• Title/Summary/Keyword: underground development

Search Result 1,084, Processing Time 0.024 seconds

Development of a Facility Management System for Underground Conduits Using Web Technologies (웹 기술을 이용한 지하 공동구의 시설물 관리 시스템 개발)

  • Ku, Kyong-I;Kim, Ji-Yoon;Ahn, Hyo-Jin;Kim, Joo-Sung;Kang, Jae-Mo;Kim, Youug-Jin;Kim, Yoo-Sung
    • Journal of Korea Spatial Information System Society
    • /
    • v.7 no.2 s.14
    • /
    • pp.29-38
    • /
    • 2005
  • Even though underground conduits have became important city-infra structures which should be exhaustively and efficiently managed, there is few systems which supports the well-defined facility management standards. Due to the lack of the supporting systems, experts must visit underground conduits scattered several cities over the country to see and check the status of the underground conduits including built-in facilities. This type of management gives us a little bit delayed status information at the end of so much time and money costs. In this paper, to solve this problem and manage the conduit synthetically, we developed a web-based facility management system for underground conduits by using information technologies. The developed management system has a simplified map drawing interface to depict the overall architectures and locations of underground conduits and their built-in facilities into sketch maps. And, the system uses the 3D panorama image technology with zooming functions in addition to still images and video images to give the feeling of a spot inspection. Moreover, since the system accumulates the data of repair/reinforcement, occasional inspections and safety diagnosis, conduit managers can synthetically and effectively manage the facilities within underground conduits and themselves.

  • PDF

Development of numerical model for estimating thermal environment of underground power conduit considering characteristics of backfill materials (되메움재 특성을 고려한 전력구 열환경 변화 예측 수치해석모델 개발)

  • Kim, Gyeonghun;Park, Sangwoo;Kim, Min-Ju;Lee, Dae-Soo;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.121-141
    • /
    • 2017
  • The thermal analysis of an underground power conduit for electrical cables is essential to determine their current capacity with an increasing number of demands for high-voltage underground cables. The temperature rises around a buried cable, caused by excessive heat dissipation, may increase considerably the thermal resistance of the cables, leading to the danger of "thermal runaway" or damaging to insulators. It is a key design factor to develop the mechanism on thermal behavior of backfilling materials for underground power conduits. With a full-scale field test, a numerical model was developed to estimate the temperature change as well as the thermal resistance existing between an underground power conduit and backfill materials. In comparison with the field test, the numerical model for analyzing thermal behavior depending on density, moisture content and soil constituents is verified by the one-year-long field measurement.

Development of IT-based tunnel design system (IT 기반의 터널 최적 설계를 위한 시스템 개발)

  • Yoo, Chung-Sik;Kim, Sun-Bin;Yoo, Kwang-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.2
    • /
    • pp.153-166
    • /
    • 2008
  • This paper concerns the development of a knowledge-based tunnel design system within the framework of artificial neural networks (ANNs). The system is aimed at expediting a routine tunnel design works such as determination of support patterns and stability analysis of selected support patterns. A number of sub-modules for determination of support patterns and stability assessment were developed and implemented to the system. It is shown that the ANNs trained with the results of 2D and 3D numerical analyses can be generalized with a reasonable accuracy, and that the ANN based tunnel design concept is a robust tool for tunnel design optimization. The details of the system architecture and the ANNs development are discussed in this paper.

