• Title/Summary/Keyword: twin tunnel

Search Result 104, Processing Time 0.027 seconds

A Study on the Dataset Structure of Digital Twin for Disaster and Safety Management (재난안전관리를 위한 디지털 트윈 데이터셋 구조 연구)

  • Ki-Sook Chung;Woo-Sug Jung
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.23 no.5
    • /
    • pp.89-95
    • /
    • 2023
  • The underground utility tunnel is an urban infrastructure that accommodates and manages important facilities such as water and sewage, electricity, and communication in the city, and is a national facility that needs to be protected from disasters such as fire, earthquake, and flooding. In establishing a disaster safety life cycle management system such as prediction, prevention, preparedness, response, and recovery, a disaster safety management platform for underground utility tunnel is being developed by utilizing digital twin technology in which advanced ICT technology and data are converged. In this paper, the maturity model for the disaster safety digital twin was reviewed, and the datasets necessary for implementing the digital twin at each stage were defined.

Settlement behaviours and control measures of twin-tube curved buildings-crossing shield tunnel

  • Jianwei, Jia;Ruiqi, Gao;Defeng, Wang;Jianjun, Li;Ziwen, Song;Jinghui, Tan
    • Structural Engineering and Mechanics
    • /
    • v.84 no.5
    • /
    • pp.699-706
    • /
    • 2022
  • Settlement control techniques are critical for the safety of shield tunnel constructions, especially for facing complex situations. In this study, the shield tunnel structure from Huaita east road station to Heping Road station in Xuzhou metro No.3 line (China) is taken as engineering background, which has various complex problems of the upper-soft and lower-hard composite stratum conditions, twin curve shield tunnels, and underpass the foundation of the piled raft. The deformation characteristics of shield tunnelling passing through buildings are explored. Subsequently, comprehensive research methods of numerical simulation and field measurement are adopted to analyzing the effectiveness of settlement control by using the top grouting technique. The results show that the settlement of the buildings has obvious spatial characteristics, and the hysteresis effect can be obviously observed in soil deformation caused by shield construction. Meanwhile, the two shield constructions can cause repeated disturbances, reducing the soil deformation's hysteresis effect. Moreover, the shield tunnel's differential settlement is too large when a single line passes through, and the shield construction of the outer curve can cause more significant disturbance in the tunnel than the inside curve. Notably, the proposed process control parameters and secondary topgrouting method can effectively control the deformation of the shield tunnel, especially for the long-term deformation.

Trajectory Optimization for Autonomous Berthing of a Twin-Propeller Twin-Rudder Ship

  • Changyu Lee;Jinwhan Kim
    • Journal of Ocean Engineering and Technology
    • /
    • v.37 no.3
    • /
    • pp.122-128
    • /
    • 2023
  • Autonomous berthing is a crucial technology for autonomous ships, requiring optimal trajectory planning to prevent collisions and minimize time and control efforts. This paper presents a two-phase, two-point boundary value problem (TPBVP) strategy for creating an optimal berthing trajectory for a twin-propeller, twin-rudder ship with autonomous berthing capabilities. The process is divided into two phases: the approach and the terminal. Tunnel thruster use is limited during the approach but fully employed during the terminal phase. This strategy permits concurrent optimization of the total trajectory duration, individual phase trajectories, and phase transition time. The efficacy of the proposed method is validated through two simulations. The first explores a scenario with phase transition, and the second generates a trajectory relying solely on the approach phase. The results affirm our algorithm's effectiveness in deciding transition necessity, identifying optimal transition timing, and optimizing the trajectory accordingly. The proposed two-phase TPBVP approach holds significant implications for advancements in autonomous ship navigation, enhancing safety and efficiency in berthing operations.

