Long Chen;Chenlei Xie;Zi Ye;Yonghui Chen;Zhewei Chai;Yun Li
Geomechanics and Engineering
/
제38권1호
/
pp.15-28
/
2024
The rapid development of the economy has compelled the widen of highways, and the main challenge of this undertaking lies in the uneven settlement of road embankments. Through field and numerical experiments, this study explores the deformation mechanism of shallow buried pipelines due to road widening. The utilization of Plaxis3D software, which is adapt at simulating complex engineering geological conditions, enables the simulation of the settlement of both the central and right-side road embankments. Comparing with other numerical software such as ABAQUS and COMSOL, Plaxis provided more constitutive models including HS, HSS and Hoek-Brown model. The work concludes that the uneven settlement of road cross-sections is positively correlated with the horizontal distance from the pipeline, with a maximum settlement of 73 mm observed after construction. Furthermore, based on the Winkler's assumption, theoretical settlement and stress calculation methods are established. Results indicate that the maximum difference between the calculated values of this formula and simulated values is 1.9% and 7%, respectively. Additionally, the study investigates the stress and settlement of the pipeline's top under different angles to understand its behavior under various conditions. It finds that with traffic loads applied to the new embankment, a lever effect occurs on the lower pipeline, with the fulcrum located within the central isolation zone, leading to a transition in curve type from "single peak and single valley" to "double peak and single valley." Moreover, the settlement of pipelines on both sides of the central isolation zone and the normal stress of the pipeline's top section are symmetrical.
In case of uneven surcharge like backfill or embankment after constructing caisson applied on the deep soft marine deposits, lateral deformation of soft soils would happen due to plastic deformation of soil particles by increase of excess pore water pressure. Lateral deformation of soil will result in the caisson displacement which affects soft soil-caisson structure safety. Soft soil was improved by soil compaction pile method, and then gravity caisson was installed. Soil deformations were monitored and analyzed with step by step backfill and embankment behind the caisson. Amount and speed of lateral deformation after the installation of caissons were closely related with the time of backfill and embankment. The relationship between maximum lateral displacement($\Delta_y$) in front of caisson and settlement($\Delta_s$) can be expressed as $\Delta_y=(0.0871)\Delta_s+122.95$. Soft soil depth did not affect the lateral displacement of caisson in this study, which can be explained the soft soil improvement under the caisson by S.C.P. method. Substantially the amount and speed of the lateral deformation of caisson were closely related with the uneven surcharging rate behind caisson.
도시화와 산업화에 따라 도심지에 개발이 늘어나면서 지반침하로 인한 피해가 지속적으로 발생되고 있으며, 도심지에서의 건물붕괴는 대규모 인명 및 재산 피해로 이어질 위험이 크다. 굴착지반에 균등하지 않은 하중이 작용하고, 대상지반의 사전지식이 없는 경우의 지반거동에 대해서는 연구가 거의 이루어지지 않았다. 이에 따라 지반 조사 정보가 없는 흙막이 공사의 굴착 과정에서 발생되는 배면 지반의 침하거동을 분석하는 방법이 기존에는 없었고, 본 연구에서는 시계열 데이터를 가공하여 상대적 침하거동과 상호관련성을 분석하여 흙막이 벽체 배면 지반의 침하거동을 분석하고자 하였다. 본 논문에서는 평균침하량차지수와 평균상대침하량차를 정의 및 계산하였으며, 이를 좌표계에 도시하여 시간경과에 따라 측점간의 상대적 침하거동을 분석하였다. 또한 관측점들의 군집을 분류할 수 있는 기준이 필요하여 k-평균군집분석과 Dunn Index를 이용하여 분류하였다. 분석결과 계측지점의 침하량이 일정한 값으로 수렴하면서 모든 군집들이 안정영역으로 이동한 것을 확인할 수 있었으며, 군집은 세분화되었다. 이러한 분석결과를 바탕으로 연구대상의 각 측점 간 상관관계를 분석하여 연구대상 지반의 독자거동영역과 동일거동영역을 구분할 수 있었다. 이처럼 측점들 간의 상대적 침하거동을 분석을 통해 거동영역을 구분할 수 있다면, 주변지역의 융기, 지반파괴영역 예측, 터파기 공사 시 활동파괴의 방지 등 침하관리와 안정관리에 도움을 줄 수 있다고 판단된다.
