• Title/Summary/Keyword: underground extension

Search Result 90, Processing Time 0.025 seconds

Development of Expandable Steel Pipe Piles to Improve Bearing Capacity (지지력 향상을 위한 확장형 강관말뚝에 관한 연구)

  • Kim, Uiseok;Kim, Junghoon;Kim, Jiyoon;Min, Byungchan;Choi, Hangseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.12
    • /
    • pp.5-13
    • /
    • 2021
  • Expandable steel pipe piles have been developed to ensure stability and reduce construction costs during underground floor remodeling and extension work. Expandable steel pipe piles are more economical and stable than micropiles. Extensible steel pipe pile is a method of improving the performance of steel pipes by expanding steel pipes underground. In this paper, the changes in buckling strength according to the shape of steel pipes in an extended steel pipe pile were identified, a numerical analysis model was developed to determine the expended part effect of bumps due to steel pipe expansion, and the optimal steel pipe expansion was calculated through material tests. The larger the expansion diameter of the steel pipe and the greater the number of expanded part, the greater the buckling strength. Numerical results showed that the number of expanded part has a greater effect on buckling strength than the expansion rate. When the expansion rate is more than 1.2 times, it can be seen that as the number of expanded part increases, the effect of increasing buckling strength increases significantly. It was also noted that the expanded part effect of the bumps occur significantly when the extension angle is less than 45° and the expansion rate is 1.3 times higher. When the steel pipe is failure, the expanded rate is 20 to 32%, averaging 25.4%. Through the material test, it was analyzed that it is desirable to limit the maximum expansion rate for performing steel pipes to 16%.

A manual for the revised TBM tunnel specification (개정 TBM 터널 표준시방서 해설 연구)

  • Sagong, Myung;Jung, Chi Kwang;Moon, Joon Bai;Kim, Jeayoung;Yun, Do Sik;Yu, Myeong Han
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.4
    • /
    • pp.415-428
    • /
    • 2015
  • With increase of the extension of long tunnels and urban tunnelling, demands on the new tunnelling technologies are raised. Currently, drilling and blasting tunnel construction method is mostly used, however, because of sever blast vibration for some occasions, complaints from local residents and rock damages are inevitable. Accordingly, TBM tunnelling is more efficient and effective for such conditions. Nevertheless, tunnel construction costs of TBM cannot compete that of the drill and blasting method in Korea. To overcome such limitations, various TBM equipments and construction technologies are required. In addition, continuous revision of the design standard and specification are required. In this study, a detailed explanation regarding the revised version of TBM section in the tunnel standard specification at 2015 is shown.

Evaluation of the Quality of the Underground Dimension Stones -The Example of the Granite Quarry in the Geochang Area- (지하심부 석재자원의 품질평가 - 거창지역 화강암 석재석산의 예 -)

  • Hong, Sei Sun;Lee, Choon Oh;Lee, Jin Young;Kim, Yu Seong
    • The Journal of the Petrological Society of Korea
    • /
    • v.24 no.3
    • /
    • pp.233-252
    • /
    • 2015
  • This research are systematic and scientific approaches to obtain the distribution, occurrence and quality of granite stone for building purposes. The process of dimension stone exploration must be carried out to know the underground potentiality of granitic body using the basic data collection and study, field mapping, detailed drilling survey, televiewer technique, and physical and chemical tests in the Geochang area. Televiewer data obtained in drilling boreholes can be accurately distinguished from the discontinuous face, strike and inclination, extension which is difficult to obtain in a core logging. 3D joint images will be helpful to establish a quarry exploitation plan because the 3D joint images give quite accurate information down to depth below the outcrop surface. Through the process of the quality estimation on the Geochang site, the proven reserve estimated as dimensional building stone are calculated with good quality in petrologic and physical properties.

An Experimental Study on the Physical Property of Non-Vulcanized Waterproofing Synthetic Rubber Sheet for the Underground Concrete Wall (지하 콘크리트 벽체용 미가황 합성고무시트 방수재의 물성에 관한 실험적 연구)

  • Choi, Eun Su;Lee, Dae Woo;Seo, Sang Kyo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.4
    • /
    • pp.69-78
    • /
    • 2012
  • This paper study on the physical property of naturally vulcanizing waterproofing synthetic rubber sheet for the underground concrete wall. In order to finding the naturally vulcanizing time, the relation of vulcanizing time and tensile strength is analysed from non-vulcanizing to naturally vulcanizing time. Physical tests such as tensile strength, tear strength: etc., under the thermal environment temperature at $-20^{\circ}C$, $-10^{\circ}C$, $20^{\circ}C$, $60^{\circ}C$. The result of experiment show that the developed rubber sheet has the delay time about 85 days and the curing time about 35 days. The tensile strength increased by about 692% and coefficient of expansion decreased by about 10% which value can be sufficiently compensate the demerit of vulcanized rubber sheet. Also, all of the physical properties of the naturally rubber sheet satisfy the KS standard and compare to the vulcanized rubber sheet, the developed naturally rubber sheet have excellent durability.

