• 제목/요약/키워드: urban subway construction

Search Result 103, Processing Time 0.025 seconds

Comparative Analysis of Estimation of Demand for Urban Railway Stations and Forecast of Transportation Facilities Size Prediction (도시철도역 이용수요 추정 및 이동편의시설 규모 예측 비교 분석)

  • Kim, Hwang Bae;Lee, Sang Hwa;Bae, Choon Bong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.877-886
    • /
    • 2019
  • The size of the subway entrance should be calculated according to the user's demand, but Korea has the same size for each entrance by applying a uniform value. Recently, the installation of mobile convenience facilities such as escalators, elevators, etc. is mandated by the traffic weakness promotion law, but it is inconvenient to use the existing stations because it is mainly arranged in the place where it can be installed regardless of user demand. This study aims to establish a model for estimating the size of mobile convenience facilities by predicting the use demand of each station entrance so that the location and size of mobile facilities can be reflected in the design or construction of the station. To this end, a multiple regression model was established to forecast daily demand by utilizing the demand for getting on and off by station and the building association area for each purpose around the railway station. The actual data of Dongdaemun and Jonggak Stations were used to verify the estimated model. In addition, the escalator installation scale was compared / analyzed by doorway using domestic and overseas escalator equations. As a result, it was more accurate to estimate the usage demand for a single station. Also, Jonggak Station has an up and down escalator installed at exit 1, but it was analyzed that it is appropriate to install at exit 4. This study is an advanced form of the essay model for estimating the users of the entrance and exit users of urban railway stations published in 2018. In addition, it seems to be the basis of the current escalator installation criteria.

A Case Study of Blast Demolition at Chung-Ang Department Store in Daejeon City (대전 중앙데파트 발파해체 사례)

  • Min, Hyung-Dong;Park, Jong-Ho;Song, Young-Suk;Park, Hoon
    • Explosives and Blasting
    • /
    • v.27 no.1
    • /
    • pp.62-78
    • /
    • 2009
  • Recently, construction techniques have been rapidly developed with reconstruction of old buildings, urban regeneration and efforts of restoring natural ecology, so demolition of deteriorated buildings has been rapidly increasing. Demolition work of building should be executed without damaging surrounding environments according to relevant regulations. There are various demolition methods and among them, explosives demolition is the most practical way for expenses and safety of work. As a part of Daejeon stream ecological restoration project, this thesis is a case of executing demolition of Chung-Ang Department Store which was built 35 years ago as covered structure on the upper part of Daejeon stream with explosives demolition. This structure is 8 stories high, total height of 41.6 m including basement floor, $1,650m^2$ for building area and $18,351m^2$ for total floor area. It is located in the center of Daejeon city where shopping centers and buildings are crowded and main facilities are Daejeon subway (18m), backside shopping center (20m), underground shopping center(15m), Mokchuk bridge, Eunjung bridge(0.25m) and fiber-optic cable(0.25m). In this project, implosion was selected for explosives demolition methods by considering this area being a busy urban area, and this project was executed after examining collapse movement of structure in advance using simulation program not to damage main facilities. Total 80kg of explosives and 1,000 detonators were being used. This project will be a good case of executing explosives demolition successfully by applying implosion on urban area in the country.

Construction of an Estimation Model for Intersection Queue Length (교차로의 대기행렬 예측모형구축에 관한 연구)

  • Cho, Hyung K.;Min, Joon H.;Choi, Jong U.
    • The Transactions of the Korea Information Processing Society
    • /
    • v.3 no.5
    • /
    • pp.1070-1081
    • /
    • 1996
  • In this research, a model was developed for estimating the queue length of vehicles, based on occupancy time of each vehicle collected by loop detectors which were setup at the upstream of urban street. The estimation model suggestes a method which minimizes architectural effects of the street, such as existence of pedestrian crossing, for future applications to the field. The estimation model suggested in this research was established based on real traffic data collected at up-stream detectors in Kangnam Subway station, Seoul, and the formula of the model is based on Multi-Polynomial equations. Consequence of the experiments showed that the model can adequately and in real-time mode measure length of the queue which were constructed at the 80 to 90 meters away from the upstream detectors. The estimation accuracy of the model was verified in statistical analysis conducted by regressing analysis and test results in real traffic situation.