  • PDF

Study on Displacement Behavior of Abandoned Mine Goaf Cave According to Filling Factor (충전율에 따른 폐광산 채굴적 공동의 변위거동에 관한 연구)

  • Kim, Dong-Rak;Seo, In-Shik
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.14 no.4
    • /
    • pp.151-156
    • /
    • 2011
  • The domestic mine development community the countermeasure establishment is insufficient about ground sinkage, not only the mine which is a in line is partial from the mine of the most which has become the rest mine and abandoned mine or the index sinkage occurs. The ground sinkage which occurs from the abandoned mine area most after operation is stopped, a long time passes and accurately predicts an occurrence location and a time with the residual sinkage which occurs, is difficult. Underground goaf of the abandoned mine and the closed shaft When considering the potentiality which causes the instability of ground, is a possibility of reaching a damage in the ground infrastructure or life. The underground shaft which is formed specially with mine development and goaf operates with the obstacle factor in the development project of the mine area, the ground sinkage which is caused by with sinkage, operates with the large safety accident occurrence factor where the important infrastructure of the railroad, road, residential area etc. is damaged. Therefore, In this paper, the goaf cave of the abandoned mine area, for the displacement behavior according to the filling factor of the material is to analyze the numerical analysis.

An Experimental Study on the Strength-Development Properties of Mortar with Discarded Bentonite Powder (폐 벤토나이트 분말을 흔입한 모르터의 강도 발현 특성에 관한 실험적 연구)

  • 정민수;김효열;안재철;강병희
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.23.2-29
    • /
    • 2003
  • As the bentonite is main material to prevent from collapse of drilling hole at underground excavation works, the quantity of bentonite is increasingly used on construction industry day by day. But, the discarded bentonite that is excessively used at underground excavation works causes various environmental trouble such as soil and water pollution etc. Therefore, this study aims to propose a foundamental report about pozzolan reaction of discarded Bentonite powder by heat-treatment and cooling as concrete mineral admixture. To find out the strength-development properties of mortar with discarded Bentonite powder by indirect cooling & cooling using of water after heat-treatment, the experiments such as flow test, and compressive strength test on curing age of mortar are excuted. As a result of this study, discarded Bentonite powder can be utilized as concrete mineral admixture by heat-treatment and especially, the strength-development properties of mortar mixing with discarded Bentonite powder is superior to the situation of $600^{\circ}C$.60min-cooling using of water.

  • PDF

Intelligent cooling control for mass concrete relating to spiral case structure

  • Ning, Zeyu;Lin, Peng;Ouyang, Jianshu;Yang, Zongli;He, Mingwu;Ma, Fangping
    • Advances in concrete construction
    • /
    • v.14 no.1
    • /
    • pp.57-70
    • /
    • 2022
  • The spiral case concrete (SCC) used in the underground powerhouse of large hydropower stations is complex, difficult to pour, and has high requirements for temperature control and crack prevention. In this study, based on the closed-loop control theory of "multi-source sensing, real analysis, and intelligent control", a new intelligent cooling control system (ICCS) suitable for the SCC is developed and is further applied to the Wudongde large-scale underground powerhouse. By employing the site monitoring data, numerical simulation, and field investigation, the temperature control quality of the SCC is evaluated. The results show that the target temperature control curve can be accurately tracked, and the temperature control indicators such as the maximum temperature can meet the design requirements by adopting the ICCS. Moreover, the numerical results and site investigation indicate that a safety factor of the spiral case structure was sure, and no cracking was found in the concrete blocks, by which the effectiveness of the system for improving the quality of temperature control of the SCC is verified. Finally, an intelligent cooling control procedure suitable for the SCC is proposed, which can provide a reference for improving the design and construction level for similar projects.

Determination of Proto Type for 345kV CV Cable Accessories (345kV CV 케이블 접속함의 Proto Type 선정)

  • Lee, S.K.;Kim, I.T.;Son, S.H.;Choi, S.G.;Huh, G.D.;Park, W.K.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07e
    • /
    • pp.1629-1631
    • /
    • 1998
  • Crosslinked polyethylene (XLPE) insulated cables are now widely used all over the world for extra-high voltage underground transmission systems. Prefabricated type (compression type) joint has developed in order to shorten the assembly time and lower the possibility of contamination at site by many companies in the world. For outdoor termination, to control the electric field distribution as uniform as possible, especially for the use of extra-high voltage system. much of products are adopting the oil-impregnated condensor cone type instead of electric field control element which uses the permitivity of it only (not capacitance). For Gas-immersed termination, dimension of outer insulation bushing was determined by IEC Publication 859. The highest voltage of underground power cable system is 345kV now, in Korea. We have much of experiences of the development of prefabricated type accessories for CV cable systems (154kV, 161kV, 230kV level). So it was possible to inspect the proto type of accessories for 345kV CV cable system and seems that the need time for the development of products is reduced.