Journal of Advanced Marine Engineering and Technology
/
제32권2호
/
pp.359-364
/
2008
Using multi beam echo sounder, side scan sonar and scuba diving equipment, ceramic type, uneven type and semicircle-ramus type reefs into sandy bottom were ascertained, the depth of submersion in 7.2-10.3m on the coast of Gangneung, East of Korea, forty uneven type artificial reefs(AR) were totally buried into the sandy bottom. Two of five semicircle-ramus type ARs had only of their top area exposed. For most of the 45 ceramic reefs, only the upper 25-150cm of ARs were visible. The burial pattern is different in west and east side of the reefs, where the east side is deeply buried compared to the west side. From these results. it is recommended that sufficient analysis of bottom structure and materials especially in the sandy sea area should be undertaken in order to determine the best type of artificial reefs to be deployed and the best location for depoloyment.
Dams are inevitably planned to be built on thick overburden with high permeability and deformability. The connection part between concrete cut-off wall in overburden and earth core in dam body is not only a key part of the anti-seepage system, but also a weak position. Large uneven settlement will be aroused at the concoction part. However, the interaction behavior and the scope of the connection part cannot be determined effectively. In this paper, numerical analysis of a high earth core dam built on thick overburden was carried out with large deformation FE method. The mechanical behavior of the connection part was detail studied. It can be drawn that there is little differences in dam integral deformation for different analysis method, but big differences were found at the connection part. The large deformation analysis method can reasonably describe the process that concrete wall penetrates into soil. The high plasticity clay has stronger ability to adapt to large uneven deformation which can reduce stress level, and stress state of concrete wall is also improved. The scope of high plasticity clay zone in the connection part can be determined according to stress level of soils and penetration depth of concrete wall.
건설 현장에서 항타기 전도 사고는 빈도는 낮으나 발생 시 심각한 피해를 야기한다. 항타기 전도 사고의 주원인은 침하에 의한 모멘트 발생임에도 불구하고 KOSHA-C-101-2014, KOSH-A-GUIDE-71-2012, 산업안전보건 기준, NCS 등의 규정에서 철판 사용에 대한 선언적 내용만 있을 뿐 구체적인 요구조건이 명시되어 있지 않다. 이에 항타기 자중, 지반조건에 따라 하부 철판의 제원이 바뀌어야 하지만 현장에서는 임의로 사용되고 있다. 본 연구에서는 수치 해석(Plaxis 2D)을 기반으로 요구되는 최소 철판 두께를 분석 하였다. 토양의 종류(모래, 점토), 하중 분포, 철판 두께(10mm, 20mm, 30mm, 40mm)에 따라 침하 정도와 및 지반 항복 유무를 산출하였으며, 그 결과 모든 조건에서 두께 10mm 철판은 지반 항복을 유발하였다. 두께 20mm부터는 지반 침하로 발생하는 회전각이 허용치인 2° 이내로 분석되었다.
