• Title/Summary/Keyword: tunnel safety analysis

Search Result 549, Processing Time 0.024 seconds

A feasibility study on the estimation of a potential relaxed zone in the discontinuum coupled analysis of a subsea tunnel (해저터널의 불연속체 연계해석 시 잠재적 이완영역 평가 방법의 타당성 연구)

  • You, Kwang-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.141-150
    • /
    • 2009
  • When constructing a subsea tunnel in discontinuous rock mass, fluid flow in joints has a great influence on the behavior of the tunnel so that hydro-mechanical coupled analysis should be performed for the stability estimation. In practice, relaxed rock load is generally used for the design of tunnel concrete lining. In a continuum analysis, a method based on the distribution of local safety factor around a tunnel was proposed for the estimation of a potential relaxed zone. However, in the case of discontinuous rock mass in which joints are developed, the whole stability of tunnels depends on the behavior of the joints. In this study, therefore, a method is proposed for the estimation of a potential relaxed zone occurred by the excavation of a tunnel in discontinuous rock mass. The suggested method is validated by sensitivity analysis and the comparison with the results of continuum analysis.

Three-dimensional limit analysis of seismic stability of tunnel faces with quasi-static method

  • Zhang, B.;Wang, X.;Zhang, J.S.;Meng, F.
    • Geomechanics and Engineering
    • /
    • v.13 no.2
    • /
    • pp.301-318
    • /
    • 2017
  • Based on the existing research results, a three-dimensional failure mechanism of tunnel face was constructed. The dynamic seismic effect was taken into account on the basis of quasi-static method, and the nonlinear Mohr-Coulomb failure criterion was introduced into the limit analysis by using the tangent technique. The collapse pressure along with the failure scope of tunnel face was obtained through nonlinear limit analysis. Results show that nonlinear coefficient and initial cohesion have a significant impact on the collapse pressure and failure zone. However, horizontal seismic coefficient and vertical seismic proportional coefficient merely affect the collapse pressure and the location of failure surface. And their influences on the volume and height of failure mechanism are not obvious. By virtue of reliability theory, the influences of horizontal and vertical seismic forces on supporting pressure were discussed. Meanwhile, safety factors and supporting pressures with respect to 3 different safety levels are also obtained, which may provide references to seismic design of tunnels.

A study on the stability analysis for double deck tunnel branch geometry (복층터널 분기 기하구조에 따른 안정성 검토에 관한 연구)

  • Park, Woo-Jeong;Jang, Namju;Kim, Kihwan;Choi, Chang-rim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.393-404
    • /
    • 2018
  • The tunnel can be planned to connect to underground roadway and surface road. The large tunnel and branch section are made when the ramp tunnel access to the main tunnel. In the branch section, stress concentration can be assigned and it can be very important for the stability of the tunnel. This study assessed the behavior of rock pillar in double deck tunnel diverging area by using a two dimensional numerical analysis. This study evaluated different safety factors according to pillar width and the ramp tunnel position in branch. By the assessment of the strength-stress ratio, tunnel pillar width is suggested in order to secure the safety factor 1.5.

Comparison and validation on shotcrete modelling method for the quantitative stability estimation of a tunnel (터널의 정량적 안정성 평가를 위한 숏크리트 모델링 방법 비교 검증에 관한 연구)

  • You, Kwang-Ho;Lee, Min-Ho;Park, Yeon-Jun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.2
    • /
    • pp.99-107
    • /
    • 2007
  • A method was suggested by You et al. (2000) to calculate safety factor of a tunnel based on numerical analysis with the shear strength reduction technique. In the method, the shotcrete is assumed to fail when its stress exceeds the allowable stress. The proposed method had been steadily developed by You et al. (2005) and Han et al. (2006). In this study, the previous routine was corrected so that tunnel construction sequences could be considered in calculating the safety factor of a tunnel. In addition, a proper way to model shotcrete is to be suggested by comparing with the previous studies.

  • PDF

Safety analysis for the tunnel adjacent to the pier (교각에 근접한 터널의 안정성 평가)

  • Lee, Sun-Bok;Yoon, Ji-Son
    • Journal of the Korean Geophysical Society
    • /
    • v.7 no.4
    • /
    • pp.313-324
    • /
    • 2004
  • The finite element method and statistics of the convergence measurement are useful method of the stability analysis of the tunnel adjacent to the pier. It is the purpose of the this case study to certificate of validity of the application of those methods. The safety of the pilot tunnel method and LW pre-grouting has been evaluated from the FEM analysis. The three-dimensional finite element method is carried out for the decision of the level of stress redistribution at the two-dimensional numerical analysis. An analysis of the convergence is carried out by the estimation of preceding convergence at tunnel excavation. F-examination is applied for this estimation. As results of that analysis, The F-value is from 10.81 to 158.74 and the coefficient of determination is from 0.82 to 0.99. An analysis of convergence is carried out by using regression analysis. Consequently, it is shown that the convergence can be modeled as following function C(t) = a[1-exp(-bt)].

