• Title/Summary/Keyword: urban project

검색결과 1,330건 처리시간 0.03초

시스템 엔지니어링에 기초한 도시형 자기부상열차 실용화 타당성 조사 사업의 수행방법 연구 (A Study on the Method of the Project for Feasibility Study to Practical Use Urban Transit Maglev Based on System Engineering)

  • 정경렬;윤세균;박철호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 춘계학술대회 특별세미나. 특별세션
    • /
    • pp.47-59
    • /
    • 2006
  • This study is about a feasibility study for the practical using Urban Transit Maglev system based on systems engineering. First of all we defined what phase is matched with the project for feasibility study in the system life cycle and identified tasks that shall be done in the phase. Finally we suggested how to do in this project. The Urban Transit Maglev system is not wholly new system. It has similar architecture to a legacy urban railway system. But it is the system that is partially introduced new technology, because there are many projects have this characteristic within the country, we expect that this study may provide references.

  • PDF

A Risk Performance Measurement System for the Mega-Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • 제12권1호
    • /
    • pp.57-64
    • /
    • 2010
  • In recent years, interests and studies on the urban regeneration projects have been increased and largely conducted. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

A Study on Constructing Common Database for Supporting Urban Rail Transit Project

  • Lee, Young-Hoon;Lee, Jae-Chon
    • 조명전기설비학회논문지
    • /
    • 제23권11호
    • /
    • pp.44-51
    • /
    • 2009
  • A variety of Urban Rail Transit (URT) systems have been operating and they have different technology bases, causing a lot of difficulties in taking measures against trouble, training, upgrading, interoperability and so on. As such, a standardization project has been carried out to solve the problems by setting up the national standards for URT systems. A common database was built to provide the integrated engineering environment to the community of URT project. This paper discusses the design of the database and how it can be utilized in the successful promotion of the project. The products of the projects are stored into the database with traceability management to be referred to by other new URT projects for reusing and sharing the acquired knowledge through cross organizations.

도시재생사업의 갈등 최소화를 위한 경로분석 (Path-Analysis for Minimize a Conflict on Urban Regeneration Project)

  • 김가람;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.181-184
    • /
    • 2011
  • The earlier studies which are related to conflict management for urban regeneration project were based on limited case-studies on a specific phase. In addition, those studies did not considered a multidisciplinary approach for critical factor of conflict occurrence. In this reason, to establish a practical management or a policy is limited. In this paper, 'Good communication and information sharing' and 'Cooperativeness of stakeholders on project' are defined by critical factors for minimization of conflict between stakeholders. Furthermore we analysis the influence of those factors to minimization of conflict using path-analysis. This paper contributes to increase the efficiency of conflict management through understanding influence of each factors.

  • PDF

A STUDY ON DEVELOPING DECISION SUPPORT MODULES OF iPMIS(INTELLIGENT PROGRAM MANAGEMEN INFORMATION SYSTEM) FROM ONTOLOGICAL PERSPECTIVE

  • Jae-Bok Lim;Ju-Hyung Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.717-724
    • /
    • 2009
  • Most recent programs in and out of the country are related to urban renewal projects. Contemporary project management information systems have been developed was to manage single or multiple projects focusing on their construction phase, and those have limitations to apply to large-scale complicated mega projects. So, this study explain the core concept of decision support modules for iPMIS (Intelligent Program Management Information System) and its major functions to support project owner and participants by introducing ontology in the web environment. This study confined the scope of research to the planning phase of urban environment improvement projects. Ontological logic structure and relation about planning works is essential parts and three functions to implement decision support module are developed.

  • PDF

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

신·구시가지의 도시공원 불균형 분포 분석 및 개선방안 연구 (A Study on Improving the Unbalanced Deployment of Urban Parks)

