar defects based on the experience and tendencies of the construction experts asked to make a judgment. For this reason, this research aims to present defect managers with a more reasonable and objective estimation criteria and a system to determine the repair cost of defects based on an analysis of relevant factors. The research findings show that the historical cost system is applied first, and then a standard of estimation is used to estimate the cost for the items that are not included in the historical cost system. The criteria for the repair cost for each defect is as follows: the repair cost for defects arising from a regulation violation is determined by calculating the reconstruction cost of the parts in question after demolishing them; the repair cost for progressive defects is determined based on a contribution ratio proportional to the age of the building; the repair cost for repetitive defects is calculated by considering an alternative to maximize the intended function of the defective parts; and the repair cost for value depreciation defects is determined based on the ratio of the warranty period to the lapsed years. However, repair cost estimation for dual value depreciation defects should be studied in future research.

Study on The Warranty of Opposing Through Flow Gap Acceptance Time for more Efficient Management of Permissive Left-Turn (비보호 좌회전 효율성 제고를 위한 대향 직진 교통류의 Gap-Time기준 연구)

  • Baik, Seung-Yup;Park, Ki-Soo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.10 no.4
    • /
    • pp.107-115
    • /
    • 2011
  • Since 2009 The Korean National Police Agency has been pushed "permissive left-turn" forward in order to making progress in Korean traffic operations system. Preceding researches manuals and guidelines present 6 standards(# of accidents # of lanes, pedestrian volume sight # of permissive left-turn lanes vehicle volume) as installation permissive left-turn. But in practical affairs it is most important that secure enough Gap-time between permissive left-turn vehicle and opposite through lane vehicle to make permissive left-turn vehicle move safer and more efficiently. This study suggests applying gap acceptance theory in microscopic model to permissive left-turn installation standards. Analysis methods of this study are field data survey statistical analysis and microscopic simulation analysis. This study collected field data by using AVI recording and measured permissive left-turn vehicle intersection passing time(T1) and against the opposite through lane vehicle Gap-time(T2). And statistical analysis performed about two values that measured before to predict the functionality between T1 and T2. These studies to overcome the limit of sample size carried out a microscopic simulation(VISSIM) plan and collect more samples to input statistical analysis.

A study on vulnerability analysis and incident response methodology based on the penetration test of the power plant's main control systems (발전소 주제어시스템 모의해킹을 통한 취약점 분석 및 침해사고 대응기법 연구)

  • Ko, Ho-Jun;Kim, Huy-Kang
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.24 no.2
    • /
    • pp.295-310
    • /
    • 2014
  • DCS (Distributed Control System), the main control system of power plants, is an automated system for enhancing operational efficiency by monitoring, tuning and real-time operation. DCS is becoming more intelligent and open systems as Information technology are evolving. In addition, there are a large amount of investment to enable proactive facility management, maintenance and risk management through the predictive diagnostics. However, new upcoming weaponized malware, such as Stuxnet designed for disrupting industrial control system(ICS), become new threat to the main control system of the power plant. Even though these systems are not connected with any other outside network. The main control systems used in the power plant usually have been used for more than 10 years. Also, this system requires the extremely high availability (rapid recovery and low failure frequency). Therefore, installing updates including security patches is not easy. Even more, in some cases, installing security updates can break the warranty by the vendor's policy. If DCS is exposed a potential vulnerability, serious concerns are to be expected. In this paper, we conduct the penetration test by using NESSUS, a general-purpose vulnerability scanner under the simulated environment configured with the Ovation version 1.5. From this result, we suggest a log analysis method to detect the security infringement and react the incident effectively.

A Study on the Claim for Damages for Detention resulted from the Breach of Safe Port Warranty under Voyage Charter (항해용선계약상 안전항담보의무위반에 의한 초과정박손해배상금의 청구에 관한 연구)