  • PDF

Suitability Assessment and Maintenance Planning of the Guided Drainage Method on Underpass Structure (유도배수공법을 적용한 지하차도 설계 및 유지관리방안)

  • Jin, Kyu-Nam;Lee, Jung-Min;Kim, Young-Jin;Park, Jae-Hyeon;Cho, Gye-Chun
    • Land and Housing Review
    • /
    • v.3 no.1
    • /
    • pp.97-109
    • /
    • 2012
  • For the design of underpass structures, -1.0m(G.L) ground water level guideline for the design of railway, subway, utility tunnel etc, is still being used in Korea. As a result, the underpass structure can be forced by buoyancy, and therefore the in-situ buoyancy anchor method is usually being applied to prevent the uplifting force. For the Yeongjongdo sky city project, the drainage method was applied to remove the buoyancy force. In this study we estimate the efficiency and safety of the applied design and propose the detailed guidelines for standard design and maintenance of the guided drainage technique. Especially, the auxiliary pumping well was operated to maintain the ground water level around the underpass. In the study site, the applied guided drainage method has advantages in both engineering and economic aspects.

Analysis of Geological Factors for Risk Assessment in Deep Rock Excavation in South Korea (한국의 대심도 암반 굴착 위험도 산정을 위한 인자 분석)

  • Ihm, Myeong Hyeok;Lee, Hana
    • Tunnel and Underground Space
    • /
    • v.31 no.4
    • /
    • pp.211-220
    • /
    • 2021
  • Tunnel collapse often occurs during deep underground tunneling (> 40 m depth) in South Korea. Natural cavities as well as water supply pipes, sewer pipes, electric power cables, artificial cavities created by subway construction are complexly distributed in the artificial ground in the shallow depths of the urban area. For deep tunnel excavation, it is necessary to understand the properties of the ground which is characterized by porous elements and various geological structures, and their influence on the stability of the ground. This study analyzed geological factors for risk assessment in deep excavation in South Korea based on domestic and overseas case study. As a result, a total of 7 categories and 38 factors were derived. Factors with high weights were fault and fault clay, differential stress, rock type, groundwater and mud inrush, uniaxial compressive strength, cross-sectional area of tunnel, overburden thickness, karst and valley terrain, fold, limestone alternation, fluctuation of groundwater table, tunnel depth, dyke, RQD, joint characteristics, anisotropy, rockburst and so forth.

A study on the applicability of under ground structure using steel tubular roof in Korean geotechnical condition (대구경강관을 이용한 지하구조물 축조공법의 국내지반 적용성 연구)

  • Lee, Young-Bock;Kim, Jeong-Yoon;Park, Inn-Joon;Kim, Kyong-Gon;Lee, Jong-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.4
    • /
    • pp.401-409
    • /
    • 2003
  • Recently, the development of underground structures is to be inevitably necessary due to the increase in population and traffic volume that has caused to the limit of urban land use and the heavy traffic jams. Therefore, underground structures such as subway, underground shopping centers, lifeline facilities and so on, have been increasingly constructed, On the other hand, several social problems have occurred during construction, i.e., ground subsidence, noise, and vibration. Therefore, safer and more beneficial methods for underground construction are on the demand. In this research, N.T.R.(New Tubular Roof) method has been modified and utilized for solving those problems and overcoming the difficulties connected with the bored tunnel construction of large underground openings in unfavorable ground, often under the water table, and with overburdens that are too shallow to solve problems of stability using traditional methods. The N.T.R. method has been modified to suit for Korean geotechnical conditions, and was made up for the weak points-the water leakage from walls and tops, the maintenance and the lack of stability-of the conventional methods. This paper dealt with the features and the applicability of N.T.R. Method based on the results from numerical analysis and data from in-situ monitoring system.

  • PDF

Groundwater Flow Analysis During Excavation for Underground Tunnel Construction (지하 터널 건설을 위한 굴착 시 지하수 유동 분석)

  • Sungyeol Lee;Wonjin Baek;Jinyoung Kim;Changsung Jeong;Jaemo Kang
    • Journal of the Korean GEO-environmental Society
    • /
    • v.25 no.6
    • /
    • pp.19-24
    • /
    • 2024
  • Urban densification has necessitated the development of subterranean spaces such as subway networks and underground tunnels to facilitate the dispersal and movement of populations. Development of these underground spaces requires excavation from the ground surface, which can induce groundwater flow and potentially lead to ground subsidence and sinkholes, damaging structures. To mitigate these risks, it is essential to model groundwater flow prior to construction, analyze its characteristics, and predict potential groundwater discharge during excavation. In this study, we collected meteorological, topographical, and soil conditions data for the city of ○○, where tunnel construction was planned. Using the Visual MODFLOW program, we modeled the groundwater flow. Excavation sections were set as drainage points to monitor groundwater discharge during the excavation process, and the effectiveness of seepage control measures was assessed. The model was validated by comparing measured groundwater levels with those predicted by the model, yielding a coefficient of determination of 0.87. Our findings indicate that groundwater discharge is most significant at the beginning of the excavation. Additionally, the presence of seepage barriers was found to reduce groundwater discharge by approximately 59%.

