• 제목/요약/키워드: uneven settlement

검색결과 15건 처리시간 0.026초

대심도 연약지반상에 건설되는 케이슨의 측방변형 사례 연구 (Case Study for Lateral Displacement of Caisson installed on Deep Soft Soils)

  • 김명학;윤민승;이상욱;이채건;한병원
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.940-950
    • /
    • 2010
  • In case of uneven surcharge like backfill or embankment after constructing caisson applied on the deep soft marine deposits, lateral deformation of soft soils would happen due to plastic deformation of soil particles by increase of excess pore water pressure. Lateral deformation of soil will result in the caisson displacement which affects soft soil-caisson structure safety. Soft soil was improved by soil compaction pile method, and then gravity caisson was installed. Soil deformations were monitored and analyzed with step by step backfill and embankment behind the caisson. Amount and speed of lateral deformation after the installation of caissons were closely related with the time of backfill and embankment. The relationship between maximum lateral displacement($\Delta_y$) in front of caisson and settlement($\Delta_s$) can be expressed as $\Delta_y=(0.0871)\Delta_s+122.95$. Soft soil depth did not affect the lateral displacement of caisson in this study, which can be explained the soft soil improvement under the caisson by S.C.P. method. Substantially the amount and speed of the lateral deformation of caisson were closely related with the uneven surcharging rate behind caisson.

  • PDF

군집분류를 이용한 흙막이 벽체 배면 지반의 상대적 침하거동 분석 (Analysis of Relative Settlement Behavior of Retaining Wall Backside Ground Using Clustering)

  • 곽영준;한희수
    • 지질공학
    • /
    • 제33권1호
    • /
    • pp.189-200
    • /
    • 2023
  • 도시화와 산업화에 따라 도심지에 개발이 늘어나면서 지반침하로 인한 피해가 지속적으로 발생되고 있으며, 도심지에서의 건물붕괴는 대규모 인명 및 재산 피해로 이어질 위험이 크다. 굴착지반에 균등하지 않은 하중이 작용하고, 대상지반의 사전지식이 없는 경우의 지반거동에 대해서는 연구가 거의 이루어지지 않았다. 이에 따라 지반 조사 정보가 없는 흙막이 공사의 굴착 과정에서 발생되는 배면 지반의 침하거동을 분석하는 방법이 기존에는 없었고, 본 연구에서는 시계열 데이터를 가공하여 상대적 침하거동과 상호관련성을 분석하여 흙막이 벽체 배면 지반의 침하거동을 분석하고자 하였다. 본 논문에서는 평균침하량차지수와 평균상대침하량차를 정의 및 계산하였으며, 이를 좌표계에 도시하여 시간경과에 따라 측점간의 상대적 침하거동을 분석하였다. 또한 관측점들의 군집을 분류할 수 있는 기준이 필요하여 k-평균군집분석과 Dunn Index를 이용하여 분류하였다. 분석결과 계측지점의 침하량이 일정한 값으로 수렴하면서 모든 군집들이 안정영역으로 이동한 것을 확인할 수 있었으며, 군집은 세분화되었다. 이러한 분석결과를 바탕으로 연구대상의 각 측점 간 상관관계를 분석하여 연구대상 지반의 독자거동영역과 동일거동영역을 구분할 수 있었다. 이처럼 측점들 간의 상대적 침하거동을 분석을 통해 거동영역을 구분할 수 있다면, 주변지역의 융기, 지반파괴영역 예측, 터파기 공사 시 활동파괴의 방지 등 침하관리와 안정관리에 도움을 줄 수 있다고 판단된다.

동해안 사질지반에 시설된 인공어초 3종의 매몰 특성 (Settlement Characteristics of Three Type of Artificial Reefs on Sandy Bottom in the Eastern Coast of Korea)

  • 김대권;김완기;손용수;윤장택;공용근;김영대;이지현
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제32권2호
    • /
    • pp.359-364
    • /
    • 2008
  • Using multi beam echo sounder, side scan sonar and scuba diving equipment, ceramic type, uneven type and semicircle-ramus type reefs into sandy bottom were ascertained, the depth of submersion in 7.2-10.3m on the coast of Gangneung, East of Korea, forty uneven type artificial reefs(AR) were totally buried into the sandy bottom. Two of five semicircle-ramus type ARs had only of their top area exposed. For most of the 45 ceramic reefs, only the upper 25-150cm of ARs were visible. The burial pattern is different in west and east side of the reefs, where the east side is deeply buried compared to the west side. From these results. it is recommended that sufficient analysis of bottom structure and materials especially in the sandy sea area should be undertaken in order to determine the best type of artificial reefs to be deployed and the best location for depoloyment.

