• Title/Summary/Keyword: uneven settlement

Search Result 15, Processing Time 0.028 seconds

Case Study for Lateral Displacement of Caisson installed on Deep Soft Soils (대심도 연약지반상에 건설되는 케이슨의 측방변형 사례 연구)

  • Kim, Myung-Hak;Yoon, Min-Seung;Lee, Sang-Wook;Lee, Chea-Kyun;Han, Byoung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.940-950
    • /
    • 2010
  • In case of uneven surcharge like backfill or embankment after constructing caisson applied on the deep soft marine deposits, lateral deformation of soft soils would happen due to plastic deformation of soil particles by increase of excess pore water pressure. Lateral deformation of soil will result in the caisson displacement which affects soft soil-caisson structure safety. Soft soil was improved by soil compaction pile method, and then gravity caisson was installed. Soil deformations were monitored and analyzed with step by step backfill and embankment behind the caisson. Amount and speed of lateral deformation after the installation of caissons were closely related with the time of backfill and embankment. The relationship between maximum lateral displacement($\Delta_y$) in front of caisson and settlement($\Delta_s$) can be expressed as $\Delta_y=(0.0871)\Delta_s+122.95$. Soft soil depth did not affect the lateral displacement of caisson in this study, which can be explained the soft soil improvement under the caisson by S.C.P. method. Substantially the amount and speed of the lateral deformation of caisson were closely related with the uneven surcharging rate behind caisson.

  • PDF

Analysis of Relative Settlement Behavior of Retaining Wall Backside Ground Using Clustering (군집분류를 이용한 흙막이 벽체 배면 지반의 상대적 침하거동 분석)

  • Young-Jun Kwack;Heui-Soo Han
    • The Journal of Engineering Geology
    • /
    • v.33 no.1
    • /
    • pp.189-200
    • /
    • 2023
  • As urbanization and industrialization increase development in downtown areas, damage due to ground settlement continues to occur. Building collapse in urban has a high risk of leading to large-scale damage to life and property. However, there has rarely been studied on measurement data analysis methods when uneven loads are applied to the excavated ground and no prior knowledge of the ground. Accordingly, it was attempted to analyze the relative settlement behavior and correlation by processing the time-series surface settlement of construction sites in the urban. In this paper, the average index of difference in settlement and average of relative difference in settlement are defined and calculated, then plotted in the coordinate system to analyze the relative settlement behavior over time. In addition, since there was no prior knowledge of the ground, a standard to classify the clusters was needed, and the observation points were classified into using k-means clustering and Dunn Index. As a result of the analysis, it was confirmed that all the clusters moved to the stable region as the settlement amount converges. The clusters were segmented. Based on the analysis results, it was possible to distinguish between the independent displacement area and same behavior area by analyzing the correlation between measurement points. If possible to analyze the relative settlement behavior between the stations and classify the behavior areas, it can be helpful in settlement and stability management, such as uplift of the surrounding area, prediction of ground failure area, and prevention of activity failure.

Settlement Characteristics of Three Type of Artificial Reefs on Sandy Bottom in the Eastern Coast of Korea (동해안 사질지반에 시설된 인공어초 3종의 매몰 특성)

  • Kim, Dae-Kweon;Kim, Wan-Ki;Son, Yong-Soo;Yoon, Jang-Tack;Gong, Yong-Gun;Kim, Young-Dae;Lee, Ji-Hyun
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.32 no.2
    • /
    • pp.359-364
    • /
    • 2008
  • Using multi beam echo sounder, side scan sonar and scuba diving equipment, ceramic type, uneven type and semicircle-ramus type reefs into sandy bottom were ascertained, the depth of submersion in 7.2-10.3m on the coast of Gangneung, East of Korea, forty uneven type artificial reefs(AR) were totally buried into the sandy bottom. Two of five semicircle-ramus type ARs had only of their top area exposed. For most of the 45 ceramic reefs, only the upper 25-150cm of ARs were visible. The burial pattern is different in west and east side of the reefs, where the east side is deeply buried compared to the west side. From these results. it is recommended that sufficient analysis of bottom structure and materials especially in the sandy sea area should be undertaken in order to determine the best type of artificial reefs to be deployed and the best location for depoloyment.

Large deformation performance of the anti-seepage system connection part in earth core dam built on thick overburden

  • Yu, Xiang;Wang, Gan;Wang, Yuke;Du, Xueming;Qu, Yongqian
    • Geomechanics and Engineering
    • /
    • v.29 no.6
    • /
    • pp.683-696
    • /
    • 2022
  • Dams are inevitably planned to be built on thick overburden with high permeability and deformability. The connection part between concrete cut-off wall in overburden and earth core in dam body is not only a key part of the anti-seepage system, but also a weak position. Large uneven settlement will be aroused at the concoction part. However, the interaction behavior and the scope of the connection part cannot be determined effectively. In this paper, numerical analysis of a high earth core dam built on thick overburden was carried out with large deformation FE method. The mechanical behavior of the connection part was detail studied. It can be drawn that there is little differences in dam integral deformation for different analysis method, but big differences were found at the connection part. The large deformation analysis method can reasonably describe the process that concrete wall penetrates into soil. The high plasticity clay has stronger ability to adapt to large uneven deformation which can reduce stress level, and stress state of concrete wall is also improved. The scope of high plasticity clay zone in the connection part can be determined according to stress level of soils and penetration depth of concrete wall.

