• Title/Summary/Keyword: uncertain time delay

Search Result 123, Processing Time 0.032 seconds

Design of Robust Controller for Uncertain Large-scale Systems with Time-delays (시간지연을 갖는 불확정성 대규모 시스템의 강인 제어기 설계)

  • Lee, Hui-Song;Kim, Jin-Hun
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.49 no.1
    • /
    • pp.26-32
    • /
    • 2000
  • In this paper, we consider to robust controller design problem for the linear large scale systems with the uncertainties and the time-delays. The considered time-delays are that exist in the state and the input of the subsystems and the interconnected subsystems. And the considered uncertainties are two general types that exist in the system, input and interconnected matrices. Based on the linear matrix inequality(LMI) and Lyapunov theorem, we present sufficient conditions for the existence of a controller that guarantees the asymptotic stability of systems regardless of the uncertainties and the time-delays. Also, the controller can be easily obtained by checking the feasibility of the LMI's. Finally, we show the usefulness of our results by an example.

  • PDF

A Study on the Reformation of the Contract Time Extension Process in the Public Construction projects (공공건설사업에서 계약기간 연장처리방법 개선에 관한 연구)

  • Cho Young-Jun;Lee Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.81-89
    • /
    • 2005
  • Delay schedule coming about duration extension is happening essentially because public construction project consist of many sub contractor. The method which can calculate delay day is suggested by many studies in case of happing delay schedule, but It is difficult to apply to real construction project because there is no mention about the control of The law of contract according to delay schedule. The law of Contract which is cost of account has more uncertain problem than FIDIC condition of contract. This study suggests method which can make extension of duration procedure clear in case of happing the reason of design change related with activity duration during carrying on construction, and a submission process of the reason of duration extension and modify schedule making way about section which is basis of calculating contract amount clear.

Study on Timing Failures in Cyber-Physical Systems

  • Kong, Joon-Ik
    • International journal of advanced smart convergence
    • /
    • v.11 no.3
    • /
    • pp.56-63
    • /
    • 2022
  • Cyber-physical systems (CPSs) can solve real problems by utilizing closely connected resources in the cyber world. Most problems arise because the physical world is uncertain and unpredictable. To address this uncertainty, information pouring from numerous devices must be collected in real-time, and each interconnected device must share the information. At this time, CPS must meet timing-related techniques and strict timing constraints that can deliver accurate information within predefined deadlines in order to interact closely beyond simply connecting the cyber and physical worlds. Timing errors in safety-critical systems, such as automobiles, aviation, and medical systems, can lead to catastrophic disasters. In this paper, we classify timing problems into two types: real-time delay and synchronization problems. The results of this study can be used in the entire process of CPS system design, implementation, operation, verification, and maintenance. As a result, it can contribute to securing the safety and reliability of CPS.

Energy-efficient Joint Control of Epidemic Routing in Delay Tolerant Networks

  • Wu, Yahui;Deng, Su;Huang, Hongbin
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.7 no.2
    • /
    • pp.234-252
    • /
    • 2013
  • Due to the uncertain of connections in Delay Tolerant Networks (DTNs), most routing algorithms in DTNs need nodes to forward the message to others based on the opportunistic contact. The contact is related with the beaconing rate. In particular, nodes have more chances to encounter with each other with bigger beaconing rate, but more energy will be used. On the other hand, if the nodes forward the message to every node all the time, the efficiency of the routing algorithm is better, but it needs more energy, too. This paper tries to exploit the optimal beaconing rate and forwarding rate when the total energy is constraint. First, a theoretical framework is proposed, which can be used to evaluate the performance with different forwarding rate and beaconing rate. Then, this paper formulates a joint optimization problem based on the framework. Through Pontryagin's Maximal Principle, this paper obtains the optimal policy and proves that both the optimal forwarding and beaconing rates conform to threshold form. Simulation results show the accuracy of the theoretical framework. Extensive numerical results show that the optimal policy obtained in this paper is the best.

Design of Optimized Interval Type-2 Fuzzy Controller and Its Application (최적 Interval Type-2 퍼지 제어기 설계 및 응용)

  • Jang, Han-Jong;Oh, Sung-Kwun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.8
    • /
    • pp.1624-1632
    • /
    • 2009
  • In this study, we introduce the design methodology of an optimized Interval Type-2 fuzzy controller. The fixed MF design of type-1 based FLC leads to the difficulty of rule-based control design for representing the linguistically uncertain expression. In the Type-2 FLC as the expanded type of Type-1 FLC, we can effectively improve the control characteristic by using the footprint of uncertainty(FOU) of membership function. Type-2 FLC has a robust characteristic in the unknown system with unspecific noise when compared with Type-1 FLC. Through computer simulation as well as practical experiment, we compare their performance by applying both the optimized Type-1 and Type-2 fuzzy cascade controllers to ball and beam system. To evaluate each controller performance, we consider controller characteristic parameters such as maximum overshoot, delay time, rise time, settling time and steady-state error.