Large deformation performance of the anti-seepage system connection part in earth core dam built on thick overburden

  • Yu, Xiang;Wang, Gan;Wang, Yuke;Du, Xueming;Qu, Yongqian
    • Geomechanics and Engineering
    • /
    • 제29권6호
    • /
    • pp.683-696
    • /
    • 2022
  • Dams are inevitably planned to be built on thick overburden with high permeability and deformability. The connection part between concrete cut-off wall in overburden and earth core in dam body is not only a key part of the anti-seepage system, but also a weak position. Large uneven settlement will be aroused at the concoction part. However, the interaction behavior and the scope of the connection part cannot be determined effectively. In this paper, numerical analysis of a high earth core dam built on thick overburden was carried out with large deformation FE method. The mechanical behavior of the connection part was detail studied. It can be drawn that there is little differences in dam integral deformation for different analysis method, but big differences were found at the connection part. The large deformation analysis method can reasonably describe the process that concrete wall penetrates into soil. The high plasticity clay has stronger ability to adapt to large uneven deformation which can reduce stress level, and stress state of concrete wall is also improved. The scope of high plasticity clay zone in the connection part can be determined according to stress level of soils and penetration depth of concrete wall.

항타기 전도예방을 위한 임시 철판의 두께에 관한 연구 (Minimum Thickness of Temporary Steel Plate to Prevent Pile Driver Overturning)

  • 방대평;박종일;기정훈
    • 한국지반환경공학회 논문집
    • /
    • 제21권11호
    • /
    • pp.5-10
    • /
    • 2020
  • 건설 현장에서 항타기 전도 사고는 빈도는 낮으나 발생 시 심각한 피해를 야기한다. 항타기 전도 사고의 주원인은 침하에 의한 모멘트 발생임에도 불구하고 KOSHA-C-101-2014, KOSH-A-GUIDE-71-2012, 산업안전보건 기준, NCS 등의 규정에서 철판 사용에 대한 선언적 내용만 있을 뿐 구체적인 요구조건이 명시되어 있지 않다. 이에 항타기 자중, 지반조건에 따라 하부 철판의 제원이 바뀌어야 하지만 현장에서는 임의로 사용되고 있다. 본 연구에서는 수치 해석(Plaxis 2D)을 기반으로 요구되는 최소 철판 두께를 분석 하였다. 토양의 종류(모래, 점토), 하중 분포, 철판 두께(10mm, 20mm, 30mm, 40mm)에 따라 침하 정도와 및 지반 항복 유무를 산출하였으며, 그 결과 모든 조건에서 두께 10mm 철판은 지반 항복을 유발하였다. 두께 20mm부터는 지반 침하로 발생하는 회전각이 허용치인 2° 이내로 분석되었다.

부등침하를 받는 회전 쉘의 최대응답 추정에 관한 연구 (A Study on Maximum Responses of Rotational Shells Subjected to Uneven Settlements by Stochastic Method)

