• Title/Summary/Keyword: underground discharge

Search Result 119, Processing Time 0.029 seconds

Analysis of Partial Discharge Phenomena by means of CAPD (CAPD기법을 이용한 부분방전 현상 해석에 관한 연구)

  • Kim, Sung-Hong
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2002.07b
    • /
    • pp.939-944
    • /
    • 2002
  • PD phenomena can be regarded as a deterministic dynamical process where PD should be occurred if the local electric field be reached to be sufficiently high. And thus, its mathematical model can be described by either difference equations or differential equations using several state variables obtained from the time sequential measured data of PD signals. These variables can provide rich and complex behavior of detectable time series, for which Chaos theory can be employed. In this respect, a new PD pattern recognition method is proposed and named as 'Chaotic Analysis of Partial Discharges (CAPD)' for this work. For this purpose, six types of specimen are designed and made as the models of the possible defects that may cause sudden failures of the underground power transmission cables under service, and partial discharge signals, generated from those samples, are detected and then analyzed by means of CAPD. Throughout the work, qualitative and quantitative properties related to the PD signals from different defects are analyzed by use of attractor in phase space, information dimensions ($D_0$ and D2), Lyapunov exponents and K-S entropy as well. Based on these results, it could be pointed out that the nature of defect seems to be identified more distinctively when the CAPD is combined with traditional statistical method such as PRPDA. Furthermore, the relationship between PD magnitude and the occurrence timing is investigated with a view to simulating PD phenomena.

  • PDF

Characteristics of DIC(Dissolved Inorganic Carbon) Behavior On Sea Water with Bicarbonate Discharge (중탄산이온 농축해수의 해양방류에 따른 DIC 거동 특성)

  • Kwon, Sung-Min;Kim, Kang-Min;Lee, Joong-Woo
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.05a
    • /
    • pp.234-236
    • /
    • 2018
  • 기후변화는 더 이상 피할 수 없는 매우 중요한 문제다. 온실가스 중 큰 비중을 차지하는 이산화탄소 배출을 억제하거나 제거하기 위한 많은 연구들이 진행되고 있다. 최근에는 CCS 중 하나인 지중저장(underground storage)의 대안으로 해양에 이산화탄소를 저장하는 기술인 AWL(Accelerated Weathering of Limestone)을 이용한 해양저장(ocean storage)에 대한 연구가 진행되고 있다. AWL은 이산화탄소를 중탄산이온 형태의 농축수로 만들어 해양에 방류하여 희석 저장시키는 방법으로, 대기 중 재방출이 거의 발생하지 않고 배출된 농축수는 해양의 알칼리도를 높여 해양산성화를 방지할 수 있는 장점이 있다. 금회 연구는 AWL에 의한 방법 중 중탄산이온 농축수의 해양방류 시 이산화탄소 등을 포함하는 용존 무기탄소(DIC, Dissolved Inorganic Carbon)의 거동특성을 파악하기 위한 목적으로 수행하였다. 연구대상 해역은 충분한 수심과 작업효율성이 확보되는 울릉도 부근으로 설정하였으며, 거동특성을 파악하기 위하여 표층방류(surface discharge)와 수중방류(submerged discharge)에 의한 물질확산을 계산할 수 있는 CORMIX모형을 채택하였다. 실험결과, 방류 시점으로부터의 희석률을 고려했을 때, 표층방류 시나리오가 농축수 방류에 가장 적합한 방식이라고 사료된다.

  • PDF

Partial Discharge Simulation and Analysis Based on Experiment in Underground Distribution Power Cables

  • Jung, Chae-Kyun;Kim, Jeong-Tae;Lee, Jong-Beom
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.4
    • /
    • pp.832-839
    • /
    • 2013
  • This paper describes the simulation and experiment for partial discharge (PD) pulse propagation in 22.9kV CNCV power cables. To investigate the propagation characteristics of PD, experiments are carried out by injecting the PD pulse in 100m-long 60 $mm^2$ CNCV cable in the laboratory. The characteristics of PD are also simulated using EMTP to investigate and analyze PD in the same cable. By comparing the simulation and test results, parameter permittivity is recalculated by considering semiconducting screen in the process of simulation and analysis of PD. After it is proved that simulation results and test results are almost similar in the laboratory, extensive simulations are performed to analyse various PD characteristics such as propagation velocity, attenuation, etc. in 60 $mm^2$ and 325 $mm^2$ CNCV cables. Authors are confident that results obtained in this paper will be used as important technical materials to detect and investigate PD generated in transmission and distribution power cables.

