• Title/Summary/Keyword: unit process

Search Result 3,677, Processing Time 0.028 seconds

A Combined Process Control Procedure by Monitoring and Repeated Adjustment

  • Park, Changsoon
    • Communications for Statistical Applications and Methods
    • /
    • v.7 no.3
    • /
    • pp.773-788
    • /
    • 2000
  • Statistical process control (SPC) and engineering process control (EPC) are based on different strategies for processes quality improvement. SPC reduces process variability by detecting and eliminating special causes of process variation. while EPC reduces process variability by adjusting compensatory variables to keep the quality variable close to target. Recently there has been needs for a process control proceduce which combines the tow strategies. This paper considers a combined scheme which simultaneously applies SPC and EPC techniques to reduce the variation of a process. The process model under consideration is an integrated moving average(IMA) process with a step shift. The EPC part of the scheme adjusts the process back to target at every fixed monitoring intervals, which is referred to a repeated adjustment scheme. The SPC part of the scheme uses an exponentially weighted moving average(EWMA) of observed deviation from target to detect special causes. A Markov chain model is developed to relate the scheme's expected cost per unit time to the design parameters of he combined control scheme. The expected cost per unit time is composed of off-target cost, adjustment cost, monitoring cost, and false alarm cost.

  • PDF

A Study on the Risk Examination of the Unit Price of Public Housing Construction Projects (공공주택공사에서의 도급단가 리스크 규명에 관한 연구)

  • Kim, Soon-Young;Han, Choong-Hee;Baek, Tae-Ryong;Kim, Kyoon-Tai;Lee, Jun-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.35-44
    • /
    • 2010
  • Currently, the unit price of public construction projects are not being evaluated appropriately for several reasons. First, the evaluation of the unit price differ per nature of the bidding process and its estimation process. In fact, pricing is determined to meet the total price in turnkey projects and to pass the low bid price deliberation process in unit price projects, and thus, such prices cannot be said to be reasonable prices per public project. After the contract is awarded, however, the prices determined without taking into consideration the characteristic of each bidding process and price estimate process are used for the valuation of progress payment, design changes, and escalation. Furthermore, this is also being applied to other low bid deliberation process as actual public project unit price, thereby affecting other processes as well. In effect, this system increases the risks for both the owner and the bidder who have determined the unit price. This research examines the risk factor and its extent in order to properly manage it in preparation for the future.

SIMD Multiply-accumulate Unit Design for Multimedia Data Processing (멀티미디어 처리에 적합한 SIMD 곱셈누적 연산기의 설계)

  • 홍인표;정재원;정우경;이용석
    • Proceedings of the IEEK Conference
    • /
    • 2000.11b
    • /
    • pp.349-352
    • /
    • 2000
  • In this paper, a SIMD 64bit MAC (Multiply -Accumulate) unit is designed. It is composed of two 32bit MAC unit which supports SIMD 16bit operations. As a result, It can process two 32bit MAC operations or four 16bit operations in one cycle. Proposed MAC unit is described in Verilog HDL. After functional verification is performed, MAC unit is synthesized and optimized with 0.35$\mu\textrm{m}$ standard cell library. The synthesis result shows that this MAC unit can operate at 80㎒ of clock frequency in 85$^{\circ}C$, 3.0V, worst case process and 125㎒ of clock frequency at 25$^{\circ}C$, 3.3V, typical case process. It achieves 320Mops of performance, and is suitable for embedded DSP processors.

