• Title/Summary/Keyword: underground utility tunnel

Search Result 71, Processing Time 0.023 seconds

Decision technique for accommodation facilities of multi-utility tunnel in basic planning phase (기본 계획 단계에서의 공동구 수용시설물 결정 기법)

  • Oh, Won-Joon;Jin, Kyu-Nam;Kang, Yeong-Ku;Cho, Choong-Yeun;Sim, Young-Jong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.79-92
    • /
    • 2019
  • In this paper, we propose a method to determine whether to install the accommodation facility of the multi-utility tunnel more effectively in the basic planning phase, and to set up an evaluation system to determine the configuration and kind of accommodation facility. For the configuration of the accommodation facility, 98 alternatives were analyzed for 7 accommodation facility. For the evaluation system of the accommodation facility, index related to feasibility and economic in basic planning phase were selected. The evaluation system classified as spatial, effective, and cost evaluation was presented reflecting the selected index, and AHP analysis was performed for weight setting. The results of this study will be helpful for users including designers to shorten the time and increase the efficiency in the process of determining accommodation facility of the multi-utility tunnel in basic planning phase.

The numerical study on the ground settlement behavior of box type tunnel enlargement (2차원 수치해석을 통한 초저심도 박스형 터널 편측확폭시 지반침하거동 특성 분석)

  • Cha, Yohan;Cho, Gye-Chun;Hong, Eun-soo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.83-94
    • /
    • 2016
  • Utility tunnels have been employed in Korea since the 1970s and start to make trouble with structural safety and serviceability. Recently, tunnel enlargement has consequently been proposed due to the impending problems. However there are little study on box type utility tunnels except traffic tunnels. A 2D finite element analysis was conducted to evaluate ground behavior which depends on enlargement size and stiffness by one-side enlargement of the utility tunnel. Settlement scale increased with larger enlargement size and less stiff ground conditions. The observed settlement characteristics due to enlargement are similar to that suggested by Clough & Schmidt (1981). The settlement width is more affected by enlargement size than ground condition.

A study on the feasibility assessment model of urban utility tunnel by analytic hierarchy process (계층의사분석 기법을 적용한 도심지 공동구 타당성 평가모델 연구)

  • Chung, Jee-Seung;Na, Gwi-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.131-144
    • /
    • 2018
  • The urban center of a large city has a high concentration ratio of population, commerce, and traffic. Therefore, the expected effect is high from the introduction of the urban utility tunnel and it also has sufficient economic feasibility considering life cycle cost. Moreover, the construction cost can be greatly reduced if it is included in a large underground development such as a subway or a complex transfer center construction. However, it is not reflected in actual underground development plan. When planning a urban utility tunnel in Korea, it is expected to have difficulties such as the cost of relocation of the existing Life-Line, conflicts among the individual facility institutions, procurement of construction resources and sharing. Furthermore, it is possible to promote the project only if a consensus is drawn up by a collective council composed of all facilities and project developers. Therefore, an optimal alternative should be proposed using economic analysis and feasibility assessment system. In this study, the analytic hierarchy process (AHP) is performed considering the characteristics of urban areas and the importance of each indicator is quantified. As a result, we can support reasonable design capacity optimization using the feasibility assessment system.

Comparison of Deep Learning Based Pose Detection Models to Detect Fall of Workers in Underground Utility Tunnels (딥러닝 자세 추정 모델을 이용한 지하공동구 다중 작업자 낙상 검출 모델 비교)

  • Jeongsoo Kim
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.2
    • /
    • pp.302-314
    • /
    • 2024
  • Purpose: This study proposes a fall detection model based on a top-down deep learning pose estimation model to automatically determine falls of multiple workers in an underground utility tunnel, and evaluates the performance of the proposed model. Method: A model is presented that combines fall discrimination rules with the results inferred from YOLOv8-pose, one of the top-down pose estimation models, and metrics of the model are evaluated for images of standing and falling two or fewer workers in the tunnel. The same process is also conducted for a bottom-up type of pose estimation model (OpenPose). In addition, due to dependency of the falling interference of the models on worker detection by YOLOv8-pose and OpenPose, metrics of the models for fall was not only investigated, but also for person. Result: For worker detection, both YOLOv8-pose and OpenPose models have F1-score of 0.88 and 0.71, respectively. However, for fall detection, the metrics were deteriorated to 0.71 and 0.23. The results of the OpenPose based model were due to partially detected worker body, and detected workers but fail to part them correctly. Conclusion: Use of top-down type of pose estimation models would be more effective way to detect fall of workers in the underground utility tunnel, with respect to joint recognition and partition between workers.

