• 제목/요약/키워드: unit load system

검색결과 741건 처리시간 0.031초

반 잠수식 복수부선의 진수설계 (Development of float off Operation Design for Mdlti Semi-submersible Barges with Symmetrical Stability Casings)

  • 양영태;최문길;이춘보;박병남;성석부
    • 한국해양공학회지
    • /
    • 제17권2호
    • /
    • pp.72-76
    • /
    • 2003
  • This paper presents the design concept and operation results of float-off for FSO (340,000 DWT Class, ELF AMENAM KPONO Project) built on the ground, without dry dock facilities. It was the first attempt to build FSO, completely, on the ground and launch it using DBU (Double Barge Unit, which was connected by rigid frame structure.) The major characteristics of FSO, which are similar to general VLCC type hull, including topside structure, weigh 51,000 metric ton. In order to have sufficient stability during the deck immersion of DBU, while passing through a minimum water plane area zone, proper trim control was completed with LMC (Load Master Computer). The major features of the monitoring system include calculation for transverse bending moment, shear force, local strength check of each connector, based on component stress, and deformation check during the load-out and float-off. Another major concern during the operation was to avoid damages at the bottom and sides of FSO, due to motion & movement after free-floating; therefore, adequate clearances between DBU and FSO were to be provided, and guide posts were installed to prevent side damage of the DBU casings. This paper also presents various measures that indecate the connector bending moment, damage stability analysis, and mooring of DBU during float off.

분산전원이 설치 된 배전 계통의 분포부하를 이용한 IVVC알고리즘 (Integrated Voltage/Var control based on Distributed Load Modeling with Distributed Generation in Distribution System)

  • 김영인;임일형;최면송;이승재
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.95_96
    • /
    • 2009
  • In this paper, a new algorithm of Integrated Volt/Var Control (IVVC) is proposed using Volt/Var control for the Distribution Automation System (DAS) based on the modeling of the distributed load and the distributed current. In the proposed, the load flow based on the modeling of the distributed load with Distributed Generation and the distributed current are estimated from constants of four terminals using the measurement of the current and power factor from a Feeder Remote Terminal Unit (FRTU). For Integrated Volt/Var Control (IVVC), the gradient method is applied to find optimal solution for tap and capacity control of OLTC (On-Load Tap Changers), SVR (Step Voltage Regulator), and SC (Shunt Condenser). What is more Volt/Var control method is proposed using moving the tie switch as well as IVVC algorithm using power utility control. In the case studies, the estimation and simulation network have been testified in Matlab Simulink.

  • PDF

전륜 조향용 전기식 작동기 피로수명 평가 (Evaluation of Fatigue Life of Electro-Mechanical Actuator for Front Wheel Steering)

  • 김영철;김현기;김동협;김상우
    • 항공우주시스템공학회지
    • /
    • 제17권4호
    • /
    • pp.126-132
    • /
    • 2023
  • 최근 항공분야에서는 온실가스 배출 저감을 위한 친환경 기술이 강조되면서 전기를 주동력원으로 기계적인 직진, 회전 운동을 제어하는 전기식 작동기의 다양한 연구가 진행되고 있다. 본 연구에서는 단일통로 항공기 전륜조향용 전기식 작동기의 피로수명을 평가하였다. 구조해석을 통해 작동기의 취약부위들을 선정하여 이들에 대한 단위하중 응력표를 구축하였고, 각 하중 프로파일에 대한 대표응력을 계산하였다. 또한 낙수계수법으로 대표응력 그룹의 개별 프로파일을 추출하고, 이를 소재의 S-N 선도에 적용하여 개별 프로파일에 대한 손상을 계산하였다. 최종적으로 손상누적법칙으로 취약 부위들에서의 총 손상을 산출하였고, 단일통로 항공기 전륜조향용 전기식 작동기의 취약 부위들에 대한 피로수명을 평가하였다.

소형 가스엔진 열병합발전의 운전거동 예측을 위한 컴퓨터 시뮬레이션 (Computer Simulation to Predict Operating Behavior of a Gas Engine Driven Micro Combined Heat and Power System)

  • 조우진;이관수;김인규
    • 설비공학논문집
    • /
    • 제22권12호
    • /
    • pp.873-880
    • /
    • 2010
  • The present study developed a computer simulation program to determine the optimum strategy and capacity of a micro combined heat and power(CHP) system. This simulation program considered a part-load electrical/thermal efficiency and transient response characteristics of CHP unit. The result obtained from the simulation was compared with the actual operation of 30 kW gas engine driven micro CHP system. It was found that the simulation could reproduce the daily operation behavior, such as operating hours and mean load factor, closely to the actual behavior of the system and could predict the amount of electrical/thermal output and fuel consumption with the error of less than 12%.

신경회로망과 DWT를 이용한 고장표시기의 고장검출 개선에 관한 연구 (A Study for the Improvement of Fault Detection on Fault Indicator using DWT and Neural Network)

  • 홍대승;임화영
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.46-48
    • /
    • 2007
  • This paper presents research about improvement of fault detection algorithm in FRTU on the feeder of distribution system. FRTU(Feeder Remote Terminal Unit) is applied to fault detection schemes for phase fault, ground fault, and cold load pickup and Inrush restraint functions distinguish the fault current and the normal load current. FRTU is occurred FI(Fault Indicator) when current is over pick-up value also inrush current is occurred FRTU indicate FI. Discrete wavelet transform(DWT) analysis gives the frequency and time-scale information. The neural network system as a fault detector was trained to discriminate inrush current from the fault status by a gradient descent method. In this paper, fault detection is improved using voltage monitoring system with DWT and neural network. These data were measured in actual 22.9kV distribution system.