  • 정명채
    • 전산구조공학
    • /
    • 제10권3호
    • /
    • pp.175-184
    • /
    • 1997
  • 본 논문의 목적은 부등침하를 받는 회전 쉘의 최대 응답과 표준편차와의 관계를 규명하는 것이다. 이를 위해 표준편차에 대한 최대응답의 비(.eta.)및 그 개략값(.eta./sub apr/)를 통계적 수법으로 조사하였다. 또한 탁월차수(predoninant harmonic number)의 함수로 표현되는 .eta./sub apr/을 구하기 위한 식을 제안하였다. 한편 침하는 Fourier급수로 표시하였다. 이때 각 항은 2개의 계수를 포함하게 되는데 하나는 진폭 스펙트럼이고 다른 하나는 위상각이다. 여기서는 위상각은 확률변수로, 진폭은 확정값으로 가정하였다. 해석에서는 .eta., .eta./sub apr/의 특성을 조사하기 위해 2가지 type의 진폭 스펙트럼을 실측데이터를 근거로 설정한 후, 각 type에 대해 100 sample씩의 위상각을 가정하여 사용하였다. .eta.,.eta./sub apr/은 응답의 종류, 쉘의 위치 그리고 진폭 스텍트럼의 type에 상관없이 거의 일정한 값으로 분포하며 그 값은 2.0에서 2.5사이의 값이 된다. 또한 .eta./sub apr/의 값은 .eta.의 값과 거의 비슷하지만 약간 큰 값으로 나타났다. 결론으로 부등침하를 받는 회전 쉘의 최대 응답은 표준편차의 .eta./sub apr/(약 2.5)배 임을 밝히고 있다.

  • PDF

Assessment of Stability of Railway Abutment Using Geosynthetics

  • Kim, Ja-Yeon;Kim, Ji-Hwan;Cho, Kook-Hwan
    • International Journal of Railway
    • /
    • 제9권1호
    • /
    • pp.15-20
    • /
    • 2016
  • An approach section on an abutment is located between the soil embankment and the structure, which may cause an uneven surface due to different settlement between the abutment and the soil embankment. This study proposes a new type of wall which separates the abutment from the backfill material using mechanically stabilized wall. A new type of keystone which incorporates geotube and wire mesh is proposed and evaluated. Numerical analyses were performed to investigate the applicability of the proposed keystone type, which incorporates Geosynthetic. The maximum horizontal displacements along GRS wall faces, settlements at the top of pavement and track bed, and tensile forces applied on geotextiles under traffic loads were investigated. The results of the numerical analysis showed that the proposed wall can be used for highway and high-speed railway abutment.

연약지반 암버럭 치환공법의 구조물 안정성과 경제성 분석 - 청주시 미호천 횡단도로를 대상으로 (Analysis on the Safety of Structure and Economics of Replacement Method Using Rock Debris in the Soft Ground - Case Study of Miho Stream Crossing Road in Cheongju City)

  • 허강국;박형근;안병철;민병욱
    • 대한토목학회논문집
    • /
    • 제36권4호
    • /
    • pp.705-713
    • /
    • 2016
  • 연약지반 공사는 설계단계에서 고려하지 못한 변수들이 시공단계에서 발생되어 구조물의 안정성과 설계변경에 따른 공사비 증가의 원인이 된다. 본 연구는 충청북도 오창지역에 조성되는 산업단지 진입도로 조성구간을 연구대상으로 하며, 연약지반 처리공법으로 암버럭을 이용한 치환공법 및 사용하중을 고려한 과재성토를 연약지반 처리대책으로 선정, 구조물의 안정성 및 공기 단축으로 공사비 절감효과 분석에 목적이 있다. 연구구간의 연약지반 두께는 사질토 및 점성토 연약지반으로 2.4~5.5m로 규모가 작으나 지표하 1.5~5.9m의 지층사이에 불균등하게 분포하며, 침하발생은 크지 않으나 장래 부등침하와 단차 발생이 예상되어 연약지반 처리후 현장 계측결과를 분석하여 장래 침하거동을 예측하였다. 또한, 치환재료는 지역특성 및 경제성을 고려하여 양질토사를 암버럭으로 치환하여 안정성 증가, 공기단축 등으로 공사비 29%를 절감하였다. 본 연구를 바탕으로 향후 제체내 간극수압 소산, 지하수위 변동 등의 예측과 실제 계측된 연약지반의 압밀과의 관계 등에 대한 추가적인 연구를 수행할 경우, 다양한 현장조건에서 연약지반 거동을 정확히 예측할 수 있을 것으로 기대된다.