  • 성현찬;이양주
    • 한국환경복원기술학회지
    • /
    • 제15권3호
    • /
    • pp.1-15
    • /
    • 2012
  • The objective of this study is to analyze the distribution of urban parks and its problems in a city in Gyeonggi-do where new towns and old towns are mixed. The study will also analyze and understand the unbalanced deployment of urban parks - rest areas and carbon absorbers of an entire city - between old towns and new towns, suggest improvement opportunities and examine and suggest plans to create and expand urban parks in old cities that lack urban parks. Findings showed that first, new towns were 1.2~1.6 higher than old towns in the number of parks, park area, and per capita park area, indicating that parks were unbalanced across towns. Second, as for a plan for improving the unbalanced deployment of urban parks, when the use area needs to be changed in an urban development project, it was suggested to donate 10% of the project site to the city to create it into a park and it was suggested to identify and proactively improve alternative park resources that can replace parks such as rivers and recreational sites. Third, regarding a plan for improving urban parks in old towns, it was suggested to secure urban parks by attracting various urban development projects to old town areas. The amendment of related laws was proposed to double required park area to $6m^2$ per household. Amendments were also suggested for one law and four guidelines to specifically define the location of urban parks as well.

평택시 남부권역 구도심의 문제점 파악을 통한 도시재생 전략 도출 연구 : SWOT 분석을 중심으로 (A Study of Urban Regeneration Strategies Based on th Identification of Problems in the Old Downtown in South Pyeongtaek City : SWOT Analysis)

  • 정혜윤
    • 도시과학
    • /
    • 제9권2호
    • /
    • pp.69-82
    • /
    • 2020
  • The purpose of this study were to examine the deterioration of the old downtown in the southern area of Pyeongtaek City and derive suggestions for an urban regeneration project in South Pyeongtaek City. To do so, the researchers investigated the researchers investigated the deterioration and current status of the downtown from a multifaceted perspective based on previous in depth. It was found that in Pyeongtaek City, problems unique to the southern, Pyeongtaek, and Paengeong areas interplayed in a complicated manner. Accordingly, for the urban regeneration project to be effective, continuous participation of experts and community residents with intimate knowledge of the regional features is essential. This study focused on identifying the reasons why the old downtown has deteriorated and suggesting ways to revitalize it. The study is of significance in that it derived urban regeneration strategies based on regional features.

COMPENSATION STRUCTURE AND CONTINGENCY ALLOCATION IN INTEGRATED PROJECT DELIVERY SYSTEMS

  • Mei Liu;F. H. (Bud) Griffis;Andrew Bates
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.338-343
    • /
    • 2013
  • Integrated Project Delivery (IPD) as a delivery method fully capitalizes on an integrated project team that takes advantage of the knowledge of all team members to maximize project outcomes. IPD is currently the highest form of collaboration available because all three core project stakeholders, owner, designer and contractor, are aligned to the same purpose. Compared with traditional project delivery approaches such as Design-Bid-Build (DBB), Design-Build (DB), and CM at-Risk, IPD is distinguished in that it eliminates the adversarial nature of the business by encouraging transparency, open communication, honesty and collaboration among all project stakeholders. The team appropriately shares the project risk and reward. Sharing reward is easy, while it is hard to fairly share a failure. So the compensation structure and the contingency in IPD are very different from those in traditional delivery methods and they are expected to encourage motivation, inspiration and creativity of all project stakeholders to achieve project success. This paper investigates the compensation structure in IPD and provides a method to determine the proper level of contingency allocation to reduce the risk of cost overrun. It also proposes a method in which contingency could be used as a functional monetary incentive when established to produce the desired level of collaboration in IPD. Based on the compensation structure scenario discovered, a probabilistic contingency calculation model was created by evaluating the random nature of changes and various risk drivers. The model can be used by the IPD team to forecast the probability of the cost overrun and equip the IPD team with confidence to really enjoy the benefits of collaborative team work.

  • PDF

도시 자연형하천 공사 후의 경관개선방안 - 서울시 양재천을 사례로 - (Urban Stream Landscape Improvement After Natural-Style Stream Restoration - Case Study of Yangjae Stream, Seoul -)

  • 김선근;김고은;이지은;신동훈;이규석
    • 한국환경복원기술학회지
    • /
    • 제7권5호
    • /
    • pp.66-74
    • /
    • 2004
  • Since 1960s urban streams in Seoul have been dried and polluted because of urbanization. So, these devastated urban stream environment need to be restored for the better life of residents. Since 1995 stream restoration project which is called Natural-Style Stream Project have begun. However, some projects focused on the restoration of park-style open space rather than restoration of stream environment. As a result there are some stream landscapes to be improved. Therefore, this study aims to investigate the current status of urban stream landscape after Natural Style Stream Project and to propose the alternatives for the urban stream landscape improvement. The study site is Yangjae stream, Seoul.