Minimum Thickness of Temporary Steel Plate to Prevent Pile Driver Overturning (항타기 전도예방을 위한 임시 철판의 두께에 관한 연구)

  • Bang, Daepyung;Park, Jongyil;Kee, Junghun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.11
    • /
    • pp.5-10
    • /
    • 2020
  • Although pile driver overturning accidents at construction site are not frequent, most leads to serious disasters. The main cause of accidents is uneven settlement of the ground. To prevent this, related guidelines such as KOSHA-C-101-2014, KOSH-A-GUIDE-71-2012, Occupational Safety and Health Standards, and NCS stipulate the installation of steel plates over ground. However, since the required steel plate thickness considering the self-weight of pile drivers and the underlying ground condition is not quantitatively presented, it is randomly applied in the field. In this study, the required minimum steel plate thickness was analyzed based on a numerical analysis (Plaxis 2D). Settlements and soil failure were calculated according to the different type of soils (sand, clay), load distribution and steel plate thickness (10mm, 20mm, 30mm, 40mm). Under all conditions, 10mm steel plate causes soil collapse. From thickness 20mm, the ground uneven subsidence is within 2° of the allowable leader angle.

A Study on Maximum Responses of Rotational Shells Subjected to Uneven Settlements by Stochastic Method (부등침하를 받는 회전 쉘의 최대응답 추정에 관한 연구)

  • 정명채
    • Computational Structural Engineering
    • /
    • v.10 no.3
    • /
    • pp.175-184
    • /
    • 1997
  • The objective of this paper is to study arelationship between maximum response and its standard deviation of rotational shells that are subjected to uneven settlements. For this, the ratio, .eta, of the maximum response to standard deviation and it's approximate, .eta./sub apr/, are investigated by stochastic methods. Also, an equation for .eta./sub apr/, that is a function of predominant harmonic number is suggested. The settlements are represented by the Fourier series. Each term in the series contains two coefficients; the amplitude and the phase angle. It is assumed that phase angles are random variables and amplitudes are deterministic. To investigate the characteristics of .eta. and .eta./sub apr/, 100 phase angles for two types of artificial amplitudes spectra are used in the analysis. .eta. and .eta./sub apr/, are almost constant regardless of amplitude type, position of a shell or type of responses; they fall into from 2.0 to 2.5. .eta./sub apr/ is always close to .eta., but tends to be somewhat greater. It may be concluded that a maximum responses of rotational shells subjected to uneven settlements are .eta./sub apr/ (about 2.5) times of its standard deviation. It is considered that this result is used when we design rotational shell structures subjected to differential settlements.

  • PDF

Assessment of Stability of Railway Abutment Using Geosynthetics

  • Kim, Ja-Yeon;Kim, Ji-Hwan;Cho, Kook-Hwan
    • International Journal of Railway
    • /
    • v.9 no.1
    • /
    • pp.15-20
    • /
    • 2016
  • An approach section on an abutment is located between the soil embankment and the structure, which may cause an uneven surface due to different settlement between the abutment and the soil embankment. This study proposes a new type of wall which separates the abutment from the backfill material using mechanically stabilized wall. A new type of keystone which incorporates geotube and wire mesh is proposed and evaluated. Numerical analyses were performed to investigate the applicability of the proposed keystone type, which incorporates Geosynthetic. The maximum horizontal displacements along GRS wall faces, settlements at the top of pavement and track bed, and tensile forces applied on geotextiles under traffic loads were investigated. The results of the numerical analysis showed that the proposed wall can be used for highway and high-speed railway abutment.

Analysis on the Safety of Structure and Economics of Replacement Method Using Rock Debris in the Soft Ground - Case Study of Miho Stream Crossing Road in Cheongju City (연약지반 암버럭 치환공법의 구조물 안정성과 경제성 분석 - 청주시 미호천 횡단도로를 대상으로)

  • Heo, Kang Kug;Park, Hyung Keun;Ahn, Byung Chul;Min, Byeong Uk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.705-713
    • /
    • 2016
  • For the soft ground construction, the factors not considered in the design stage occurs in the construction stage so that they cause the increase of the construction cost due to the structural stability and the design change. The subject of the study is the construction section of the industrial complex access road made in the Ochang region of Chungcheongbuk-do. The study is concerned with selecting the soft ground handling method such as the replacement method using rock debris and the surcharge reflecting the service load as the soft ground handling measure and analyzing the effect of reducing the construction cost with the stability of structures and the reduction of the construction period. The soft ground in the study section consists of sandy and cohesive soil and is 2.4m to 5.5m deep. It is distributed unevenly between the 1.5m to 5.9m stratums under the ground surface. Settlement is not serious, but the future uneven settlement and difference are expected so that the future settlement behavior is estimated by analyzing the site measurement results after the soft ground treatment. Moreover, in consideration of the regional characteristics and economic efficiency, soil with good quality is replaced with rock debris as the replacement material so that 29% of the construction cost is reduced due to the increase of stability and the reduction of duration. If the estimation of the dispersion of the pore water pressure within the dam body and the change of the underground water level and the relation of the actually measured soft ground with consolidation is studied further on the basis of the study, it is expected that the behavior of the soft ground will be correctly estimated in various site conditions.

