• 제목/요약/키워드: virtual image technique

검색결과 182건 처리시간 0.019초

D4AR - A 4-DIMENSIONAL AUGMENTED REALITY - MODEL FOR AUTOMATION AND VISUALIZATION OF CONSTRUCTION PROGRESS MONITORING

  • Mani Golparvar-Fard;Feniosky Pena-Mora
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.30-31
    • /
    • 2009
  • Early detection of schedule delay in field construction activities is vital to project management. It provides the opportunity to initiate remedial actions and increases the chance of controlling such overruns or minimizing their impacts. This entails project managers to design, implement, and maintain a systematic approach for progress monitoring to promptly identify, process and communicate discrepancies between actual and as-planned performances as early as possible. Despite importance, systematic implementation of progress monitoring is challenging: (1) Current progress monitoring is time-consuming as it needs extensive as-planned and as-built data collection; (2) The excessive amount of work required to be performed may cause human-errors and reduce the quality of manually collected data and since only an approximate visual inspection is usually performed, makes the collected data subjective; (3) Existing methods of progress monitoring are also non-systematic and may also create a time-lag between the time progress is reported and the time progress is actually accomplished; (4) Progress reports are visually complex, and do not reflect spatial aspects of construction; and (5) Current reporting methods increase the time required to describe and explain progress in coordination meetings and in turn could delay the decision making process. In summary, with current methods, it may be not be easy to understand the progress situation clearly and quickly. To overcome such inefficiencies, this research focuses on exploring application of unsorted daily progress photograph logs - available on any construction site - as well as IFC-based 4D models for progress monitoring. Our approach is based on computing, from the images themselves, the photographer's locations and orientations, along with a sparse 3D geometric representation of the as-built scene using daily progress photographs and superimposition of the reconstructed scene over the as-planned 4D model. Within such an environment, progress photographs are registered in the virtual as-planned environment, allowing a large unstructured collection of daily construction images to be interactively explored. In addition, sparse reconstructed scenes superimposed over 4D models allow site images to be geo-registered with the as-planned components and consequently, a location-based image processing technique to be implemented and progress data to be extracted automatically. The result of progress comparison study between as-planned and as-built performances can subsequently be visualized in the D4AR - 4D Augmented Reality - environment using a traffic light metaphor. In such an environment, project participants would be able to: 1) use the 4D as-planned model as a baseline for progress monitoring, compare it to daily construction photographs and study workspace logistics; 2) interactively and remotely explore registered construction photographs in a 3D environment; 3) analyze registered images and quantify as-built progress; 4) measure discrepancies between as-planned and as-built performances; and 5) visually represent progress discrepancies through superimposition of 4D as-planned models over progress photographs, make control decisions and effectively communicate those with project participants. We present our preliminary results on two ongoing construction projects and discuss implementation, perceived benefits and future potential enhancement of this new technology in construction, in all fronts of automatic data collection, processing and communication.

  • PDF

가임기 여성의 방사선 치료 시 난소 선량 평가 (Evaluation of Ovary Dose of Childbearing age Woman with Breast cancer in Radiation therapy)

  • 박성준;이영철;김선명;김영범
    • 대한방사선치료학회지
    • /
    • 제33권
    • /
    • pp.145-153
    • /
    • 2021
  • 목 적: 본 연구에서는 가임기 여성의 유방암 방사선 치료 시 난소 선량에 대해 실험을 통하여 평가해보고자 한다. 치료기법에 따른 치료계획시스템에서 계산된 선량과 열형광선량계를 이용한 측정선량을 비교·분석하여 난소 선량을 평가하고 납(Pb) 앞치마의 사용유무에 따른 선량 분석을 통해 임상에서의 유용성을 알아보고자 한다. 대상 및 방법: 측정에는 Rando humanoid phantom을 이용하였고, 치료기법으로는 쐐기필터치료기법, 3차원 입체조형치료, 세기변조방사선치료를 사용하였다. CT simulator를 이용하여 얻은 Rando humanoid phantom 3D 영상의 우측 유방에 처방선량의 95%가 전달될 수 있도록 치료계획을 세웠고, TLD를 Rando hunmanoid phantom의 가상 표적의 표면 및 심부에 삽입하고 방사선을 조사하였다. 측정위치는 치료 중심점과 Rando humanoid phantom의 정중앙을 중심으로 반대쪽 유방으로 2cm 이동한 지점과 치료 중심축 및 하방으로 우측 유방의 경계면에서 5cm, 10cm, 12.5cm, 15cm, 17.5cm, 20cm, 우측 난소 위치의 표면과 중심점을 포함하여 총 9개 지점에서 측정하였다. 치료계획시스템의 선량 비교에서는 쐐기필터치료기법 2가지와 3차원 입체조형치료, 세기변조방사선치료 등 총 4개의 치료 계획을 수립하여 비교하였다. 그리고 TLD를 이용한 측정값 비교는 세기변조방사선치료와 쐐기필터를 이용한 치료를 비교하였고, 납 앞치마의 사용유무에 따라서 세기변조방사선치료의 선량차이를 측정하여 비교·분석하였다. 측정값은 각 포인트마다 3개의 TLD값 평균을 내고 TLD 교정값을 이용하여 환산하였으며 이를 Point dose mean값으로 계산하였다. 치료계획값과 실제 측정값을 비교하기 위해 각 지점마다 절대선량값을 측정하여 %Diff 값으로 계산하였다. 결 과: 치료 중심점인 Point A에서는 치료계획시스템에서 최대 201.7cGy가 나왔고, 실제 TLD 측정값은 최대 200.6cGy가 나왔다. 모든 치료계획시스템에서 유방 경계면으로부터 하방으로 17.5cm 떨어진 지점인 Point G 부터는 0cGy로 계산이 되었다. 실제 TLD 측정 결과 Point G에서는 최대 2.6cGy가 나왔고, 난소선량인 Point J에서는 최대 0.9cGy로 나타났으며 %Diff값은 0.3%~1.3%였다. 납 앞치마의 사용유무에 따른 선량 차이는 최대 2.1cGy에서 최소 0.1cGy로 나타났으며 %Diff값은 0.1%~1.1%였다. 결 론: 치료계획시스템에서 3가지 치료계획에 따른 선량차이는 최저 0.85%에서 최고 2.45%로 큰 격차를 보이지 않았다. 난소에서 Rando humanoid phantom의 치료계획과 실제 측정한 선량차이는 0.9% 이내로 나타났으나 실제 측정에서 조금 더 높게 측정되었다. 이는 치료계획시스템에서 산란선의 영향을 정확하게 반영하지 못하였고, 실제 측정에서는 TLD를 삽입한 상태로 CBCT를 촬영한 선량과 산란선량이 반영된 것으로 사료된다. 납 앞치마의 유무에 따른 선량측정에서 납 앞치마를 사용했을 경우에 치료범위에서 가까운 거리일수록 차폐의 효과가 있었으며, 치료범위에서 15cm 이상 거리가 있는 경우에는 거의 영향을 미치지 않는 것으로 나타났다. 임상적으로 방사선 치료 중에는 임신이나 인공수정을 하기에는 적절하지 않지만, 치료 중 난소에 조사된 선량은 방사선 치료 후 가임기 여성의 생식 기능에 크게 영향을 주지 않을 것으로 생각된다. 하지만 가임 여성의 경우에는 지속적인 불안감을 가지고 있으므로 이번 결과를 통한 데이터를 제시함으로써 심리적인 안정을 도모할 수 있을 것으로 사료된다.