• 제목/요약/키워드: underground stories

검색결과 24건 처리시간 0.029초

Seismic performance of reinforced concrete shear wall buildings with underground stories

  • Saad, George;Najjar, Shadi;Saddik, Freddy
    • Earthquakes and Structures
    • /
    • 제10권4호
    • /
    • pp.965-988
    • /
    • 2016
  • This paper investigates the seismic behavior of reinforced concrete shear wall buildings with multiple underground stories. A base-case where the buildings are modeled with a fixed condition at ground level is adopted, and then the number of basements is incrementally increased to evaluate changes in performance. Two subsurface site conditions, corresponding to very dense sands and medium dense sands, are used for the analysis. In addition, three ground shaking levels are used in the study. Results of the study indicated that while the common design practice of cropping the structure at the ground surface leads to conservative estimation of the base shear for taller and less rigid structures; it results in unpredicted and nonconservative trends for shorter and stiffer structures.

굴착순서에 따른 Top Down 선기둥 지지력 산정 (Load Carrying Capacity of Top Down Prefounded Columns on Different Excavation Schedule)

  • 임홍철;황희선
    • 한국건축시공학회지
    • /
    • 제6권4호
    • /
    • pp.45-52
    • /
    • 2006
  • Top Down method is more widely used in downtown construction, recently. As underground construction constitutes a significant portion of the total construction cost and time in Top Down construction, it is important to develop a construction method to reduce the time required in underground works. The purpose of this study is to analyze load carrying capacity of Top Down prefounded columns on different excavation schedule. When several floors are excavated, the valid buckling length of prefounded column is increased and allowable buckling stress is decreased. The result shows that all columns are safe in buckling down to B3 story whether 2 or 3 stories are excavated. However, several columns are not safe from B4 story when 2 or 3 stories are excavated straightly. With these results, a process can be designed that the first three stories in the basement are excavated, and then excavate B4 story after placing concrete on B1 and B2 floor.

Top Down 선기둥의 지지력 산정방법에 관한 연구 (Study on Load Carrying Capacity of Top Down Prefounded Columns)

  • 황희선;임홍철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.137-140
    • /
    • 2006
  • As underground construction is a large component of the cost of construction and a term of works in Top-Down construction, it is important to reduce the term of works in underground construction. The purpose of this study is to analyse buckling stress and load of prefounded columns as the process of excavation is changed, and propose a suitable process of excavation to increase the speed of works. When several floors are excavated, the valid buckling length of profounded column is increase and allowable buckling stress is decreased. The result shows that all columns are safe in buckling down to B3th story whether 2 stories or 3 stories are excavated straightly. However, several columns are not safe from B4th story when 2 or 3 stories are excavated straightly. With these results, a process can be designed that first B3 stories are excavated straightly, and then excavate B4th story putting concrete on B1st and B2nd story.

  • PDF

급기가압 제연시스템의 현장 성능평가 연구 (Field Experiments on Performance Evaluation of Pressure Differential System for Smoke Management)

  • 김정엽;이동호;김하영
    • 한국화재소방학회:학술대회논문집
    • /
    • 한국화재소방학회 2008년도 춘계학술논문발표회 논문집
    • /
    • pp.251-254
    • /
    • 2008
  • The fact that the major cases of life casualties are from smoke in the fire accidents and the expected steep increase of skyscrapers, huge spaces, multiplexes and huge scaled underground spaces demand establishment of efficient smoke countermeasure. The field experiments on two high buildings of 20 stories and 21 stories are carried out to evaluate the field performance of pressure differential systems for smoke management and the results of experiments are presented.

  • PDF

아파트 지하주차장 소화기의 유지관리 효율화 방안에 관한 연구 (A Study on the Effective Method of Fire Extinguisher Maintenance In the Underground Parking Lot of the Apartment)

  • 이영삼
    • 대한안전경영과학회지
    • /
    • 제18권3호
    • /
    • pp.1-8
    • /
    • 2016
  • The definition of an apartment is a building more than 5 stories high and which is the standard law. Currently, the number of apartments is increasing much faster than detached houses. Owning an apartment is a normal trend these days. However, the increasing number of apartments has been increasing the number of apartment fires which also has been making social problems. Therefore, this study was conducted for the fire extinguisher among other fire facilities because it is important for initial fire suppression. The research subject is on the fire extinguisher that is in the underground parking lot of 40 apartment complexes which are more than 10 stories. Survey and analysis were conducted for 80 fire extinguishers. There are two fire extinguishers for each apartment. The result of this study is that all installed fire extinguishers are ABC dry chemical type, 92% of them is 3.3kg and that meet the legal height(less than 1.5m). However, the condition such as appearance, inspection, manufactured year, appearance of signs, material of signs, size of signs, etc. was insufficiency. So improvement of law and system that are fire facility construction, maintenance implementation and additional designation of type approval about sign will be needed in my opinion.

급기가압 제연시스템의 피난문 개방시 방연풍속 형성특성에 대한 현장실험 (Field Experiments on Features of Airflow through Open Door in Pressure Differential System)

  • 김정엽;이동호;김하영
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 하계학술발표대회 논문집
    • /
    • pp.463-467
    • /
    • 2008
  • The fact that the major cases of life casualties are from smoke in the fire accidents and the expected steep increase of skyscrapers, huge spaces, multiplexes and huge scaled underground spaces demand establishment of efficient smoke countermeasure. The field experiments on pressure differential systems for smoke management in two high buildings of 20 stories and 21 stories are carried out to evaluate the features of airflow through open door between accommodation and lobby. The procedures and results of experiments are presented.