Development of optimal cross-section design methods for bored utility tunnels: case study of overseas typical cross-sections and design criteria (터널식 공동구 최적단면 설계기술 개발: 해외 표준단면 사례 및 설계기준 분석)

  • Park, Kwang-Joon;Yun, Kyoung-Yeol
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1073-1090
    • /
    • 2018
  • Since the domestic utility tunnels were built mainly in the development project of the new city, they are all in the form of cut-and-cover box tunnel. But, in the case of overseas construction of utility tunnels for existing urban areas, the bored tunnel types are mainly adopted. It is reasonable to install bored tunnels in a downtown area because it is difficult to block the roads or install bypass roads due to heavy traffic and civil complaints. In order to activate the utility tunnels in bored type, it is necessary to secure optimized cross-sectional design technology considering the optimal supplying capacity and mutual influencing factors (Thermal Interference, electrolytic corrosion, efficiency of the maintenance, etc.) of utilities (power cables, telecommunication cables, water pipes, etc.). The optimal cross-section design method for bored utility tunnels is ultimately to derive the optimal arrangement technique for the utilities. In order to develop the design methods, firstly, the cases of tunnel cross-section (Shield TBM, Conventional Tunneling) in overseas shall be investigated to analyze the characteristics of the installation of utilities in the section and installation of auxiliary facilities, It is necessary to sort out and analyze the criteria related to the inner cross-section design (arrangement) presented in the standards and guidelines.

Development of a Deep Learning-based Fire Extinguisher Object Detection Model in Underground Utility Tunnels (딥러닝 기반 지하 공동구 내 소화기 객체 탐지 모델 개발)

  • Sangmi Park;Changhee Hong;Seunghwa Park;Jaewook Lee;Jeongsoo Kim
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.4
    • /
    • pp.922-929
    • /
    • 2022
  • Purpose: The purpose of this paper is to develop a deep learning model to detect fire extinguishers in images taken from CCTVs in underground utility tunnels. Method: Various fire extinguisher images were collected for detection of fire extinguishers in the running-based underground utility tunnel, and a model applying the One-stage Detector method was developed based on the CNN algorithm. Result: The detection rate of fire extinguishers photographed within 10m through CCTV video in the underground common area is over 96%, showing excellent detection rate. However, it was confirmed that the fire extinguisher object detection rate drops sharply at a distance of 10m or more, in a state where it is difficult to see with the naked eye. Conclusion: This paper develops a model for detecting fire extinguisher objects in underground common areas, and the model shows high performance, and it is judged that it can be used for underground common area digital twin model synchronizing.

A study on the weights on the evaluation items for utility tunnel performance evaluation (공동구 성능평가를 위한 평가항목의 가중치 산정 연구)

  • Yongjun Lee;Kyu-Nam Jin;Young-Jong Sim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.5
    • /
    • pp.477-488
    • /
    • 2024
  • The Korean government amended the Facilities Safety Act in 2018 to establish a performance-based maintenance system. This system is designed to comprehensively evaluate the safety, durability, and usage performance of facilities required to maintain their function in use, and to establish corresponding maintenance plans. However, the current maintenance system of utility tunnels is managed by a safety-oriented evaluation method, which has limitations in conducting performance evaluations that consider durability and usage performance. Therefore, in this study, safety, durability, and usage performance items for utility tunnels were selected using the Delphi method, and the weight of each item was calculated using the entropy weighting method. The results of this study are expected to be used in future performance evaluations of utility tunnels to support rational decision making when establishing maintenance plans.

A study on the improvement of the protective shield construction method and explosion-proof tube performance for tunnel blasting (터널 발파에 대한 방호쉴드 공법 및 방폭튜브 성능 개선 연구)

  • Sang-Hwan Kim;Soo-Jin Lee;Jung-Nam Kwon;Dong-gyun Yoo;Yong-Woo Kim;Kwang-Eun Cho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.4
    • /
    • pp.285-303
    • /
    • 2023
  • Interest in building underground spaces is increasing for the creation of downtown infrastructure and efficient space utilization. A representative method of utilizing underground space is a tunnel, and in addition to road tunnels, the construction of utility tunnels such as power conduits and utility conduits is gradually increasing. The current basic tunnel construction method can be divided into NATM (New Austrian Tunnelling Method) and TBM (Tunnel Boring Machine). The NATM is a reliable method, but it is accompanied by vibration and noise due to blasting. In the case of the TBM excavation method, there are disadvantages in terms of construction period and construction cost, but it is possible to improve economic feasibility by introducing appropriate complementary methods. In this study, a blasting method was develop using the NATM after TBM pre-excavation using the protective shield method. This is a method that compensates for the disadvantages of each tunnel construction method, and is expected to reduce construction costs, blasting vibration, and noise. In order to review the performance of the developed method, an experiment was conducted to evaluate the performance of explosion-proof tube to which a protective shield scale model was applied, and the impact of blasting vibration of the protective shield method was analyzed.

Snow Tunnelling Project at the South Pole (남극 극지점 기지에서의 얼음 터널 프로젝트)

  • 지왕률
    • Tunnel and Underground Space
    • /
    • v.13 no.1
    • /
    • pp.1-5
    • /
    • 2003
  • The United States Antarctic program (USAP) through its principal Support Contractor Raytheon polar Services Co. (RPSC), has recently finished a 3 years projects, almost 936m length of underground utility tunnels at Amundsen-Scott station. It accommodates the piping that conveys fresh water from current well sites, as well as waste water to repositories in abandoned wells. The under snow tunnels allow year-round access for system operations and maintenance.