광섬유 센서를 이용한 터널 지중 및 내공변위 자동계측 프로그램 개발 (Development of Underground Displacement and Convergence Auto-Measuring Program for the Tunnel Using the Fiber Optic Sensor)

  • 최명호;윤지선;권오덕;권오준
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.1361-1368
    • /
    • 2005
  • In this paper, the theoretical method of measuring the tunnel convergence and underground displacement, the objective indices of assessing safety for tunnel construction, using the fiber optic sensor is studied by developing the program to automatically measure them. The model test of Con'c beam is conducted to evaluate reliability of the fiber optic sensor. Furthermore, using the RS232 communication protocol as well as Visual C# and Visual C++, the programming tools, the program was developed to detect automatically the measured value of the fiber optic sensor, calculate the tunnel convergence and underground displacement, predict the deformed shape of the tunnel, and evaluate loosening zone due to the tunnel excavation.

  • PDF

수평경사계와 천단침하계에 의한 터널막장 전후방의 천단침하 계측 (Measurement of Tunnel Arch Settlements Ahead of and Behind the Tunnel Face Using a Horizontal Inclinometer and Settlement Pins)

  • 김치환
    • 터널과지하공간
    • /
    • 제23권2호
    • /
    • pp.120-129
    • /
    • 2013
  • 터널시공 중 발생한 변위를 설계단계에서 설정한 계측관리 기준변위와 비교하여 터널의 안정성을 평가할 때에는 터널막장 후방뿐만 아니라 전방에서 발생하는 변위를 포함한 총변위를 이용하여야 한다. 터널 시공 중 발생하는 총변위를 알기 위하여 터널막장에서 전방을 향해 수평경사계를 설치하여 지중침하를 계측하였고 터널 막장 후방에서는 천단침하계를 이용하여 터널의 천단침하를 계측하였다. 이를 통하여 터널시공 중 발생하는 총천단침하를 계측할 수 있었고 터널막장 전후방 종단선상의 침하곡선 특성도 분석하였다.

MOERI 캐비테이션 터널의 음향특성 분석 및 추진기 BPF 소음 계측에 관한 연구 (Background Noise Analysis of the MOERI Cavitation Tunnel & Propeller BPF Noise Measurement)

  • 설한신;박철수;김기섭;조용진
    • 대한조선학회논문집
    • /
    • 제44권4호
    • /
    • pp.408-416
    • /
    • 2007
  • This paper summarizes an experimental study on the marine propeller BPF noise. The main objective of this study is to show the worthiness of the noise measurement at the MOERI middle size cavitation tunnel and to acquire useful propeller noise data. Background noise of MOERI(Maritime and Ocean Engineering Research Institute) cavitation tunnel is experimentally analyzed. Experiment carried out in the MOERI cavitation tunnel with wake screen or dummy body, which is simulated the wake. Propeller BPF noise is measured under various operating conditions. In order to secure the reliance of measured propeller noise dada, background noise of each operating conditions are measured and analyzed. The noise characteristics are analyzed according to the operating condition.

도로터널에서 MMS를 이용한 정밀안전진단 적용 사례 (An application of MMS in precise inspection for safety and diagnosis of road tunnel)

  • 추진호;박세준;김동석;노은철
    • 한국터널지하공간학회 논문집
    • /
    • 제26권2호
    • /
    • pp.113-128
    • /
    • 2024
  • 향상된 MMS (Mobile Mapping System)를 이용하여 도로터널 정밀안전진단 항목을 검토하고 분석하였다. MMS에 의한 적용 가능한 항목은 외관조사, 조사 및 비파괴시험, 구조안전성, 유지관리방안일 것이다. MMS의 차량속도가 너무 빠르면 점군데이터의 해상도가 낮아지고 너무 느리면 보정값 오차가 증가하는 경향을 보인다. 본 연구에 적용된 장비에서는 50 km/h 속도에서 측정이 효과적이다. MMS의 점군 자료에 근거한 균열폭을 판단하기에는 한계가 있으나 터널내 설비 현황과 방재관리기준과 부합되는지를 검토할 수있다. MMS의 3차원 점군은 횡단면 측량의 검토 및 종단면 측량의 변화에 적용될 수 있는데 이는 터널 전체에 대해 차량 한계를 직관적으로 검토할 수 있을 것이다. 시험 개수와 조사 위치를 무작위로 선정하는 현재 정밀안전진단의 측정과 비교하여 MMS의 연속된 환경조건 측정은 정밀도 높은 분석에서 효과적이며 의미가 있을 것이다.

운영 중 해저 터널의 안정성 평가를 위한 역해석 프로그램 개발: 횡단방향 (The development of a back analysis program for subsea tunnel stability under operation: transversal tunnel section)

  • 안준상;김병찬;이상현;송기일
    • 한국터널지하공간학회 논문집
    • /
    • 제19권2호
    • /
    • pp.195-212
    • /
    • 2017
  • 운영 중 해저 터널의 안정성 평가에 응력, 수압 그리고 라이닝 및 주변지반의 강성 열화 등과 같은 다양한 계측 정보를 사용해서 역해석하면, 효율적인 오차율 이내의 결과를 획득할 수 있다. 선행 연구에서 검증된 차분진화 알고리즘 기반의 역해석 수행 시 FLAC3D 등 범용 지반해석 프로그램을 사용했지만, 상대적으로 해석시간이 오래 걸리고, 제어가 어려운 단점이 있다. 이러한 이유로, 본 연구에서는 상대적으로 해석시간이 짧게 소요되는 beam-spring 모델 기반의 FEM solver를 도입하였다. 원형 터널 단면의 구조해석이 가능한 beam-spring 프로그램을 Python 언어로 개발하여, 기구축된 차분진화 알고리즘과 결합하였다. 계측 데이터로부터 실시간에 가깝게 운영 중 터널의 안정성 평가가 가능할 것으로 판단된다.