Dynamic risk assessment of water inrush in tunnelling and software development

  • Li, L.P.;Lei, T.;Li, S.C.;Xu, Z.H.;Xue, Y.G.;Shi, S.S.
    • Geomechanics and Engineering
    • /
    • v.9 no.1
    • /
    • pp.57-81
    • /
    • 2015
  • Water inrush and mud outburst always restricts the tunnel constructions in mountain area, which becomes a major geological barrier against the development of underground engineering. In view of the complex disaster-causing mechanism and difficult quantitative predictions of water inrush and mud outburst, several theoretical methods are adopted to realize dynamic assessment of water inrush in the progressive process of tunnel construction. Concerning both the geological condition and construction situation, eleven risk factors are quantitatively described and an assessment system is developed to evaluate the water inrush risk. In the static assessment, the weights of eight risk factors about the geological condition are determined using Analytic Hierarchy Process (AHP). Each factor is scored by experts and the synthesis scores are weighted. The risk level is ultimately determined based on the scoring outcome which is derived from the sum of products of weights and comprehensive scores. In the secondary assessment, the eight risk factors in static assessment and three factors about construction situation are quantitatively analyzed using fuzzy evaluation method. Subordinate levels and weight of factors are prepared and then used to calculate the comprehensive subordinate degree and risk level. In the dynamic assessment, the classical field of the eleven risk factors is normalized by using the extension evaluation method. From the input of the matter-element, weights of risk factors are determined and correlation analysis is carried out to determine the risk level. This system has been applied to the dynamic assessment of water inrush during construction of the Yuanliangshan tunnel of Yuhuai Railway. The assessment results are consistent with the actual excavation, which verifies the rationality and feasibility of the software. The developed system is believed capable to be back-up and applied for risk assessment of water inrush in the underground engineering construction.

Numerical modeling of two parallel tunnels interaction using three-dimensional Finite Elements Method

  • Nawel, Bousbia;Salah, Messast
    • Geomechanics and Engineering
    • /
    • v.9 no.6
    • /
    • pp.775-791
    • /
    • 2015
  • Due to the extension of communication ways (metro, highways, railways), hence, to improve traffic flow imposes often the difficult crossing that generally drive to the construction of underground works (tunnel, water conveyance tunnel...) plays a major role in the redevelopment of urban areas. This study is focused on the assessment of the interaction response of parallel tunnels, so this study uses the results from the simulation of two tunnels to illustrate a few observations that may aid in practical designs. In this article, simultaneous drilling of highway's twin tunnels is simulated by means of Finite Element Method (FEM) implemented in Plaxis program. So the treated subject appears in a setting of geotechnical where one can be to construct several tunnels sometimes in a ground of weak mechanical characteristics. The objective of this study is to simulate numerically the interaction effects caused by construction of two parallels tunnels. This is an important factor in the study of the total answer of the problem interaction between parallels underground works. The importance of the effects transmitted is function of several parameters as the type of the works, and the mechanical characteristics (tunnel size, depth, and the relative position between two tunnels, lining thickness...). This article describes numerical analyses of two parallels tunnels interaction. This study will be applied to a real case of a section tunnel T4 of the highway East-West (Algeria); the study presented below comprises a series of numerical simulations of two tunnels using the computer program Plaxis which is used in the analyses is based on Finite Element Method.

The effect of curvature at the bottom of a soft ground tunnel by numerical analysis (수치해석에 의한 연약지반 터널의 바닥부 곡률의 영향 분석)

  • You, Kwangho;Kim, Kangsan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.2
    • /
    • pp.107-118
    • /
    • 2021
  • Due to the acceleration of road construction, the number and extension of tunnels are increasing every year. A lot of research has been done on the collapse of tunnels, but research on the invert heaving is insufficient. Therefore, in this study, a sensitivity analysis was performed using a geotechnical general-purpose program to analyze the effect of the invert curvature of a tunnel excavated on the soft ground. As a result, it was quantitatively confirmed that the stability of a tunnel was increased as the curvature of the tunnel invert was increased so that the safety factor was calculated to be large regardless of the ground conditions and the thickness of the support. In addition, it was confirmed that the stability of the tunnel was increased by reducing the convergence of the tunnel and the maximum bending stress supported by shotcrete. Therefore, when a tunnel is excavated on soft ground, it is believed that applying a curvature to the invert will increase the stability of the tunnel.