IJ Modeling and Partial Discharge Analysis in Underground Transmission Systems (지중송전계통에서 절연접속함 모델링 및 부분방전 특성해석)

  • Chea, Jik-Byoung;Ko, Kwan-Man;Lee, Jae-Myeong;SON, Yong-Dae;Lee, Jong-Beom
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.379-380
    • /
    • 2015
  • 본 논문에서는 지중송전계통에서 OF 케이블 선로 절연접속함(IJ)의 부분방전 특성을 분석하기 위하여 복합절연 모델링이 가능한 EMTP LCC Enclosing Pipe를 이용하여 IJ를 모델링한 후 IJ 절연보강층의 한 부분에서 부분방전전압을 인가한 후 신호를 분석하는 방법으로 IJ의 부분방전 특성을 해석하였다.

  • PDF

The studies of actual condition and therapeutic effects of hot spring water in Korea (우리나라 온천의 실태와 치료적 효과에 관한 연구)

  • Park Rae-Joon
    • The Journal of Korean Physical Therapy
    • /
    • v.12 no.3
    • /
    • pp.369-377
    • /
    • 2000
  • Hot spring water is petrifaction water and mixed with animals and plants disintegrated water in the underground. The ingredient are complicated and abundant. The contained element is used to facilitate the function of human body. activate the human structure movement. discharge waste material due to increase circulation and metabolism, also it can remain the homeostasis. We can not find research for spa therapy in our country. We use to drink and bath in the hot spring water bue don't have rehabilitation facilities

  • PDF

A New Quantification Method of Rock Joint Roughness (II) - Roughness classification and strength equation - (암석 절리면 거칠기의 정량화에 대한 연구(II) - 거칠기의 구분과 강도식의 제안 -)

  • Hong, Eun-Soo;Cho, Gye-Chun;Kwon, Tae-Hyuk;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.2
    • /
    • pp.183-196
    • /
    • 2006
  • Rock joint roughness obtained from the camera-type 3D scanner was classified into waviness and unevenness. The classification criteria were established in the previous study; digital filtering was used to distinguish one from another. The classified and original profiles were used to produce metal moulds. For accurate machining of the moulds, the WEDM(Wire-cut Electric Discharge Machining) was adopted. Specimens were cast using high strength gypsum, and joint shear tests were performed by varying normal stress from low value to high one. Roughness mobilization characteristics depending on the asperity scale and the applied normal stress were investigated. A new equation was proposed to predict shear strength of rock joint, which can consider the characteristics of roughness mobilization and roughness parameters. The roughness quantification composed of waviness and unevenness was found to be a useful method to predict the joint shear strength.

  • PDF

Development of Loaded Stream Fire Extinguishing Systems for Underground Transmission Cables (지중송전선로 접속부용 미분무 강화액 소화설비의 개발연구)

  • Lee, Sung-Mo
    • Fire Science and Engineering
    • /
    • v.22 no.1
    • /
    • pp.93-98
    • /
    • 2008
  • Full-scale fire extinguishment tests were conducted to develop loaded stream fire extinguishing systems for protecting underground transmission cables. The dimension of test mock-up was 5.5m height${\times}3m$ width ${\times}6m$ length, and six 154kV OF cables were piled up. Gasoline was used to ignite cates. Linear heat detection cables were installed on top of 154 kV OF cable and discharge nozzles were installed on the top and sidewalls, respectively. As a result, both surface fires and deap-seated fires were extinguished successfully within the specified 3 minutes by discharging loaded stream agent.