본 논문의 목적은 부등침하를 받는 회전 쉘의 최대 응답과 표준편차와의 관계를 규명하는 것이다. 이를 위해 표준편차에 대한 최대응답의 비(.eta.)및 그 개략값(.eta./sub apr/)를 통계적 수법으로 조사하였다. 또한 탁월차수(predoninant harmonic number)의 함수로 표현되는 .eta./sub apr/을 구하기 위한 식을 제안하였다. 한편 침하는 Fourier급수로 표시하였다. 이때 각 항은 2개의 계수를 포함하게 되는데 하나는 진폭 스펙트럼이고 다른 하나는 위상각이다. 여기서는 위상각은 확률변수로, 진폭은 확정값으로 가정하였다. 해석에서는 .eta., .eta./sub apr/의 특성을 조사하기 위해 2가지 type의 진폭 스펙트럼을 실측데이터를 근거로 설정한 후, 각 type에 대해 100 sample씩의 위상각을 가정하여 사용하였다. .eta.,.eta./sub apr/은 응답의 종류, 쉘의 위치 그리고 진폭 스텍트럼의 type에 상관없이 거의 일정한 값으로 분포하며 그 값은 2.0에서 2.5사이의 값이 된다. 또한 .eta./sub apr/의 값은 .eta.의 값과 거의 비슷하지만 약간 큰 값으로 나타났다. 결론으로 부등침하를 받는 회전 쉘의 최대 응답은 표준편차의 .eta./sub apr/(약 2.5)배 임을 밝히고 있다.
An approach section on an abutment is located between the soil embankment and the structure, which may cause an uneven surface due to different settlement between the abutment and the soil embankment. This study proposes a new type of wall which separates the abutment from the backfill material using mechanically stabilized wall. A new type of keystone which incorporates geotube and wire mesh is proposed and evaluated. Numerical analyses were performed to investigate the applicability of the proposed keystone type, which incorporates Geosynthetic. The maximum horizontal displacements along GRS wall faces, settlements at the top of pavement and track bed, and tensile forces applied on geotextiles under traffic loads were investigated. The results of the numerical analysis showed that the proposed wall can be used for highway and high-speed railway abutment.
연약지반 공사는 설계단계에서 고려하지 못한 변수들이 시공단계에서 발생되어 구조물의 안정성과 설계변경에 따른 공사비 증가의 원인이 된다. 본 연구는 충청북도 오창지역에 조성되는 산업단지 진입도로 조성구간을 연구대상으로 하며, 연약지반 처리공법으로 암버럭을 이용한 치환공법 및 사용하중을 고려한 과재성토를 연약지반 처리대책으로 선정, 구조물의 안정성 및 공기 단축으로 공사비 절감효과 분석에 목적이 있다. 연구구간의 연약지반 두께는 사질토 및 점성토 연약지반으로 2.4~5.5m로 규모가 작으나 지표하 1.5~5.9m의 지층사이에 불균등하게 분포하며, 침하발생은 크지 않으나 장래 부등침하와 단차 발생이 예상되어 연약지반 처리후 현장 계측결과를 분석하여 장래 침하거동을 예측하였다. 또한, 치환재료는 지역특성 및 경제성을 고려하여 양질토사를 암버럭으로 치환하여 안정성 증가, 공기단축 등으로 공사비 29%를 절감하였다. 본 연구를 바탕으로 향후 제체내 간극수압 소산, 지하수위 변동 등의 예측과 실제 계측된 연약지반의 압밀과의 관계 등에 대한 추가적인 연구를 수행할 경우, 다양한 현장조건에서 연약지반 거동을 정확히 예측할 수 있을 것으로 기대된다.
The speed of rail vehicles become higher and higher over two decades, and China has unveiled a prototype high-speed train in October 2020 that has been able to reach 400 km/h. At such high speeds, wheel-rail force items that had previously been ignored in common computational model should be reevaluated and reconsidered. Aiming at this problem, a new model for investigating the vehicle-bridge interaction at high moving speed is proposed. Comparing with the common model, the new model was more accurate and applicable, because it additionally considers the second-order pseudo-inertia forces effect and its modeling equilibrium position was based on the initial deformed curve of bridge, which could include the influences of temperature, pre-camber, shrinkage and creep deformation, and pier uneven settlement, etc. Taking 5 km/h as the speed interval, the dynamic responses of the classical vehicle-bridge system in the speed range of 5 km/h to 400 km/h are studied. The results show that ignoring the second-order pseudo-inertia force will underestimate the dynamic response of vehicle-bridge system and make the high-speed railway bridge structure design unsafe.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.