하저터널에서 상대내공변위 계측을 통한 지반정수 예측 (Geotechnical parameter estimation in underwater tunnel using relative convergence measurement)

  • 김도훈;장재혁;이인모
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.792-802
    • /
    • 2008
  • If a tunnel is constructed below the groundwater level, the groundwater flow will occur inducing the seepage force toward the tunnel and will result in the increase of tunnel convergence. The longitudinal deformation during tunnel excavation will also be increased due to seepage pressure. A back-analysis methodology in underwater tunnel was proposed in this study based on the relative longitudinal deformation measured in-situ. Geotechnical parameters can be estimated utilizing the proposed method where the prior estimate as well as the measured convergence can be reasonably combined by adopting the Extend Bayesian Method.

  • PDF

Wind Tunnel Test of MRP Model using External Balance

  • Chung, Jindeog;Sung, Bongzoo;Cho, Taehwan
    • International Journal of Aeronautical and Space Sciences
    • /
    • 제1권2호
    • /
    • pp.68-74
    • /
    • 2000
  • A comparative wind tunnel testing of an airplane model was performed at the Korea Aerospace Research Institute Low Speed Wind tunnel(KARI LSWT). The model used for the comparative test was a seaplane model from the Glenn L. Martin Wind(GLM) Tunnel of University of Maryland, U.S.A. The 6-component external balance used in force and moment measurement is pyramidal type, which is a precision device that has strain gauge-type load cell inside of balance and the virtual center of the balance coincides with the tunnel centerline. Image method is adopted to eliminate the tare and interference of the model support, and to correct the flow angularity to the model also. Test results from KARI LSWT were compared with the results from GLM tunnel.

  • PDF

화원의 높이 및 화재크기별 터널 천장온도 측정 실험 (Measurement of Ceiling Temperature in Tunnel for Heights and Fire Sizes of Fire Source)

  • 박원희
    • 한국유체기계학회 논문집
    • /
    • 제18권1호
    • /
    • pp.5-10
    • /
    • 2015
  • The "Ondong tunnel" is not used now where is one of the tunnels in the Janghang line which is from Cheonan to Iksan. The length of the tunnel is 214 m. The location of the fire source is center of the tunnel and the pool fire with heptane is for the fire source. Tests are carried out for the various fire sizes, the height and obstructed/open condition of the fire source. Temperature on the top of the tunnel is measured. Even if the fire size is same, the maximum temperature on the ceiling of the tunnel for the elevated fire source is very larger than the maximum for the ground fire source. As the fire size is lager the maximum temperature on the ceiling is higher. These test results can be very useful for design and guidelines of fire detectors in tunnels.

복개 터널구조물의 현장 시공에 따른 계측 분석 사례 (Field Measurements with the Construction of Cut and Cover Tunnel)

  • 박시현;이석원;이규필;배규진;전오성;이종성
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.149-156
    • /
    • 2002
  • Field measurements were carried out in this study to investigate the behavior of cut and cover tunnel such as the distribution and the magnitude of the earth pressure during back fill process of the ground material. Three kinds of measuring instruments, such as the earth pressure load cell, the concrete strain gauge and the reinforcing bar meter of embedded type in concrete structure were installed and measured. Earth pressure load cells, installed after construction of the tunnel lining, measure the outside forces acting on the tunnel lining with radial directions. Three load cells were installed at the crown, the right and the left shoulder of the tunnel, respectively. Three sets of reinforcing bar meter were installed in the double reinforcements of the tunnel lining and their locations were the same with the position of the earth pressure load cells. Concrete strain gauge was installed only one site of the upper compressive part at the tunnel crown. Based on the measuring results in the field, the deformation and the earth pressure acting on the tunnel lining were investigated with the back fill process of the ground material. Considerations on the validity of the measuring results were paid. For the analysis of measurements, after dividing back fill process into three steps, various factors which affect on the behavior of tunnel lining were investigated at each step.

  • PDF

계측치와 변위함수에 의한 시공 중인 터널의 최종변위 예측 (Forecasting Final Displacement With Displacement Functions Using Deformation Measurements While Constructing a Tunnel)

  • 김치환
    • 터널과지하공간
    • /
    • 제20권6호
    • /
    • pp.408-420
    • /
    • 2010
  • 터널시공 중 터널 완공 후에 발생할 최종변위를 미리 예측하는 것은 터널의 역학적 안정성을 평가하는데 중요하다. 시공 중인 터널에서 계측한 천단 및 내공변위와 변위함수를 이용하여 터널을 시공 완료하였을 때 발생할 터널의 최종변위를 예측하였다. 연구대상 터널은 상반과 하반으로 나누어 시공하였고 터널상반 시공 중 설치한 계측핀을 이용하여 하반막장이 이 계측핀을 통과할 때 발생한 초기변위를 계측할 수 있었다. 터널하반 시공 중 계측한 변위를 이용하여 하반굴착에 따른 변위 증가량을 변위함수로 예측한 결과 터널시공 완료 후 계측한 증가량과 거의 같았다.