Growth Analysis of Angelica gigas Nakai Affected by Cultivation Methods (참당귀(Angelica gigas Nakai)의 직파 및 이식재배에 따른 생장해석)

  • Nam, Hyo-Hoon;Choi, Don-Woo;Kim, Kil-Ung;Kwon, Oh-Heun;Choi, Boo-Sull
    • Korean Journal of Medicinal Crop Science
    • /
    • v.7 no.3
    • /
    • pp.218-228
    • /
    • 1999
  • This study was conducted to obtain the information on dry matter productivity in Angelica gigas Nakai for establishing the cultivation method. Cultivation methods such as direct seeding on Mar. 31, Apr. 15 and Apr. 30, and transplanting of $8^{\frac{1}{2}}$, 9, 12 months old seedling were investigated. There were similar tendencies in changes of agronomic characters for all cultivation methods. Dry weight started to increase from 120 DAS. Direct seedling showed vigorous growth for aerial part, whereas transplanting showed better underground part. The quadratic polynomial was suitable to dry weight of root after 120 DAS (or DAT) .Short growing time had higher RGR and NAR independent of cultivation method but Direct seeding on Mar. 31 and transplanting of 9 months old seedling had the highest CGRs. LAI was positively correlated with CGR, and CGR had the highest value as $6.74\g/m^2/day$ when LAI was 1.97. RGR and NAR increased as mean temperature was increased and showed the highest value around . The highest net production of leaf and petiole was obtained at 20 and$23^{\circ}C$, respectively.

  • PDF

Selection of Suitable Organic Matter for To-jik Nursery in Panax ginseng C.A. Meyer (인삼 재배 시 토직모 생산에 적합한 유기물 선발)

  • Kim, Dong-Won;Kim, Hee-Jun;Park, Jong-Suk;Kim, Dae-Hyang;Cheong, Seong-Soo;Ryu, Jeong
    • Korean Journal of Medicinal Crop Science
    • /
    • v.18 no.2
    • /
    • pp.74-78
    • /
    • 2010
  • This experiment was carried out to select suitable organic matter in To-jik nursery (self soil nursery) for complement To-jik nursery's defects that are deterioration of raw material by poor quality of seed ginseng and reduction of the quantity in seed ginseng production. Organic matter used were Yacto, rice bean, defatted rice bran, soybean cake and their mixture. As follows, bulk density in soil physical property by treating organic composts was the greatest in soybean cake and the next was followed by mix, Yacto, defatted rice bran, and rice bran treatment in order. Soil pore space ratio was totally the opposite; that was rice bran the first and followed by defatted rice bran, Yacto, mix and soybean cake treatment. The incidence rate of damping off by treating organic composts was 1.5% in both soybean cake and mix while the others was 1.0%. Emergence time was the same among treatment on April 16 and Emergence rate was the highest at 73% in Yacto. There was no significant differences among treatment in the growth of aboveground part but it was a little better in defatted rice bran treatment. In Yacto treatment, the growth of underground part, total root number per kan, rate of first grade ginseng seedling, and rate of usable ginseng seedling etc. were entirely higher but there was little differences. Using defatted rice bran was slightly lower in productivity compared to Yacto, but the possibility was high as a alternative for Yacto in a view of managing cost down.

Case History: Micropiling for Existing Foundation Retrofits (마이크로파일을 이용한 기초보강공법의 국내 적용 사례)

  • Lee, Jung-Hoon;Choi, Chang-Ho;Cho, Sam-Deok;Lee, Ki-Hwan;Jo, Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.359-365
    • /
    • 2008
  • As housing supply ratio has become over 100%, the strategic vision of government's policies has been changed from new construction to maintenance and regeneration of old architectural-structures. This fact has brought a light on the reconstruction and remodeling industries and a need for retrofit and rehabilitation techniques of existing foundation. Various methods of foundation for architectural-structures do exist. Among them, micropiling technologies are increasingly applied in foundation rehabilitation and seismic retrofitting projects. Micropiling techniques provide environmental-friendly methods for minimizing disturbance to adjacent structures, ground, and the environment. The installation is possible in restrictive area and general ground conditions. The fact that the installation procedures cause minimal vibration and noise and require very low ceiling height makes the micropiling methods to be commonly used for underpin existing structures. Specialized drilling equipment is often required to install the micropiles for existing basement facilities. This paper presents a case study in which micropiles were constructed to support a superstructure for vertical extension of existing elevator core and provide accessibility to underground parking lot. It is intended to become useful reference for the similar remodeling project.

  • PDF