Previous studies for soil movements induced by tunneling have primarily focused on the free soil displacements. However, the stiffness of existing structures is expected to alter tunneling-induced ground movements, the sheltering influences for underground structures should be included. Furthermore, minimal attention has been given to the settings for the shield machine's operation parameters during the process of tunnels crossing above and below existing tunnels. Based on the Shanghai railway project, the soil movements induced by an earth pressure balance (EPB) shield considering the sheltering effects of existing tunnels are presented by the simplified theoretical method, the three-dimensional finite element (3D FE) simulation method, and the in-situ monitoring method. The deformation prediction of existing tunnels during complex traversing process is also presented. In addition, the deformation controlling safety measurements are carried out simultaneously to obtain the settings for the shield propulsion parameters, including earth pressure for cutting open, synchronized grouting, propulsion speed, and cutter head torque. It appears that the sheltering effects of underground structures have a great influence on ground movements caused by tunneling. The error obtained by the previous simplified methods based on the free soil displacements cannot be dismissed when encountering many existing structures.
The west express way which links south west area of the central city of Seoul has been notorious for extremely heavy traffics since its first opening in 1991(i.e. the average vehicle speed is less than 25km/h, a daily traffic is 112,000 and among them, more than 94% of the vehicles are the light vehicles). The city government recently initiated a new BTO(Build-Transfer-Operate) project as an alternative in releasing heavy traffic and a high construction cost. The proposed underground express road is the first double-level tunnel (i.e. a total length of road is 10,91km and the tunnel is 9.308km long) ever built in South Korea, while such tunnel system is not new worldwide as such A86 East tunnel in France, SMART tunnel in Malaysia, and Fuxing tunnel in China. This paper discusses major design issues regarding the internal structures such as deck slab, and secondary liner.
According to the wide application of diesel equipments in tunneling faces, the air contamination by various toxic gases and carcinogenic diesel particulate matter becomes a serious problem these days. For taking a scientific measures to solve the problem, the way to simulate 3 dimensional flow movement of the working sites is required. In this paper, the newly developed simulation program(3D-FLOW) and the results of a simulation on a model tunneling workings using diesel equipments are introduced. In case of typical model of tunneling face, the gas concentration of human height is about one third of roof concentration and right side half of the tunnel shows better environment than left half. NOx concentration of workings can be estimated about 0.45ppm which is much lower than permissible level(5 ppm).
최근 국내 빈번하게 발생되고 있는 지반함몰 현상의 원인, 현황, 대책에 대하여 지반공학적인 접근 방법으로 조사하였다. 국내 발생된 지반함몰은 대부분 터널 굴착 공사와 지중매설관의 손상에 의한 것으로 나타났다. 용산역과 석촌 지하차도 지반함몰 사례와 같이, 굴착 공사 중 지반함몰은 지하수와 토사의 과다 유출이 주된 원인으로 나타났다. 특히, 충적층과 같은 연약지반에서의 기계식 굴착 시, TBM 굴착이 멈춘 지점에서 지반함몰 위험이 큰 것으로 나타났다. 서울시에서 발생된 지중매설관 손상으로 인한 지반함몰 사고를 종합하였을 때, 시공 시의 부주의, 노후화, 연약지반에서의 관의 부등침하 등이 지반함몰의 원인으로 나타났다. 터널 굴착 공사에 의한 지반함몰은 공사 시 발생되는 지하수, 토사의 이동에 대한 모니터링을 통해 대비할 수 있다. 지중매설관 손상으로 인한 지반함몰은 지중매설관의 생애주기 분석 및 유지관리 혹은 관 상부의 토압 분산 및 토압 지지력 증대를 통하여 대비할 수 있을 것으로 판단된다.
It was described Several Tuneling method for applying petrolum oil storage. The most Important factor of Tunneling is not only reinforcing works such as pre-grouting and after grouting but also rock bolting and shotcrete. The efficent works should be done by professional skillman, and also the classification of rock should be decided by professional engineers.
최근 국내에서 쉴드TBM을 이용하는 터널공사의 발주가 증가하고 있으나 터널구간의 특성을 고려한 장비제작을 위한 정보의 제공은 체계적이지 못하여, 적합한 장비설계를 하는데 어려움이 많다. 본 기술보고는 외국의 사례검토를 바탕으로 토압식 쉴드TBM의 장비발주를 위한 설계항목과 세부 요구사양의 구성에 대해 국내에서 활용 가능한 내용을 예시로서 제시하였다. 제안하는 내용을 바탕으로 발주자는 장비 발주 시 필요한 전반적인 방향을 제시가능하고, 입찰자는 명확하고 과업조건에 적합한 장비를 설계, 제작하여 민원이 없고, 안전한 토압식 쉴드TBM 터널공사의 활성화에 기여할 수 있을 것으로 기대된다.
The scope of this cable works was as follows, it was drilled two shafts, NO. 1 shaft (${\phi}6.8m{\times}31m$), NO.2 shaft (${\phi}6.8m{\times}33m$), ) and it was connected two shaft in Tunneling. The first, it was needed to investigate the surey of influenced of vibration and noise by blastig to near by housing structure. 2nd, it was essential to decide the boundary line of influenced for agriculture water and portable water, by draw down of underground water. Blasting works has been done successfully without any problem, but by draw down of underground water, with in 250m level from #1 shaft, agriculture well drilled 8 place and portable water well drilled 7 place for near by farmers.
Based on the investigation results on the damages of some underground structures due to the severe Kobe Earthquake it concludes that the aseismicity of underground is far superior to that of aboveground structures. Therefore, at first, necessity to reconstruct strong cities especially by good use of underground space will be discussed. Then two non-circular shield-tunneling projects in Japan are discussed. The first is construction of the world's first shield driven double track subway tunnel of rectangular shape for the Kyoto Municipal Subway. This paper presents a report on the overall planning, the tests that were performed in the process of planning, and the results of driving. The second is the design of the Hirakata Tunnel, with three traffic lanes and shoulders on one side, which will be constructed as one of the tunnels for The New Meishin (Nagoya-Kobe) Expressways. This paper presents the feasibility study of the shield tunneling method, using the same design criteria as the non-circular, horseshoe section of mountain tunnel, to the equivalent section of the Hirakata Tunnel.
본 논문에서는 터널굴착과 지히수의 상호작용이 터널의 거동에 미치는 영향에 대한 내용을 다루었다. 이를 위해 먼저 터널 굴착으로 인해 지하수유동이 발생하는 구간에서의 설계주안점을 고찰하였으며 서울지역의 지하철 건설시 접하는 일반적인 지반조건에 시공되는 가상의 터널조건에 대해 응력-간극수압 연계해석을 이용한 매개변수 연구를 수행하였다. 매개변수 연구 결과를 토대로 지하수 유동에 따른 막장거통 및 지표변위 특성을 고찰하였으며 터널-지히수 상호작용 관점에서 지반/라이닝 투수성에 따른 솟크리트 라이닝 응력 발생 경향을 고찰하였다. 검토결과 터널-지히수 상호작용은 지표침하량 및 변위를 증가시키며 솟크리트 라이닝 축력을 증가시키는 것으로 나타났다. 아울러 솟크리트 축력은 지반과 솟크리트 라이닝의 상대적 투수성에 좌우되는 것으로 나타났다. 본 연구결과를 종합하여 설계시 고려하여야 할 주안점을 제시하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.