  • PDF

ASSESSMENT OF ACTIVITY-BASED PYROPROCESS COSTS FOR AN ENGINEERING-SCALE FACILITY IN KOREA

  • KIM, SUNGKI;KO, WONIL;BANG, SUNGSIG
    • Nuclear Engineering and Technology
    • /
    • v.47 no.7
    • /
    • pp.849-858
    • /
    • 2015
  • This study set the pyroprocess facility at an engineering scale as a cost object, and presented the cost consumed during the unit processes of the pyroprocess. For the cost calculation, the activity based costing (ABC) method was used instead of the engineering cost estimation method, which calculates the cost based on the conceptual design of the pyroprocess facility. The calculation results demonstrate that the pyroprocess facility's unit process cost is $194/kgHM for pretreatment, $298/kgHM for electrochemical reduction, $226/kgHM for electrorefining, and $299/kgHM for electrowinning. An analysis demonstrated that the share of each unit process cost among the total pyroprocess cost is as follows: 19% for pretreatment, 29% for electrochemical reduction, 22% for electrorefining, and 30% for electrowinning. The total unit cost of the pyroprocess was calculated at $1,017/kgHM. In the end, electrochemical reduction and the electrowinning process took up most of the cost, and the individual costs for these two processes was found to be similar. This is because significant raw material cost is required for the electrochemical reduction process, which uses platinum as an anode electrode. In addition, significant raw material costs are required, such as for $Li_3PO_4$, which is used a lot during the salt purification process.

Unit Process Analysis for EAF Dust Plant Operation (전기로 분진 처리 조업의 공정 분석)

  • Moon, Seok-Min;Kim, Tai-Dong
    • Resources Recycling
    • /
    • v.23 no.1
    • /
    • pp.80-85
    • /
    • 2014
  • Commercially operating EAF dust recycling processes were investigated by means of unit process analysis. Over 80 % of EAF recycling processes are Waelz kiln process adapted a rotary kiln as a main reactor. There are differences among these pyrometallurgical processes by plant location and timely important things such as environmental regulations. In this paper, the characteristics of each plants are analysed with the point of unit process.

Plasto-plastic Finite Element Analysis for the Parametric Process Design of the Tension Leveller(2) -Full Set Analysis (금속인장교정기의 공정변수 설계를 위한 탄소성 유한요소해석 (2)-전체공정 해석)

  • Lee, H.W.;Huh, H.;Park, S.R.
    • Transactions of Materials Processing
    • /
    • v.11 no.2
    • /
    • pp.147-154
    • /
    • 2002
  • The tension levelling Process is Performed to elongate the strip plastically In combination of tensile and bending strain so that all longitudinal fibers In the strip have an approximately equal amount ofn length and undesirable strip shapes are corrected to the flat shape. Thus paper is concerned with a simulation of the tension levelling process based on the analysis of tile unit model for the tension leveller. Analysis technique such as the sequential analysis of the unit model is suggested and verified with the assembly analysis of the unit model for the effective arts economic analysis of the full set of the tension leveller. Analysis of the full tension levelling Process using sequential unit models Is carried out for steel strips with the shape defect and provides the effect of the intermesh and optimum amount of the intermesh in tension levelling process.

Finite Element Elasto-plastic Analysis of a Full Tension Levelling Process using Sequential Unit Models (순차 단순모델을 이용한 전체 인장교정 공정의 탄소성 유한요소해석)

  • Lee H. W.;Huh H.;Park S. R.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2001.05a
    • /
    • pp.201-204
    • /
    • 2001
  • The tension levelling process is performed to elongate the strip plastically in combination of tensile and bending strain so that all longitudinal fibers in the strip have an approximately equal amount of length and undesirable strip shapes are corrected to the flat shape. This paper is concerned with a simulation of the tension levelling process based on the analysis of the unit model for the tension leveller. Analysis technique such as the sequential analysis of the nit model is suggested and verified with the assembly analysis of the unit model for the effective and economic analysis of the full set of the tension leveller. Analysis of the full tension levelling process using sequential unit models is carried out and provides the effect of the intermesh and optimum amount of the intermesh in tension levelling process.

