• Title/Summary/Keyword: urban project

Search Result 1,330, Processing Time 0.142 seconds

Challenges in Structural Design of W-Project

  • Kim, Jong Soo
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.3
    • /
    • pp.199-204
    • /
    • 2014
  • W-Project is 70-story mixed-use residential building complex project in Busan, the second biggest city in South Korea. As it is a high rise building complex located at the coast, the residents have great ocean view from the height. Though, there were many difficult challenges to be solved to secure structural safety and meet the serviceability requirements. As it is located on the reclaimed land, securing the foundation bearing capacity on soft soil is the first issue to be solved for the stable structure. W-Project. Busan on the way usual track of typhoon, wind load on structure is also critical for structural safety and serviceability for occupants due to wind vibration. This paper will address process of lateral load resisting structural system of W-Project.

Meeting the Energy Reduction Goal on a High Rise Building thru IPD Framework

  • Jeong, Pyung Oh;Lee, Peter;Kim, Sang-jin
    • International Journal of High-Rise Buildings
    • /
    • v.2 no.2
    • /
    • pp.93-96
    • /
    • 2013
  • Greenhouse gas emissions and excessive energy consumption have been an on-going world issue nowadays. We can find that the majority portion is caused by high-rise office buildings. In order to resolve these problems, it is extremely important to implement various active or passive strategies in a building design. To successfully meet these design goals and energy reduction approaches, a project building must utilize an efficient design process from the early start. One of the most effective project delivery process called Integrated Project Delivery (IPD) will be implemented in a case study project building (KEPCO) during design phase and show how important it is to plan a project's green environmental performance goal together through an early collaboration from all key project participants, which helps to construct an successful green building design without any critical construction pitfalls.

Plans to Improve Smart Village and Its Challenges (스마트 빌리지, 그 계획과 도전)

  • Eom, Seong-Jun;Kim, Sang-Bum;Cho, Suk-Yeong;An, Phil-Gyun
    • Journal of Agricultural Extension & Community Development
    • /
    • v.27 no.4
    • /
    • pp.173-184
    • /
    • 2020
  • Is the Fourth Industrial Revolution a revolution for cities only? Through the Fourth Industrial Revolution, Korea has entered quickly in the influence area of intelligent information technology such as IoT, AI, Big data, Cloud, ICT, Digital twin. However, as the information gap between the rural zone and the urban zone worsens, a policy was needed to reduce such a gap. Therefore, this research analyzed EU's smart village project, and investigated the problem and improvement of the actual smart village through the interview and field study with the person in charge of the actual smart village project in Korea. Based on the analytic result, 5 plans were deduced to improve Korea's smart village project. First, make the realistic adjustment of project period to assure the sustainability of smart village; second, make the new establishment of the department in charge of smart village project; third, construct the system of integrating and cooperating the policy that can embrace all the rural zone and the urban zone; the fourth, expand the application area of customized ICT technology according to the new rural policy environment; and finally introduce the residents' capacity development project through the rural guidance project.

Strategies for Acceleration of Damaged Area Restoration Project in the Development Restriction Zone

  • Park, Seong Yong;Jung, Sung Ae;Lee, Sang Jo;Chung, Jae Woo
    • Journal of People, Plants, and Environment
    • /
    • v.22 no.6
    • /
    • pp.641-651
    • /
    • 2019
  • The purpose of this study is to derive institutional improvement methods for promoting the Damaged Area Restoration Project in greenbelts. The current status of greenbelts in Gyeonggi-do, where greenbelts are extensively distributed was analyzed, and the relevant laws and regulations were reviewed to suggest measures to promote the restoration project. The area of damaged areas within greenbelts in Gyeonggi-do was 6,121,024 m2, accounting for about 0.52% of the total area of greenbelts, and more than 80% was found to be located in Namyangju (55.49%), Hanam (16.48%), and Siheung (8.68%). Various measures to improve the policy were examined as follows: reducing the minimum size of the restoration project area; adjusting baseline of recognizing range of damaged areas; introducing the right of claim for land sale; allowing long-term unexecuted urban parks to be replaced as alternative sites for parks and green spaces; simplifying administrative procedures; and allowing public participation. All of them are expected to promote the restoration project within greenbelts. In results, when the minimum size of area for the restoration project was reduced from 10,000 m2 into 5,000 m2, 3,000 m2 and 2,000 m2, the ratio of the number of combinable lots to the total number of lots increased from 4.4% to 18.8%, 38.8%, and 55.9% respectively in Namyangju. Morever, when the recognizable ranges of the restoration project were extended to the structures obtaining building permit as of March 30, 2016 and obtaining use approvals before December, 2017, the number of applicable lots increased by 5.1% and 9.2% respectively.

Establishment of Product Data Management for Advanced EMU (차세대전동차 정보관리시스템 구축에 관한 연구)

  • Lee, Han-Min;Kim, Gil-Dong;Oh, Seh-Chan
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1418-1422
    • /
    • 2006
  • The project of advanced urban transit system development is developing the advanced vehicle and the core technologies for the cost down by system change, the transport safety and the environmental friendliness and the improvement of passenger service. The product data management system is installed for management of each project. Various data and informations producted from each project are made for database. Therefore, we develop the product data management system.