A model for investigating vehicle-bridge interaction under high moving speed

  • Liu, Hanyun;Yu, Zhiwu;Guo, Wei;Han, Yan
    • Structural Engineering and Mechanics
    • /
    • v.77 no.5
    • /
    • pp.627-635
    • /
    • 2021
  • The speed of rail vehicles become higher and higher over two decades, and China has unveiled a prototype high-speed train in October 2020 that has been able to reach 400 km/h. At such high speeds, wheel-rail force items that had previously been ignored in common computational model should be reevaluated and reconsidered. Aiming at this problem, a new model for investigating the vehicle-bridge interaction at high moving speed is proposed. Comparing with the common model, the new model was more accurate and applicable, because it additionally considers the second-order pseudo-inertia forces effect and its modeling equilibrium position was based on the initial deformed curve of bridge, which could include the influences of temperature, pre-camber, shrinkage and creep deformation, and pier uneven settlement, etc. Taking 5 km/h as the speed interval, the dynamic responses of the classical vehicle-bridge system in the speed range of 5 km/h to 400 km/h are studied. The results show that ignoring the second-order pseudo-inertia force will underestimate the dynamic response of vehicle-bridge system and make the high-speed railway bridge structure design unsafe.

The International Arbitration System for the Settlement of Investor-State Disputes in the FTA (FTA(자유무역협정)에서 투자자 대 국가간 분쟁해결을 위한 국제중재제도)

  • Lee, Kang-Bin
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.38
    • /
    • pp.181-226
    • /
    • 2008
  • The purpose of this paper is to describe the settling procedures of the investor-state disputes in the FTA Investment Chapter, and to research on the international arbitration system for the settlement of the investor-state disputes under the ICSID Convention and UNCITRAL Arbitration Rules. The UNCTAD reports that the cumulative number of arbitration cases for the investor-state dispute settlement is 290 cases by March 2008. 182 cases of them have been brought before the ICSID, and 80 cases of them have been submitted under the UNCITRAL Arbitration Rules. The ICSID reports that the cumulative 263 cases of investor-state dispute settlement have been brought before the ICSID by March 2008. 136 cases of them have been concluded, but 127 cases of them have been pending up to now. The Chapter 11 Section B of the Korea-U.S. FTA provides for the Investor_State Dispute Settlement. Under the provisions of Section B, the claimant may submit to arbitration a claim that the respondent has breached and obligation under Section A, an investment authorization or an investment agreement and that the claimant has incurred loss or damage by reason of that breach. Provided that six months have elapsed since the events giving rise to the claim, a claimant may submit a claim referred to under the ICSID Convention and the ICSID Rules of Procedure for Arbitration Proceedings; under the ICSID Additional Facility Rules; or under the UNCITRAL Arbitration Rules. The ICSID Convention provides for the jurisdiction of the ICSID(Chapter 2), arbitration(Chapter 3), and replacement and disqualification of arbitrators(Chapter 5) as follows. The jurisdiction of the ICSID shall extend to any legal dispute arising directly out of an investment, between a Contracting State and a national of another Contracting State, which the parties to the dispute consent in writing to submit to the ICSID. Any Contracting State or any national of a Contracting State wishing to institute arbitration proceedings shall address a request to that effect in writing to the Secretary General who shall send a copy of the request to the other party. The tribunal shall consist of a sole arbitrator or any uneven number of arbitrators appointed as the parties shall agree. The tribunal shall be the judge of its own competence. The tribunal shall decide a dispute in accordance with such rules of law as may be agreed by the parties. Any arbitration proceeding shall be conducted in accordance with the provisions of the Convention Section 3 and in accordance with the Arbitration Rules in effect on the date on which the parties consented to arbitration. The award of the tribunal shall be in writing and shall be signed by members of the tribunal who voted for it. The award shall deal with every question submitted to the tribunal, and shall state the reason upon which it is based. Either party may request annulment of the award by an application in writing addressed to the Secretary General on one or more of the grounds under Article 52 of the ICSID Convention. The award shall be binding on the parties and shall not be subject to any appeal or to any other remedy except those provided for in this Convention. Each Contracting State shall recognize an award rendered pursuant to this convention as binding and enforce the pecuniary obligations imposed by that award within its territories as if it were a final judgment of a court in that State. In conclusion, there may be some issues on the international arbitration for the settlement of the investor-state disputes: for example, abuse of litigation, lack of an appeals process, and problem of transparency. Therefore, there have been active discussions to address such issues by the ICSID and UNCITRAL up to now.

  • PDF