A study on hydraulic back analysis for an urban tunnel site and stability analysis based on hydro-mechanical coupling analysis (도심지 터널 용출수 발생구간에서의 수리 역해석 및 수리-역학 연계해석을 통한 안정성 해석 연구)

  • Park, Inn-Joon;Song, Myung-Gyu;Shin, Uyu-Soung;Park, Yong-Su
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.4
    • /
    • pp.397-404
    • /
    • 2008
  • Excessive amount of groundwater flowed into tunnel, while constructing Incheon international airport railway. Tunnel passes under subway line no. 2 with only 1.76 m below. To protect the existing structure, TRcM excavation method was applied. As station and construction shaft are already constructed, which are located back and forth of TRcM section, 86.4 ton per day of groundwater inflow is against expectation. To identify mechanism of excessive water inflow, hydraulic back analyses were performed. Then, hydro-mechanical coupled analysis were also performed with the hydrogeologic parameters identified, whose results are investigated for checking the stability of adjacent structures to the tunnel under construction. And a number of mechanical analyses were also performed to check the hydro-mechanical coupling effect. The result from the mechanical analysis shows that subsidence and tunnel ceiling displacement will be 0.85 mm and 1.32 mm. The result of hydro-mechanical couple analysis shows that subsidence and maximum tunnel ceiling displacement will be 1.2 mm and 1.72 mm. Additional displacements caused by groundwater draw down were identified, however, displacement is minute.

  • PDF

A Study on the Construction for Transfer System between Tram and Public Traffic System - In the Place of Changwon Area - (노면전철과 대중교통수단 간의 환승체계 구축에 관한 연구 - 창원 지역을 중심으로 -)

  • Choi, Yang-Won;Park, Do-Yun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.1
    • /
    • pp.273-286
    • /
    • 2013
  • Recently, due to problems with subway and bus operations, a need has emerged for a solution such as the introduction of an Advanced Transit System. In several municipalities, systems have been introduced using light rail as AGT urban aesthetics construction. There is high inhibition and civil cases are delayed by more environmentally friendly and accessible remedies. For the purpose of this study, Changwon city would be transformed to have an environmentally friendly transportation system such as a tram with an overview. Features, advantages, and disadvantages are analyzed, and systems are established the existing public transport routes by transfer system. Changwon city's tram plan is first step in open in year 2018, and second step with the opening goal of the year 2021, and the total line length of 33.9 km, the station will be built in the 38 locations. and also in 2011 a feasibility study, evaluated a low economic as B/C to 0.88, but it evaluated the high value of the policy analysis as AHP to 0.502. However, introduction of a tram project that should precede the as following condition. The first step in Changwon city's tram plan would be as follows : The introduction of the tram system would demand traffic management along with a restructuring of the bus system, and the tram system would be selected for domestic realities. Secondly, the introduction of trams would comprehend the advanced traffic composition in accordance with the consensus of the citizenship, and a legal system should be established for the introduction of the trams.

A study on efficient management of the drainages of underground tunnels for environmentally friendly urban railway systems (도시철도 친환경 지하터널 배수형식의 효율적인 유지관리 방안 검토)

  • Baek, Jong-Myeong;Hong, Jong-Hun;Kim, Han-Bae
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1982-1990
    • /
    • 2010
  • Excepting tunnel of dorimstream - ccachimountain station section, the subway line No.2th section was build using ASSM and NATM methods because of soil pressure and land condition. The way of dealing underground water was selected without sufficient preconsideration of geographical features, ground condition, influence of lowing underground water, and long-term cost of running maintenance so that the form of undrained tunnel was build having decreased construction characteristics and technically improper elements. The form of partial drainage is very difficult to manage structures of tunnel, because water leakage, water pressure causing cracks of lining concretes and scaling are constantly happened. so partial drainage suggest that setting reinforced Anchor Bolt to prevent buoyancy and should increase center drainage way up to height of railroad. Partial drainage suggest that holey pipe(${\phi}$350mm) manhole, drainage checking pipe manhole are should be regularly dredged, when changing roadbed(gravel${\rightarrow}$concrete) drainage checking pipe manhole should be build and setting a limitation of entering underground water's quantities. Beside drainage degree in changed section of structures causing instability of structures is continuous degree. so if efficient drainage way and the patterns of flaws, problems are considered in survey, it will be expected to have a advantage condition in maintenance part.

  • PDF