A model for investigating vehicle-bridge interaction under high moving speed

  • Liu, Hanyun;Yu, Zhiwu;Guo, Wei;Han, Yan
    • Structural Engineering and Mechanics
    • /
    • 제77권5호
    • /
    • pp.627-635
    • /
    • 2021
  • The speed of rail vehicles become higher and higher over two decades, and China has unveiled a prototype high-speed train in October 2020 that has been able to reach 400 km/h. At such high speeds, wheel-rail force items that had previously been ignored in common computational model should be reevaluated and reconsidered. Aiming at this problem, a new model for investigating the vehicle-bridge interaction at high moving speed is proposed. Comparing with the common model, the new model was more accurate and applicable, because it additionally considers the second-order pseudo-inertia forces effect and its modeling equilibrium position was based on the initial deformed curve of bridge, which could include the influences of temperature, pre-camber, shrinkage and creep deformation, and pier uneven settlement, etc. Taking 5 km/h as the speed interval, the dynamic responses of the classical vehicle-bridge system in the speed range of 5 km/h to 400 km/h are studied. The results show that ignoring the second-order pseudo-inertia force will underestimate the dynamic response of vehicle-bridge system and make the high-speed railway bridge structure design unsafe.

FTA(자유무역협정)에서 투자자 대 국가간 분쟁해결을 위한 국제중재제도 (The International Arbitration System for the Settlement of Investor-State Disputes in the FTA)

  • 이강빈
    • 무역상무연구
    • /
    • 제38권
    • /
    • pp.181-226
    • /
    • 2008
  • The purpose of this paper is to describe the settling procedures of the investor-state disputes in the FTA Investment Chapter, and to research on the international arbitration system for the settlement of the investor-state disputes under the ICSID Convention and UNCITRAL Arbitration Rules. The UNCTAD reports that the cumulative number of arbitration cases for the investor-state dispute settlement is 290 cases by March 2008. 182 cases of them have been brought before the ICSID, and 80 cases of them have been submitted under the UNCITRAL Arbitration Rules. The ICSID reports that the cumulative 263 cases of investor-state dispute settlement have been brought before the ICSID by March 2008. 136 cases of them have been concluded, but 127 cases of them have been pending up to now. The Chapter 11 Section B of the Korea-U.S. FTA provides for the Investor_State Dispute Settlement. Under the provisions of Section B, the claimant may submit to arbitration a claim that the respondent has breached and obligation under Section A, an investment authorization or an investment agreement and that the claimant has incurred loss or damage by reason of that breach. Provided that six months have elapsed since the events giving rise to the claim, a claimant may submit a claim referred to under the ICSID Convention and the ICSID Rules of Procedure for Arbitration Proceedings; under the ICSID Additional Facility Rules; or under the UNCITRAL Arbitration Rules. The ICSID Convention provides for the jurisdiction of the ICSID(Chapter 2), arbitration(Chapter 3), and replacement and disqualification of arbitrators(Chapter 5) as follows. The jurisdiction of the ICSID shall extend to any legal dispute arising directly out of an investment, between a Contracting State and a national of another Contracting State, which the parties to the dispute consent in writing to submit to the ICSID. Any Contracting State or any national of a Contracting State wishing to institute arbitration proceedings shall address a request to that effect in writing to the Secretary General who shall send a copy of the request to the other party. The tribunal shall consist of a sole arbitrator or any uneven number of arbitrators appointed as the parties shall agree. The tribunal shall be the judge of its own competence. The tribunal shall decide a dispute in accordance with such rules of law as may be agreed by the parties. Any arbitration proceeding shall be conducted in accordance with the provisions of the Convention Section 3 and in accordance with the Arbitration Rules in effect on the date on which the parties consented to arbitration. The award of the tribunal shall be in writing and shall be signed by members of the tribunal who voted for it. The award shall deal with every question submitted to the tribunal, and shall state the reason upon which it is based. Either party may request annulment of the award by an application in writing addressed to the Secretary General on one or more of the grounds under Article 52 of the ICSID Convention. The award shall be binding on the parties and shall not be subject to any appeal or to any other remedy except those provided for in this Convention. Each Contracting State shall recognize an award rendered pursuant to this convention as binding and enforce the pecuniary obligations imposed by that award within its territories as if it were a final judgment of a court in that State. In conclusion, there may be some issues on the international arbitration for the settlement of the investor-state disputes: for example, abuse of litigation, lack of an appeals process, and problem of transparency. Therefore, there have been active discussions to address such issues by the ICSID and UNCITRAL up to now.

  • PDF