  • PDF

미세 구멍 펀칭 기구 개발 (Development of Micro Punching System)

  • 주병윤;오수익;전병희
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 2001년도 춘계학술대회 논문집
    • /
    • pp.213-216
    • /
    • 2001
  • A micro hole punching system was developed and micro holes of 100m in diameter were successfully made on brass sheets of loom in thickness. A micro punch made of tungsten carbide was designed to withstand the punch load, considering the buckling and the bending moment due to possible misalignment error. The punch was fabricated by the grinding process with diamond wheel. The die was designed considering the punch load and fabricated by micro electrodischarge machining process. In this system the stripper is designed to guide punch tip to minimize the possible misalignment. The punch was installed on a vertical stepper and the die was mounted on an X-Y translation unit. The precision motion controller controlled all motions of the micro hole punching system. In this study technical difficulties and solutions in the micro hole punching process were also discussed.

  • PDF

표준전동차 대차틀 피로강도평가(I) (Fatigue strength evaluation of a bogie frame for standard electric multiple unit(I).)

  • 박기준;이호용;이관섭;김원경
    • 한국철도학회논문집
    • /
    • 제3권3호
    • /
    • pp.170-176
    • /
    • 2000
  • Nowadays, the vehicle structure weight of urban transit system has been reduced in order to save energy and materials. However, this light weighted vehicle structure is very important to verify the fatigue strength at the development stage. Bogie system consists of bogie frame, suspensions, wheel-sets, braking system and transmission system. Among these components, the bogie frame is most significant component subjected to the whole vehicle and passenger loads. In this study, the bogie frame for the standard EMU power car is evaluated to the static and fatigue strength. And, the evaluation method is used the JIS E4207 specification throughout the FEM analysis and static load test. The static and fatigue test results for the standard EMU bogie frame of power car has been appeared very safety and stable for the design load conditions.

  • PDF

Centrifuge modelling of rock-socketed drilled shafts under uplift load

  • Park, Sunji;Kim, Jae-Hyun;Kim, Seok-Jung;Park, Jae-Hyun;Kwak, Ki-Seok;Kim, Dong-Soo
    • Geomechanics and Engineering
    • /
    • 제24권5호
    • /
    • pp.431-441
    • /
    • 2021
  • Rock-socketed drilled shafts are widely used to transfer the heavy loads from the superstructure especially in mountainous area. Extensive research has been done on the behavior of rock-socketed drilled shafts under compressive load. However, little attention has been paid to uplift behavior of drilled shaft in rock, which govern the overall behavior of the foundation system. In this paper, a series of centrifuge tests have been performed to investigate the uplift response of rock-socketed drilled shafts. The pull-out tests of drilled shafts installed in layered rocks having various strengths were conducted. The load-displacement response, axial load distributions in the shaft and the unit skin friction distribution under pull-out loads were investigated. The effects of the strength of rock socket on the initial stiffness, ultimate capacity and mobilization of friction of the foundation, were also examined. The results indicated that characteristics of rock-socket has a significant influence on the uplift behavior of drilled shaft. Most of the applied uplift load were carried by socketed rock when the drilled shaft was installed in the sand over rock layer, whereas substantial load was carried by both upper and lower rock layers when the drilled shaft was completely socketed into layered rock. The pattern of mobilized shaft friction and point where the maximum unit shaft friction occurred were also found to be affected by the socket condition surrounding the drilled shaft.

Design of DC Side Voltage and Compensation Analysis of THD for Shunt Power Quality Controller under System Load of Rectifier with R-L Load

  • Zhao, Guopeng;Han, Minxiao
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권1호
    • /
    • pp.30-40
    • /
    • 2015
  • For a shunt power quality controller (SPQC) the DC side voltage value which is closely related to the compensation performance is a significant parameter. Buy so far, very little discussion has been conducted on this in a quantitative manner by previous publications. In this paper, a method to design the DC side voltage of SPQC is presented according to the compensation performance in the single-phase system and the three-phase system respectively. First, for the reactive current and the harmonic current compensation, a required minimal value of the DC side voltage with a zero total harmonic distortion (THD) of the source current and a unit power factor is obtained for a typical load, through the equivalent circuit analysis and the Fourier Transform analytical expressions. Second, when the DC side voltage of SPQC is lower than the above-obtained minimal value, the quantitative relationship between the DC side voltage and the THD after compensation is also elaborated using the curve diagram. Hardware experimental results verify the design method.

자동창고시스템의 성능평가를 위한 M/G/1 대기모형 (M/G/1 Queueing Model for the Performance Estimation of AS/RS)

  • 임시영;허선;이문환;이영해
    • 대한산업공학회지
    • /
    • 제27권1호
    • /
    • pp.111-117
    • /
    • 2001
  • Most of the techniques for the performance estimation of unit-load AS/RS are a static model or computer simulation. Especially, their models have been developed under the assumption that the Storage/Retrieval (S/R) machine performs either single command(SC) or dual command(DC) only. In reality, depending on the operating policy and the status of the system at a particular time, the S/R machine performs a SC or a DC, or becomes idle. In order to resolve this weak point, we propose a stochastic model for the performance estimation of unit-load ASIRS by using a M/G/1 queueing model with a single server and two queues. Server utilization, expected numbers of waiting storage and retrieval commands and mean time spent in queue and system are found.

  • PDF