  • PDF

Nursing Process of Abdominal Surgery Patients (복부수술환자의 간호과정)

  • Yoo, Hyung-Sook
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.8 no.3
    • /
    • pp.411-430
    • /
    • 2002
  • Purpose : This study was to develop Nursing Process Model of abdominal surgery patient using nursing diagnoses of NANDA, Nursing Interventions Classification(NIC), and Nursing Outcomes Classification(NOC). Method : The data in database were collected from nursing records in sixty patients with abdominal surgery admitted in a university hospital and open questionnaires of thirteen nurses. Systematic nursing process resulting from each nursing diagnoses, most common, was developed by the statistical analysis through database query from clinical database of abdominal surgery patients. Result : 51 nursing diagnoses were identified in abdominal surgery patients. The most commonly occurred nursing diagnoses were Pain, Risk for Infection, Sleep Pattern Disturbance, Hyperthermia, Altered Nutrition: Less Than Body Requirements in order. The linkage lists of NANDA to NIC and NANDA to NOC, and the nursing activities according to nursing diagnoses of abdominal surgery patients were identified in unit. Conclusion : Nursing Process of abdominal surgery patients was comprised of core nursing diagnoses, core nursing interventions, core nursing outcomes which provides the most reliable data in unit and could make nurses facilitate nursing process easily without full consideration of knowledge about nursing language classification system. Therefore, it could support nurses' decision making and recording of nursing process especially in the computerized patient record system if unit nursing process model using standardized nursing language system which contains of their own core nursing process data was developed.

  • PDF

Identifying Space Grammar in the Unit Plans of Contemporary Indonesian Houses

  • Ju, Seo Ryeung;Maisarah, Maisarah;Kim, Min Kyoung
    • Architectural research
    • /
    • v.21 no.1
    • /
    • pp.9-20
    • /
    • 2019
  • In the spatial configuration of a unit plan, two rules exist: one that governs the arrangement of spaces, and one that controls the design process of generating a unit plan. This study defines space grammar as an integration of the two rules that give birth to a given spatial configuration and as the process of the generation of unit plans. To understand the distinctive features of Indonesian row houses, this study analyzes the unit plans of row houses in new towns of the metropolitan cities of Indonesia, derives a common space grammar from the unit plans, and interprets the sociocultural background that has produced this space grammar. This study employs Seo's (2007a; 2007b) graph-theoretic methodology to analyze the spatial configurations of unit plans along with a topographical approach to systematically illustrate the design process. The guest space was found as the most unique space of Indonesian houses, which cannot be found in other Southeast Asian houses. Kitchen was clearly seperated from the dining and living spaces, following traditional custom. Dining space was found to serve as a circulation center, connecting the entrance, the lving area and the kitchen. This study locates the basic orders of primary space and the design principles that dictate the unique spatial configurations of Indonesian row houses. This study reveals the basic space grammar that underpins the forms of Indonesian row houses, explaining the sociocultural and geo-climatic factors affecting this space grammar and proposing unique characteristics of Indonesian contemporary houses.

Life Cycle Assessment for the Business Activities of Green Company -1. Analysis of Process Flow and Basic Unit (녹색기업의 사업활동 전 과정에 대한 환경성 평가 -1. 공정 흐름 및 원단위 분석)

  • Shin, Choon-Hwan;Park, Do-Hyun
    • Journal of Environmental Science International
    • /
    • v.22 no.3
    • /
    • pp.269-279
    • /
    • 2013
  • In this paper, an environmental assessment was carried out on the whole process of industrial business activities to establish a basic plan for climate change mitigation and energy independency. The whole process was divided into each discharge process in terms of water, air, solid waste, green house gases and refractory organic compounds. The flowcharts and basic unit of process were analysed for three years (2008-2010), being utilized as basic information for the life cycle assessment. It was found that the unit loading for the whole process significantly depends on changes in the operation rate change and highly concentrated wastewater inflow. About 35% of solid waste production was reduced by improving the incineration method with co-combustion in coal boiler, generating about 57% of electricity used for the whole process, and consequently reducing the energy costs. As the eco-efficiency index was found to be more than 1, compared to the previous years, it can be said that improvement in general has taken place.