  • PDF

Development of Oil Filled Power Cable for 345kV Line (345 kV OF cable의 개발)

  • Han, K.M.;Choi, M.K.;Lee, I.H.
    • Proceedings of the KIEE Conference
    • /
    • 1988.11a
    • /
    • pp.224-228
    • /
    • 1988
  • Extensive development work which was carried out by Gold Star Cable Co., Ltd. has led to the optimal design, manufacture and test of fully engineered cable system for 345 kV self- contained oil filled (OF) underground cable. Details of design criteria and of tests are given. development of 345kV OF cable results in sucessful operations for ultra-high voltage power transmission requirement.

  • PDF

A Study on the Basic Geometry Analysis of Abandoned Underground Mine Tunnels in Korea and Advanced Measuring-Analysis Technology for Underground Mine Cavities (한국의 폐광산 지하 채굴갱도 기초형상 분석 및 개선된 광산 지하공동 측정·분석 기술 연구)

  • Kim, Soo-Lo;Park, Sung-Bin;Choi, Byung-Hee;Yun, Jung-Mann;Jeong, Gyo-Cheol
    • Tunnel and Underground Space
    • /
    • v.26 no.6
    • /
    • pp.455-465
    • /
    • 2016
  • The collapse of underground mine development void for mineral resources can cause the subsidence of ground surface. In order to prevent the subsidence of ground, data such as maps or pictures of past mining site is important information for current mine reclamation works. In particular, mine subsidence management was based on mining maps and pictures. The process of the mining area surveys, safety evaluation, and ground reinforcement are normally possible with information such as maps and pictures in past mining. During the Japanese colonial period and 1960's, a lot of mines were developed in Korea indiscriminately. However, mining information at that time is limited to use. In the future, mining information will become even more rare. MIRECO intends to establish a realistic alternative solution. In this study, the basic numerical information of developed mine tunnels in Korea is statistically reviewed, and advanced underground cavity measuring technology was studied. 4,473 mine tunnel opening data of 1,784 abandoned mines in korea were collected and sorted. As a result of the analysis, the average value of small mine tunnel openings in Korea was 1.982 m in height and 1.959 m in width. The mean value of shape factor was analyzed as 0.485. The summary of these numerical mine data will be helpful for understanding and researching Korean abandoned mines. Therefore, the development of measurement technology for abandoned mine cavities and tunnels is expected to facilitate more effective mine subsidence management works in Korea.

A Case Study on Predicting and Analyzing Inflow Sources of Underground Water in a Limestone Mine (석회석 광산 갱내수 유입원 예측분석 사례연구)

  • Minkyu Lee;Sunghyun Park;Hwicheol Ko;Yongsik Jeong;Seon-hee Heo
    • Tunnel and Underground Space
    • /
    • v.33 no.5
    • /
    • pp.388-398
    • /
    • 2023
  • The changes in groundwater flow due to mining development act as a contributing factor to major issues such as ground subsidence, strength reduction and collapse. For the sustainable mining development, measures for dealing with fluctuations in seasonal underground water inflow, power losses, pump damage, and unexpected increases in inflow must be put in place. In this study, the aim is to identify the causes of underground seepage through the examination of hydrological connectivity between the study area and nearby limestone mine. A tracer tes for assessing subsurface connectivity has been planned. A variety of tracers, such as dyes and ions, were applied in lab test to select the optimal tracer material, and a hydrological model of the study area was implemented through field test. Finally, the hydrological connectivity between the external stream and underground water in the mine was analyzed.