Next Generation Smart-City Facility Platform and Digital Chain (차세대 스마트도시 시설물의 플랫폼 정의와 디지털 체인)

  • Yang, Seung-Won;Kim, Jin-Wooung;Kim, Sung-Ah
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.11-21
    • /
    • 2020
  • With increasing interest and research on smart cities, there is also an increasing number of studies on urban facilities that can be built within smart cities. According to these studies, smart cities' urban facilities are likely to become high value-added industries. However, the concept of smart city is not clear because it involves various fields. Therefore, in this study, the definition of Next-Generation(N.G) Smart City Facilities with Digital Twin and Digital Chain is carried out through a multidisciplinary approach. Based on this, Next-Generation Smart City Facilities will be divided into High Value-Added Products and Big Data Platforms. Subsequently, the definition of the Digital Chain containing the data flow of the entire process built through the construction of the Digital Twin proceeds. The definitions derived are applied to the Next-Generation Noise Barrier Tunnel to ensure that data is exchanged at the Digital Twin stage, and to review the proposed configuration of the Digital Chain and Data Flow in this study. The platform definition and Digital Chain of Next-Generation Smart City Facilities proposed in this study suggest that it can affect not only the aspects of data management that are currently in the spotlight, but also the manufacturing industry as a whole.

A Study on the Stability of Twin Tunnels in Anisotropic Rocks Using Scaled Model Tests (이방성 암반내 쌍굴터널의 안정성에 대한 모형실험 연구)

  • Kim, Jong-Woo;Kim, Myeong-Kyun
    • Tunnel and Underground Space
    • /
    • v.22 no.3
    • /
    • pp.205-213
    • /
    • 2012
  • In this study, scaled model tests were performed to investigate the stability of twin tunnels constructed in anisotropic rocks with $30^{\circ}$ inclined bedding planes under the condition of lateral pressure ratio, 2. Five types of test models which had respectively different pillar widths and shapes of tunnel sections were experimented, where both crack initiating pressures and deformation behaviors around tunnels were investigated. The models with shallower pillar width showed shear failure of pillar according to the existing bedding planes and they were cracked under lower pressure than the models with thicker pillar width. In order to find the effect of tunnel sectional shape on stability, the models with four centered arch section, circular section and semi-circular arch section were experimented. As results of the comparison of the crack initiating pressures and the deformation behaviors around tunnels, the semi-circular arched tunnel model was the most unstable whereas the circular tunnel model was the most stable among them. Furthermore, the results of FLAC analysis were qualitatively coincident with the experimental results.

Seismic behaviors of twin tunnel with flexible segment (Flexible Segment가 설치된 병렬터널의 지진시 동적거동)

  • Kwak, Chang-Won;Park, Inn-Joon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.6
    • /
    • pp.695-702
    • /
    • 2015
  • Recently, the improvement of mechanical and theoretical issues in geo-centrifuge test enhances the applicability and accuracy of the test. Geo-centrifuge test is appropriate to simulate the behaviors of underground structures like tunnel, since tunnel interacts with the soil and/or rock around it and the test can embody the in-situ stress conditions effectively. In this study, the seismic behaviors of twin tunnel were analyzed based on geo-centrifuge test. Flexible segment to mitigate seismic acceleration were implemented in the model with thin and thick thickness. Based on the test results, it was found that flexible segment can decrease the peak acceleration generally, however, thin flexible segment was not able to reduce peak acceleration in short-period seismic wave. Thick flexible segment was more effective in case of high bedrock acceleration condition. Additionally, 3-dimensional numerical analysis was performed to verify the characteristics of seismic behavior and the effect of flexible segment. Consequently, the numerical analysis result showed good agreement with the test result.

Case study on design and construction for cross-connection tunnel using large steel pipe thrust method in soil twin shield tunnels underneath airport (공항하부 토사 병설 쉴드터널에서 대구경 강관추진에 의한 횡갱 설계/시공사례 연구)

  • Ahn, Chang-Yoon;Park, Duhee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.325-337
    • /
    • 2021
  • On the road and rail tunnels, the evacuation pathway and facilities such as smoke-control and fire suppression system are essential in tunnel fire. In the long twin tunnels, the cross-connection tunnel is usually designed to evacuate from the tunnel where the fire broke out to the other tunnel. In twin shield tunnels, the segment lining has to be demolished to construct the cross-connection tunnel. Considering the modern shield TBM is mostly the closed chamber type, the exposure of underground soil induced by removal of steel segment lining is the most danger construction step in the shield tunnel construction. This case study introduces the excavation method using the thrust of large steel pipe and reviews the measured data after the construction. The large steel pipe thrust method for the cross-connection tunnel can stabilize the excavated face with the two mechanisms. Firstly, the soil in front of excavated face is cylindrically pre-supported by the large steel pipe. Secondly, the excavated face is supported by the plugging effect caused by the soil pressed into the steel pipe. It was reviewed that the large steel pipe thrust method in the cross-connection tunnel is enough to secure the construct ability and stability in soil from the measurement results about the deformation and stress of steel pipe.