  • Han, Nak-Hyun
    • Journal of Korea Port Economic Association
    • /
    • v.25 no.2
    • /
    • pp.149-176
    • /
    • 2009
  • In Count case, the owners claimed from the charterers the amount of their loss resulting from the delay to the Count caused by the blockage of the channel due to stranding of the Pongola on the ground that this loss resulted from breach by the charterers of the safe port provisions. The Claim was referred to arbitration and dealt with on written submission. In a reasoned award, the arbitrators upheld the owners' claim. The charterers seek an order reversing the award or remitting it to the arbitrators for further consideration : (1) That the tribunal was wrong to find that the port of Beira was unsafe and that in consequence the charterers were liable to the owners in damages for detention. (2) That the tribunal was wrong to find that the port was unsafe in the abstract by reference to the fact that two other vessels had grounded there. (3) Having held that the Count was delayed for a little over four days by the fact that, after the charterers had nominated the port, the Pongola had grounded in the access channel, the tribunal should have held that the port was not prospectively unsafe. On the that the grounding the Pongola was caused by the characteristics which made the port an unsafe port to nominate for the Count. The court was held that it was not an independent event which broke the chain of causation between the breach of contract and the owner's loss. For those reasons, the court was upheld the arbitrator's award.

  • PDF

A Study on Integrated Logistic Support (통합병참지원에 관한 연구)

  • 나명환;김종걸;이낙영;권영일;홍연웅;전영록
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2001.06a
    • /
    • pp.277-278
    • /
    • 2001
  • The successful operation of a product In service depends upon the effective provision of logistic support in order to achieve and maintain the required levels of performance and customer satisfaction. Logistic support encompasses the activities and facilities required to maintain a product (hardware and software) in service. Logistic support covers maintenance, manpower and personnel, training, spares, technical documentation and packaging handling, storage and transportation and support facilities.The cost of logistic support is often a major contributor to the Life Cycle Cost (LCC) of a product and increasingly customers are making purchase decisions based on lifecycle cost rather than initial purchase price alone. Logistic support considerations can therefore have a major impact on product sales by ensuring that the product can be easily maintained at a reasonable cost and that all the necessary facilities have been provided to fully support the product in the field so that it meets the required availability. Quantification of support costs allows the manufacturer to estimate the support cost elements and evaluate possible warranty costs. This reduces risk and allows support costs to be set at competitive rates.Integrated Logistic Support (ILS) is a management method by which all the logistic support services required by a customer can be brought together in a structured way and In harmony with a product. In essence the application of ILS:- causes logistic support considerations to be integrated into product design;- develops logistic support arrangements that are consistently related to the design and to each other;- provides the necessary logistic support at the beginning and during customer use at optimum cost.The method by which ILS achieves much of the above is through the application of Logistic Support Analysis (LSA). This is a series of support analysis tasks that are performed throughout the design process in order to ensure that the product can be supported efficiently In accordance with the requirements of the customer.The successful application of ILS will result in a number of customer and supplier benefits. These should include some or all of the following:- greater product uptime;- fewer product modifications due to supportability deficiencies and hence less supplier rework;- better adherence to production schedules in process plants through reduced maintenance, better support;- lower supplier product costs;- Bower customer support costs;- better visibility of support costs;- reduced product LCC;- a better and more saleable product;- Improved safety;- increased overall customer satisfaction;- increased product purchases;- potential for purchase or upgrade of the product sooner through customer savings on support of current product.ILS should be an integral part of the total management process with an on-going improvement activity using monitoring of achieved performance to tailor existing support and influence future design activities. For many years, ILS was predominantly applied to military procurement, primarily using standards generated by the US Government Department of Defense (DoD). The military standards refer to specialized government infrastructures and are too complex for commercial application. The methods and benefits of ILS, however, have potential for much wider application in commercial and civilian use. The concept of ILS is simple and depends on a structured procedure that assures that logistic aspects are fully considered throughout the design and development phases of a product, in close cooperation with the designers. The ability to effectively support the product is given equal weight to performance and is fully considered in relation to its cost.The application of ILS provides improvements in availability, maintenance support and longterm 3ogistic cost savings. Logistic costs are significant through the life of a system and can often amount to many times the initial purchase cost of the system.This study provides guidance on the minimum activities necessary to Implement effective ILS for a wide range of commercial suppliers. The guide supplements IEC60106-4, Guide on maintainability of equipment Part 4: Section Eight maintenance and maintenance support planning, which emphasizes the maintenance aspects of the support requirements and refers to other existing standards where appropriate. The use of Reliability and Maintainability studies is also mentioned in this study, as R&M is an important interface area to ILS.

  • PDF