  • PDF

RESEARCH AND DEVELOPMENT OF PROGRAM MANAGEMENT SUPPORTING SYSTEM

  • Tetsuya Yamada;Shigehiko Tanabe
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.480-489
    • /
    • 2007
  • Program management is a concept to deal with huge and complex business activities from social, economical, cultural and environmental points of view and increase their value for client and society. The aim of this study is to establish a framework of program management process and develop a supporting system for program management. In this paper we propose a framework and a proto type supporting system based on case studies and report the result of application to an urban redevelopment using partially implemented software.

  • PDF

A Conceptual Model for an Administrative and Legal Process Provider of Urban Regeneration using Construction Interactive Electronic Technical Manual (전자매뉴얼을 활용한 도시재생사업의 법.행정절차 제공 시스템의 개념적 모형)

  • Park, Moon-Seo;Jeong, Jin-Wook;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.33-42
    • /
    • 2010
  • Recently construction industry has faced new era as following the advances of IT technology. It becomes possible that information and knowledge among people are exchanged actively thanks to computer-based tools. In fact, the tools, PMIS(Project Management Information System) and KMS(Knowledge Management System) already have been introduced to constuction industry successfully. Lately IETM(Interactive Electronic Technical Manual) is tried to be one of these systems. This trying is being enlarged that the IETM's concept is changed to administrative and legal process provider throughout the lifespan of construction projects. However, it is hard to define construction IETM in mega-scale project like urban regeneration project because construction projects are complex and have diverse stakeholders. These properties may make the IETM ambiguous system. To do define IETM as a administrative and legal process provider, this research will conduct survey and interview, then analyze its own properties and find out design strategies. Based on the properties and strategies, suggesting IETM's system demands and architecture of urban regeneration processes.

The Characteristics of the HafenCity Project - as a model for the European port city development - (유럽 해항도시 항만재개발 롤모델로서 하펜시티 함부르크의 특성에 관한 연구)

  • Chung, Chin-Sung Dury;Cho, Hyun-Chon
    • Journal of Navigation and Port Research
    • /
    • v.35 no.6
    • /
    • pp.539-550
    • /
    • 2011
  • Hamburg is going with the HafenCity Project to create a new urban space for the city's bustling central district. HafenCity will add an additional 155 hectares to Hamburg's central urban area, increasing it's total area by some 40 percent. The qualities of the HafenCity are mainly marked through the location at the water, the river Elbe and the historically embossed milieu the Speicherstadt. A tightly mix of residential accommodation, offices, cultural and leisure amenities, retail facilities and restaurants manages diverse identities of quarters in a framework of an elaborate urban layout. This study is focusing on the purpose of the project goals, the task of the Hamburg authorities and GHS (Gesellschaft fur Hafen und Standortentwicklung) and an urban planning ideas competition (draft masterplan). Regarding of the new trend of the reurbanisation in Europe, the aim of this study is to find out, in which way HafenCity is trying to develope the new city district as a model for the European port city of the 21st century.

A Development of Risk Performance Index for Mega-project Performance Measurement in view of the integrated Cost/Schedule/Risk (비용/공정/위험 통합 관점에서 메가 프로젝트 성과측정을 위한 위험성과지수 개발)

  • Kim, Seon-Gyoo;Park, Kyoo-Young;Yu, Young-Jeong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.69-77
    • /
    • 2009
  • Recently, a research of the urban regeneration has been performed very actively. This is one of the efforts to resolve various social and economic problems coming from the existing deteriorated building and facilities by new urban development or redevelopment. However, an urban regeneration has a characteristic to be unable to ensure the project performance due to the exposed numerous risks coming from the various and complex stake-holders, and its mega sizes. This paper proposes the method of risk performance index in order to improve an efficiency of performance measurement expanding to the risk view point from the existing integrated cost/schedule performance measurement. A risk performance index is compatible with the existing EVMS, and can make the performance measurement in 3 dimensions of the integrated cost/schedule/risk with 18 sub-indexes and variables.

Implications of the Survey on Empty House Using Local Government Data: The Case of M okpo City in Jeollanamdo (지자체 자료를 활용한 빈집 실태조사에 따른 시사점: 전남 목포시 사례)

  • Jimin Chae
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.26 no.1
    • /
    • pp.40-54
    • /
    • 2023
  • The purpose of this study is to present implications using local government data, focusing on the occurrence of empty houses, one of the serious social problems emerging due to population extinction and aging. The subjects of the study were Mokpo-si, which has the highest percentage of empty houses in the country, and the spatial distribution status was identified by schematizing the status of empty houses by grade on a map through data from the local government's survey on empty houses. As a result of the survey on vacant houses, it was confirmed that 90% of empty houses in Mokpo City were included in the project district of the urban regeneration strategy plan underway in Mokpo City. Currently, the empty house maintenance project is difficult to proceed smoothly due to difficulties in purchasing empty houses and lack of budget for local governments, so in order for the project to proceed quickly, it is necessary to come up with a plan to promote the project in connection with the urban regeneration strategy plan in Mokpo.