Wind tunnel investigation of correlation and coherence of wind loading on generic tall twin buildings in close proximity

  • Lim, Juntack;Bienkiewicz, Bogusz
    • Wind and Structures
    • /
    • v.18 no.4
    • /
    • pp.443-456
    • /
    • 2014
  • A popular modern architectural form for tall buildings is two (or more) towers which are structurally linked through such features as a shared podium or sky-bridges. The fundamental features of the wind loading and the structural links of such buildings can be studied by measuring load components on the individual unlinked towers along with their correlations. This paper describes application of dual high frequency force balance (DHFFB) in a wind tunnel study of the base wind loading exerted on generic tall twin buildings in close proximity. Light models of two identical generic tall buildings of square plan were mounted on DHFFB and the base wind loading exerted on the buildings was simultaneously acquired. The effects of the relative positions of the buildings on the correlations and coherences involving loading components on each building and on the two buildings were investigated. For some relative positions, the effects of the building proximity on the wind loading were significant and the loading was markedly different from that exerted on single buildings. In addition, the correlations between the loadings on the two buildings were high. These effects have potential to significantly impact, for example, the modally-coupled resonant responses of the buildings to the aerodynamic excitations. The presented results were not meant to be recommended for direct application in wind resistant design of tall twin buildings. They were intended to show that wind loading on tall buildings in close proximity is significantly different from that on single buildings and that it can be conveniently mapped using DHFFB.

Determination of effective parameters on surface settlement during shield TBM

  • Kim, Dongku;Pham, Khanh;Park, Sangyeong;Oh, Ju-Young;Choi, Hangseok
    • Geomechanics and Engineering
    • /
    • v.21 no.2
    • /
    • pp.153-164
    • /
    • 2020
  • Tunnel excavation in shallow soft ground conditions of urban areas experiences inevitable surface settlements that threaten the stability of nearby infrastructures. Surface settlements during shield TBM tunneling are related to a number of factors including geotechnical conditions, tunnel geometry and excavation methods. In this paper, a database collected from a construction section of Hong Kong subway was used to analyze the correlation of settlement-inducing factors and surface settlements monitored at different locations of a transverse trough. The Pearson correlation analysis result revealed a correlation between the factors in consideration. Factors such as the face pressure, advance speed, thrust force, cutter torque, twin tunnel distance and ground water level presented a modest correlation with the surface settlement, while no significant trends between the other factors and the surface settlements were observed. It can be concluded that an integrated effect of the settlement-inducing factors should be related to the magnitude of surface settlements.

Stability Estimation of the Pillar between Twin Tunnels Considering Various Site Conditions (다양한 현장조건을 고려한 병설터널 필라의 안정성평가)

  • Kim, Ju-Hwan;Kim, Jong-Woo
    • Tunnel and Underground Space
    • /
    • v.27 no.2
    • /
    • pp.109-119
    • /
    • 2017
  • A lot of twin tunnels were modelled with different pillar widths, rock mass classes and stress ratios in order to consider various site conditions, and the stabilities of the pillars were estimated by numerical analyses and scaled model tests. The strength-stress ratios of the pillar were obtained from three different methods which were using the stresses appeared at the middle point, the whole average and the left/right edges of the pillar. The strength-stress ratio of the pillar edges showed relatively conservative values among them, and it was also practically consistent with the tunnel excavating steps comprising the construction sequence analyses which included the partial excavation and the support system. Scaled model tests were also performed to investigate the tunnel stability, where it was found that cracks were progressively generated from the pillar edges toward the middle point of the pillar. Therefore, in order to both prevent the local damage of pillar and conservatively estimate the tunnel stability, it was thought to be an appropriate method using the strength-stress ratio obtained from the left/right edges of the pillar.