• Title/Summary/Keyword: urban modeling

Search Result 791, Processing Time 0.03 seconds

Urban Big Data: Social Costs Analysis for Urban Planning with Crowd-sourced Mobile Sensing Data (도시 빅데이터: 모바일 센싱 데이터를 활용한 도시 계획을 위한 사회 비용 분석)

  • Shin, Dongyoun
    • Journal of KIBIM
    • /
    • v.13 no.4
    • /
    • pp.106-114
    • /
    • 2023
  • In this study, we developed a method to quantify urban social costs using mobile sensing data, providing a novel approach to urban planning. By collecting and analyzing extensive mobile data over time, we transformed travel patterns into measurable social costs. Our findings highlight the effectiveness of big data in urban planning, revealing key correlations between transportation modes and their associated social costs. This research not only advances the use of mobile data in urban planning but also suggests new directions for future studies to enhance data collection and analysis methods.

Nonlinear modeling parameters of RC coupling beams in a coupled wall system

  • Gwon, Seongwoo;Shin, Myoungsu;Pimentel, Benjamin;Lee, Deokjung
    • Earthquakes and Structures
    • /
    • v.7 no.5
    • /
    • pp.817-842
    • /
    • 2014
  • ASCE/SEI 41-13 provides modeling parameters and numerical acceptance criteria for various types of members that are useful for evaluating the seismic performance of reinforced concrete (RC) building structures. To accurately evaluate the global performance of a coupled wall system, it is crucial to first properly define the component behaviors (i.e., force-displacement relationships of shear walls and coupling beams). However, only a few studies have investigated on the modeling of RC coupling beams subjected to earthquake loading to date. The main objective of this study is to assess the reliability of ASCE 41-13 modeling parameters specified for RC coupling beams with various design details, based on a database compiling almost all coupling beam tests available worldwide. Several recently developed coupling beam models are also reviewed. Finally, a rational method is proposed for determining the chord yield rotation of RC coupling beams.

A Study on Establishment of 3D Digital Restoration of Cheongju Townscape in the 1960s - Focused on the Simplified Modeling of Nammun-ro 2ga dong - (1960년대 청주 도심경관의 3차원 디지털 복원모델 구축에 관한 연구 - 남문로 2가동의 간략화 모델작성을 중심으로 -)

  • Kim, Tai-Young;Cho, Sang-Min;Son, In-Bin
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.21 no.6
    • /
    • pp.31-40
    • /
    • 2019
  • This study aims to establish Nammun-ro 2ga in Cheongju city in the 1960s as three-dimensional digital information data for the restoration of urban archetypes. For this purpose, referring to the existing restoration map and model of Cheongju urban area in the 1960s, and the results of this study are as follows. Firstly, the buildings that can be generally classified are prepared through the modeling of parametric families. Secondly, the untypical models(combined and broken roofs, atypical and large scale buildings) of them are simply performed through solid modeling. And then, these simplified models are simulated through a sky view, a walking sight, and information analysis. Through this study, it will be possible to visualize and regenerate the low and dense area of Cheongju city in the 1960s.

Fuzzy methodology application for modeling uncertainties in chloride ingress models of RC building structure

  • Do, Jeongyun;Song, Hun;So, Seungyoung;Soh, Yangseob
    • Computers and Concrete
    • /
    • v.2 no.4
    • /
    • pp.325-343
    • /
    • 2005
  • Chloride ingress is a common cause of deterioration of reinforced concrete located in coastal zone. Modeling the chloride ingress is an important basis for designing reinforced concrete structures and for assessing the reliability of an existing structure. The modeling is also needed for predicting the deterioration of a reinforced structure. The existing deterministic solution for prediction model of corrosion initiation cannot reflect uncertainties which input variables have. This paper presents an approach to the fuzzy arithmetic based modeling of the chloride-induced corrosion of reinforcement in concrete structures that takes into account the uncertainties in the physical models of chloride penetration into concrete and corrosion of steel reinforcement, as well as the uncertainties in the governing parameters, including concrete diffusivity, concrete cover depth, surface chloride concentration and critical chloride level for corrosion initiation. There are a lot of prediction model for predicting the time of reinforcement corrosion of structures exposed to chloride-induced corrosion environment. In this work, RILEM model formula and Crank's solution of Fick's second law of diffusion is used. The parameters of the models are regarded as fuzzy numbers with proper membership function adapted to statistical data of the governing parameters instead of random variables of probabilistic modeling of Monte Carlo Simulation and the fuzziness of the time to corrosion initiation is determined by the fuzzy arithmetic of interval arithmetic and extension principle. An analysis is implemented by comparing deterministic calculation with fuzzy arithmetic for above two prediction models.

The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular (유닛모듈러 기반 도시형 생활주택의 BIM 모델링 프로세스 개발 연구)

  • Lee, Chang-Jae;Lim, Seok-Ho
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.77-84
    • /
    • 2012
  • The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.