  • PDF

지하주차장 차량하중에 따른 구조체의 영향분석 (Structural Analysis of Underground Parking Garage Under Vehicle Load)

  • 김영진;이범식;최동섭;오효근;강창범
    • 복합신소재구조학회 논문집
    • /
    • 제4권4호
    • /
    • pp.22-29
    • /
    • 2013
  • Accumulation of more than 20,000,000 vehicles since the establishment of the quality of life and economic development needs several parking lots and cause crack problem in Korea. Related structures in large cities due to the lack of parking garage attached to secure underground parking structures are actively being built, and the basement parking lot will continue to increase more stories and the trend is expected to be larger. But so far, construction of the underground parking structure is related to a number of problems, including cracks in the structure. Therefore, in this study, repair, reinforcement and a few non-economic losses in the current design criteria are presented. The review of the structure used to current design criteria is to minimize crack and maximize usability.

TOP DOWN 지하공사의 작업환경체크 컴퓨터시물레이션에 관한 기초적 연구 (Computer Simulation for Working Condition of Undergroundwork Using TOP DOWN Technique)

  • 고성석;손기상;심경수
    • 한국안전학회지
    • /
    • 제10권3호
    • /
    • pp.96-105
    • /
    • 1995
  • The better industry develops, the more spaces need but in the limited area. Most building become larger and more complicated if the more spaces need in the constant area. And this leads to do underground work in long period generally six(6) months for 6 basement stories due to the selection of TOP DOWN technique. Working environment in this underground area can be problems and should not be overlooked, because air quality in underground spaces become quickly worse. Recently, department name to control construction safety has been changed to ENVIRONMENT & SAFETY TEAM from SAFETY TEAM. This means that it is very important to control against environmental condition at site so much. Overall construction work as well as underground work should conform to the requirement of working environment, particularly against inhabitants around the construction area. Strut protection, one of earth protection method, in case to 40m long strut may become weaker due to thermal stress or its longitudinally compressive strain and the another one, earth anchor protection may not be applied to the site In case of encroaching on vertical underground borderline because of regulation to prohibit it. It is necessary that TOP DOWN technique should be introduced in order to solve the external and internal problem of the site such as difficulty level of the work, potential danger with excavating depth, and shortening workperiod. It is needed that improving way of working condition should be shown and simplified computer simulation program should be also provided for checking pollution level & ventilation, excluding of lighting problem here. Results measured with conformance to the Regulation for Working Environment Measurement, enforced by Ministry of Labor have been applied to the computer program developed here. Sample air taken at unit workplace which was considered as exposing condition of pollutant at breathing point and within a range of behavior of the workers, Identified exposing group in underground work, using Moded Flow Life Finally, three types of ventilation system, type I with blower & ventilator, type II natural supply with mechanical ventilation system, and type I mechanical ventilation with Drivent Fan Unit System are selected for this study.

  • PDF

Application of BIM on Quantity Estimate for Reinforced Concrete and Formwork

  • Cheng, Ying-Mei;Lin, You-Lun;Li, Cheng-Wei;Lin, Chi-Ting
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.227-231
    • /
    • 2015
  • The focus of this study is on the accuracy in quantity estimates made by BIM for materials needed during construction. BIM-Revit Architecture 2014 is utilized to establish the information for an actual case to conduct estimates for the amount of reinforced concrete and formwork needed. The actual case is with a total construction area of 5,438 square meters and a total floor area of 31,623 square meters. The building commenced in December 2012 and the major structure has been completed in 2014. It is a RC structure with 4 stories underground, 12 stories above and 3 roof floors. The result shows that both of the quantity estimates of reinforced concrete and formwork are higher than that of actual use in the case. The estimate of reinforced concrete is higher than that of actual use by 2.18%, while the estimate of formwork is higher than that of the actual use by 13.04%. The results indicate that the estimate of reinforced concrete made by BIM has high accuracy, but the accuracy of the formwork estimate still needs improvement.

  • PDF

전도공법에 의한 축소모형 철근콘크리트 구조물의 붕괴거동 (Collapse Behavior of Small-Scaled RC Structures Using Felling Method)

  • 박훈;이희광;유지완;송정언;김승곤
    • 터널과지하공간
    • /
    • 제17권5호
    • /
    • pp.381-388
    • /
    • 2007
  • 발파해체 되는 철근콘크리트 구조물은 교대하중에 의해 정형구조에서 비정형구조로 변환되며 붕괴거동은 비선형적인 대변위 거동을 한다. 철근콘크리트 구조물의 붕괴거동에 대한 많은 수치 모델링 연구가 수행되었지만, 비선형적인 대변위 거동을 해석하기에는 아직 부족한 수준이다. 본 연구에서는 실제 철근콘크리트 구조물을 1/5로 축소한 축소모형 구조물을 제작하였다. 전도공법으로 1층, 3층, 5층 축소모형 구조물을 발파하여 상부 자중에 의한 구조물의 붕괴 가능성을 고찰하였으며, 구조물의 붕괴거동을 X 방향(수평방향)의 변위, Z 방향(수직방향)의 변위, 상대 변위각으로 분석하였다. 실험결과 자중에 의한 구조물의 붕괴를 유도하기 위한 상부 자중의 크기를 확인할 수 있었다. 또한 구조물의 붕괴에 따른 X 방향의 변위와 Z방향의 변위는 발파 후 67 ms, 300 ms부터 서서히 증가하였고, 교대하중에 의해 3층 구조물의 초기 붕괴 속도가 5층 구조물보다 크게 발생하는 것을 확인하였다.