  • PDF

Case Study on the Impact-Echo Method for Tunnel Safety Diagnosis (터널 안전진단을 위한 충격반향법 사례 연구)

  • Shin, Sung-Ryul;Jo, Cheol-Hyun
    • Tunnel and Underground Space
    • /
    • v.19 no.1
    • /
    • pp.19-30
    • /
    • 2009
  • For the purpose of determining the thickness of concrete lining and detect of the cavity where may be located behind tunnel lining, IE (Impact-Echo) method it effectively useful in the tunnel safety diagnosis and the quality control during the construction. As a part of case study, we applied IE method to various tunnel structure types such as road tunnel and subway tunnel constructed by NATM (New Austrian Tunnelling Method) and ASSM (American Steel Support Method). As tunnel specifications estimated from this method were compared with coring data, design drawing and other survey results, it was very good agreement with each other. In conclusion, we verified that IE method shows an accurate and reliable result. The conventional interpretation of IE method in frequency domain gives only vertical information at a certain point. However, the interpretation using time-frequency analysis and depth section imaging technique from two dimensional profiling surveys can show more reliable information about structure inside.

Numerical Analysis of Utility Tunnel Movement under Reclamation Ground (매립지반 지하공동구의 수평이동원인에 대한 수치해석적 분석)

  • Yoon, Woo Hyun;Hwang, Chulsung
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.5
    • /
    • pp.35-40
    • /
    • 2013
  • Recently reclamation land is largely developed to utilize the land according to economic growth. The soil of landfill is soft, low shear strength, which makes it difficult to use the equipment. A large movement is occurred on the utility tunnel under construction. The inclined land with high water level and underground facilities are widely distributed and the excess pore water pressure may occur under construction similarly to this study. Some different conditions are made to design result, such as 4m of soil piling near the construction area, heavy rainfall during 2nd excavation that may cause flow liquefaction. To analyze the cause of transverse lateral movement, Three dimensional analysis are performed to four load cases, which is original design condition, flow liquefaction by heavy rainfall, unsymmetric lateral soil pressure, and both of them simultaneously. Ten steps of full construction stage, 1st excavation for utility tunnel, construction of utility tunnel, 1st refill, piling soil from 1m to 4 m, 2nd excavation for drainage culvert, liquefaction around the utility tunnel, construction of drainage culvert and 2nd refill, are take into account to investigate the cause of movement.

A Study on Disaster Influencing Factors and Importance for Safety Management in NATM Tunnel Drilling (NATM 터널 굴진 시 안전관리를 위한 재해영향요인 및 중요도에 관한 연구)

  • Lee, YoungSoo;Yoon, Younggeun;Oh, Taekeun
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.6
    • /
    • pp.757-763
    • /
    • 2022
  • In the NATM tunnel construction method for urban subway and underpass construction, various causes of disaster exist. In this study, in order to analyze the importance of disaster influencing factors during NATM tunnel excavation, the possible risk factors were analyzed through prior research such as drilling, charging and blasting, It was divided into the work items of wrinkle treatment, pumice cleanup, and support materials. Next, the final 21 detailed measurement indicators were selected through the FGI survey of related experts, and AHP (Analytic Hierarchy Process) analysis were conducted. As a result, it was found that the workers involved in the tunnel construction were the most influential disaster influencing factor.

Assessment of Structural Performance for a Lightweight Soundproof Tunnel Composed of Partitioned Pipe Truss Members (격벽화된 파이프 트러스 요소로 구성된 경량방음터널의 구조적 성능 평가)

  • Noh, Myung-Hyun;Ahn, Dong-Wook;Joo, Hyung-Joong
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.7 no.1
    • /
    • pp.1-8
    • /
    • 2016
  • In this paper, the full-size structural performance test for a lightweight soundproof tunnel composed of partitioned pipe truss members is carried out to investigate the structural performance. In addition, a nonlinear structural analysis of the same finite element model as the full-size testing model is performed to compare the test result. The test and analysis results showed that the lightweight soundproof tunnel ensures the structural safety against wind loads, snow loads and load combinations. As a result, the full-size test and analysis results meet all the design load conditions, hence the proposed lightweight soundproof tunnel is ready for the field application.

Computer modelling of fire consequences on road critical infrastructure - tunnels

  • Pribyl, Pavel;Pribyl, Ondrej;Michek, Jan
    • Structural Monitoring and Maintenance
    • /
    • v.5 no.3
    • /
    • pp.363-377
    • /
    • 2018
  • The proper functioning of critical points on transport infrastructure is decisive for the entire network. Tunnels and bridges certainly belong to the critical points of the surface transport network, both road and rail. Risk management should be a holistic and dynamic process throughout the entire life cycle. However, the level of risk is usually determined only during the design stage mainly due to the fact that it is a time-consuming and costly process. This paper presents a simplified quantitative risk analysis method that can be used any time during the decades of a tunnel's lifetime and can estimate the changing risks on a continuous basis and thus uncover hidden safety threats. The presented method is a decision support system for tunnel managers designed to preserve or even increase tunnel safety. The CAPITA method is a deterministic scenario-oriented risk analysis approach for assessment of mortality risks in road tunnels in case of the most dangerous situation - a fire. It is implemented through an advanced risk analysis CAPITA SW. Both, the method as well as the resulting software were developed by the authors' team. Unlike existing analyzes requiring specialized microsimulation tools for traffic flow, smoke propagation and evacuation modeling, the CAPITA contains comprehensive database with the results of thousands of simulations performed in advance for various combinations of variables. This approach significantly simplifies the overall complexity and thus enhances the usability of the resulting risk analysis. Additionally, it provides the decision makers with holistic view by providing not only on the expected risk but also on the risk's sensitivity to different variables. This allows the tunnel manager or another decision maker to estimate the primary change of risk whenever traffic conditions in the tunnel change and to see the dependencies to particular input variables.