A Development of Surface Temperature Monitoring System for Underground Tunnel Cable Joint using Wireless Sensor (무선센서를 이용한 지하전력구의 케이블 접속함 표면온도감시시스템 개발)

  • Kim, Young-Il;Song, Jae-Ju;Shin, Jin-Ho;Yi, Bong-Jae;Cho, Seon-Ku
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.11
    • /
    • pp.1879-1884
    • /
    • 2007
  • In the electric power industry, it is important that the supply of energy must be guaranteed. Many power utilities control and supervise the transmission line to avoid power failures. In case of underground tunnel, some troubles are reported in cable joint. To stabilize the power, it is needed to monitor the cable joint. Many researches of cable joint monitoring have been going on by partial discharge measurement and temperature measurement using optical cable. These methods need much cost to install and maintain, so it is only used in critical transmission line. In this research, we use wireless sensor technology, because of its low cost and easy installation. We develop the temperature monitoring system for cable joint. Temperature sensor is installed on the surface of cable joint and sends data to server through router node using wireless network. Generally Ad hoc routing is searched in wireless network. However, in this research, we design the static linear routing mechanism, which is suitable for electric power line monitoring and analyze the life time of the sensor node by measuring the amount of the battery consumption.

A Study of the Management of Groundwater Reservoir by Numerical Three Dimensional Flow Model (3차원 흐름모델을 이용한 지하저수지의 관리에 대한 연구)

  • 신방웅;김희성
    • The Journal of Engineering Geology
    • /
    • v.5 no.3
    • /
    • pp.289-300
    • /
    • 1995
  • At the initial stage of the underground reservoir design one should thoroughly consider surface and subsurface hydrology, hydrogeologic characteristics of aquifer system, and the function of cut - off wall because it is linked to the effective management. In this study, three dimensional finite difference model was applied to analyse the function of Ian underground reservoir at Kyungbuk Province. The steady and unsteady state conditions after construction of the underground dam were simulated through the model, and from these results the groundwater budget and the safe yield were determined. The model simulation indicates the infiltration of irrigation water to be one of the major factors of seasonal fluctuation of groundwater level. The recharge rates of irrigation water were estimated as 4.3mm/d during May and June, and 1.7mm/d during July and Agust. Groundwater recharge from the watershed area estimated to about $0.04m^3/s$, almost consistent through the year. In 1984, groundwater discharge through the transverse section of the dam was $0.002m^3/s$ and the optimum yield for two momths(July and Aguest)was $254000m^3$, however, the discharge became $0.013m^3/s$ in1993, implying the failure of cut -off function. without appropaiate of the cut - off wall, optiumum yield during the irrigaton period would be $93, 000m^3$.

  • PDF

Analysis of correlation between shield TBM construction field data and settlement measurement data (쉴드 TBM 시공데이터와 지반침하 계측데이터 간 상관성 분석)

  • Jung, Ye-Rim;Nam, Kyoung-Min;Kim, Han-Eol;Ha, Sang-Gui;Yun, Ji-Seok;Cho, Jae-Eun;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.79-94
    • /
    • 2022
  • The demand for tunnel construction is increasing as part of underground space development due to urban saturation. The shield TBM method minimizes vibration and noise and minimizes ground deformation that occurs simultaneously with excavation, and shield TBM is generally applied to tunnel construction in urban areas. The importance of urban ground settlement prediction is increasing day by day, and in the case of shield TBM construction, ground deformation is minimized, but ground settlement due to tunnel excavation inevitably occurs. Therefore, in this study, the correlation between shield TBM, which is highly applicable to urban areas, and ground settlement is analyzed to suggest the shield TBM construction factors that have a major effect on ground settlement. Correlation analysis was performed between the shield TBM construction data and ground settlement measurement data collected at the actual site, and the degree of correlation was expressed as a correlation coefficient "r". As a result, the main construction factors of shield TBM affecting ground settlement were thrust force, torque, chamber pressure, backfill pressure and muck discharge. Based on the results of this study, it is expected to contribute to the presentation of judgment criteria for major construction data so that the ground settlement can be predicted and controlled in advance when operating the shield TBM in the future.