Linking LOD and MEP Items towards an Automated LOD Elaboration of MEP Design

  • Shin, Minso;Park, SeongHun;Kim, Tae wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.768-775
    • /
    • 2022
  • Current MEP designs are mostly applied by 2D-based design methods and tend to focus on simple modeling or geometry information expression such as converting 2D-written drawings into 3D modeling without taking advantage of the strength of BIM application. To increase the demand for BIM-based MEP design, geometric information, and property information of each member of the 3D model must be conveniently linked from the phase of the Design Development (DD) to the phase of Construction Document (CD). To conveniently implement a detailed model at each phase, the detailed level of each member of the 3D model must be specific, and an automatic generation of objects at each phase and automatic detailing module for each LOD are required. However, South Korea's guidelines have comprehensive standards for the degree of MEP modeling details for each design phase, and the application of each design phase is ambiguous. Furthermore, in practice, detailed levels of each phase are input manually. Therefore, this paper summarized the detailed standards of MEP modeling for each design phase through interviews with MEP design companies and related literature research. In addition, items that enable auto-detailing with DYNAMO were selected using the checklist for each design phase, and the types of detailed methods were presented. Auto-detailing items considering the detailed level of each phase were classified by members. If a DYNAMO algorithm is produced that automates selected auto-detailing items in this paper, the time and costs required for modeling construction will be reduced, and the demand for MEP design will increase.

  • PDF

Structural Relationship Analysis between Tourists' Time Perception, Perceived Satisfaction and Behavioral Intention of Nostalgic Urban Regeneration Tourist Destination (감성적 도시재생관광지 관광자의 시간관과 지각된 만족, 행동의도 간의 구조관계 분석)

  • Lee, Jae-Dal
    • Land and Housing Review
    • /
    • v.13 no.1
    • /
    • pp.23-38
    • /
    • 2022
  • As city tourism has recently been evaluated as a major indicator of urban competitiveness, strengthening the role of cities as tourist destinations has received more attention. However, industrialization and urbanization of many cities lead to population decline, extinction of traditional industries, and deterioration of living environments, weakening urban functions and competitiveness. Thus, it is essential for declining cities to build a measure to restore urban competitiveness by enhancing urban functions. Accordingly, this study focused on socio-cultural urban regeneration by exploring physical spaces for tourism destinations in declining cities. Different from general tourist destinations, tourism destinations of urban regeneration have a temporal perspective covering the past, present, and future. How does the temporal perspective of urban regeneration tourist destinations affect tourists' satisfaction and behavioral intention? In order to address these questions, this study conducts an empirical analysis based on structural equation modeling (SEM) using the sample of tourists who have visited urban regeneration tourism destinations. With SEM, this paper investigates structural relationships across variables by testing the hypothesis established in the proposed research model. The results show that precious memories of the past are the most important factor for tourists to visit urban regeneration tourist destinations. The empirical findings of this study will contribute to the research areas of urban tourism, urban regeneration tourism, and urban regeneration tourism destinations. In addition, this study can provide practical implications to develop socio-cultural contents of urban regeneration areas as tourism resources to establish plans for urban regeneration projects and achieve sustainable development strategies.

Establishment of the Measurement Model about the Adequate Urban Development Density using System Dynamics (시스템다이내믹스를 활용한 도시개발밀도의 적정성 평가 모델 구축 연구)

  • 전유신;문태훈
    • Proceedings of the Korean System Dynamics Society
    • /
    • 2003.08a
    • /
    • pp.1-24
    • /
    • 2003
  • The purpose of this paper was developing a development density control model for urban growth management, using system dynamics modeling. The density control model was developed to see how urban growth, transition, and decay occur depending on the interaction among population, houses, industry structure, land and urban infrastructure such as road, water supply, and sewage treatment facilities. Suggesting adequate level of development density control using the model was another purpose of this paper. The model was applied to An'yang city to estimate the maximum number of population, industry structures, houses, and cars that can be adequately sustained with the current An'yang city's infrastructur capacity. The computer simulation results shows that the city is overpopulated by some 90,000 people. To reduce the population to the adequate level that the current urban infrastructure can sustain, the current city regulation on floor area ratio are needed to be strengthened at least 20 to 35%.

  • PDF

A Study of Appropriate Contributed Acceptance of Urban Infrastructure in Urban Renewal Project - Focused on the Gongpyung Renewal District - (수복형 도시정비사업의 정비기반시설 적정 기부채납에 관한 연구 - 서울시 공평구역 사례를 중심으로 -)

  • Na, In-Su
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.35-41
    • /
    • 2022
  • This research aims to find the issues and explore policy agenda of contributed acceptance of urban renewal project. Through the analysis of urban renewal project in Seoul, three isssues was found as follows. Firstly, the ratio of contributed acceptance in each district was quite different. Secondly, the donated land was scattered around whole project area. Thirdly, infrastructures are not constructed until all renewal projects were implemented. For this issues, this research proposed that a proper standard of the ratio of contributed acceptance is needed and land donation should be designated to adjacent lot or block. Also public support should be for developing urban capacity and completing infrastructure.