The Development of Convenient RQ Measuring Device for Patients Real Time Monitoring (환자의 실시간 모니터링을 위한 간편한 RQ 측정기기의 개발)

  • Kim, Y.S.;Jeon, H.M.;Choi, S.W.;Shim, E.B.
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.1609-1612
    • /
    • 2008
  • RQ(Respiratory Quotient) value is obtained from the ratio of the consumed oxygen and the produced carbon dioxide during the patient's respiration. To investigate the efficacy of insulin and diagnosis the metabolic disorder in short time, the RQ value can be used as important parameter. The measurement of oxygen and carbon dioxide amounts is needed large chamber and complex sensors. But If the atmospheric oxygen and carbon dioxide concentrations do not change, the expiratory oxygen and carbon dioxide can be used to obtain RQ value. A convenient RQ measuring device has been developed by using two sensors for O2 and CO2. The estimation of RQ devices confirms that the RQ device can obtain accurate data by eliminating uncertain factor such as delay time and remaining gases.

  • PDF

Time to Invest in Real Asset with Option Pricing Theory - Focused on REITs - (옵션가격결정이론에 기반한 실물자산의 투자시기 결정 - 부동산투자신탁회사(REITs)를 중심으로 -)

  • Jun, Jae-Bum;Lee, Sam-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.54-64
    • /
    • 2010
  • A firm decides to go to the project based on its investment analysis. However, the cash flows generated from the real project can not be always coincident with what expected as it follows uncertain behavior and the asymmetric payoff caused by the managerial flexibilities involved in the real asset affects the project value. Amongst various managerial flexibilities entailed in most of the real assets, although investment delay has been known to enhance the project value thanks to its ability to provide new market information to management, the related research to select the time to invest have been just few. Therefore, this research aims to show the theoretical framework to decide when to invest reflecting the behaviors of increasing project value and loss recovery cost due to investment delay with option pricing, related financial economic, and variational theories.

Robust $H_{\infty}$ Control of Discrete Uncertain Systems with Time Delays in States and Control Inputs (상태와 제어입력에 시간지연을 가지는 이산 불확실성 시스템의 견실 $H_{\infty}$ 제어)

  • Jong Hae Kim;Hong Bae Park
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.4 no.6
    • /
    • pp.689-694
    • /
    • 1998
  • 본 논문에서는 상태와 제어입력에 시간지연을 가지는 이산 불확실성 시스템의 견실 H/sub ∞/ 상태궤환 제어기 설계문제를 다룬다. 동일한 제어기에 대해서, 파라미터 불확실성을 가지는 시간지연 시스템이 자승적 안정성(quadratic stability)과 폐루프 시스템의 H/sub ∞/ 노옴의 한계를 유지하면서 파라미터 불확실성이 없는 등가의 시스템으로 변형된다. 그리고 주어진 이산 불확실성 시간지연 시스템의 견실 H/sub ∞/ 상태궤환 제어기가 존재할 충분조건과 제어기 설계 알고리듬을 제시한다. 또한 변수치환과 Schur 여수(complement) 정리를 이용하면 구한 충분조건은 LMI(linear matrix inequality) 형태로 쓸 수 있다. 예제를 통하여 제시한 결과의 타당성을 보인다.

  • PDF

A Robust Disturbance Observer for Uncertain Linear Systmes (불확실한 성형시스템에 대한 강인 외란관측기)

  • Kim, Jun-Sik;O, Jun-Ho
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.20 no.9
    • /
    • pp.2731-2743
    • /
    • 1996
  • When modeling error is large of plant is time-varying, it is hard to obtain good robust performance and robust stability by conventional contorl methods. Here, we need to design a robust controller bearing modeling error. In this paper, based on recently developed Time Delay Control(TDC) and Disturbance Observer the output feedback Robust Disturbance Observer(RDO), which is easily combined with general linear control, is proposed. Proposed RDO is derived from extending the main idea of Disturbance Observer to multi-input multi-output linear system. RDO solves robust stability problem of Disturbance Observer and has the robust performance same as nominal performance. RDO controlled dual stage positioning system shows excellent robust performance.

Linkage of Hydrological Model and Machine Learning for Real-time Prediction of River Flood (수문모형과 기계학습을 연계한 실시간 하천홍수 예측)

  • Lee, Jae Yeong;Kim, Hyun Il;Han, Kun Yeun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.3
    • /
    • pp.303-314
    • /
    • 2020
  • The hydrological characteristics of watersheds and hydraulic systems of urban and river floods are highly nonlinear and contain uncertain variables. Therefore, the predicted time series of rainfall-runoff data in flood analysis is not suitable for existing neural networks. To overcome the challenge of prediction, a NARX (Nonlinear Autoregressive Exogenous Model), which is a kind of recurrent dynamic neural network that maximizes the learning ability of a neural network, was applied to forecast a flood in real-time. At the same time, NARX has the characteristics of a time-delay neural network. In this study, a hydrological model was constructed for the Taehwa river basin, and the NARX time-delay parameter was adjusted 10 to 120 minutes. As a result, we found that precise prediction is possible as the time-delay parameter was increased by confirming that the NSE increased from 0.530 to 0.988 and the RMSE decreased from 379.9 ㎥/s to 16.1 ㎥/s. The machine learning technique with NARX will contribute to the accurate prediction of flow rate with an unexpected extreme flood condition.