In this paper, due to the need for cutting cement-soil group pile composite foundation under the 7-story masonry structure of Zhenghe District and the shield tunnel of Zhengzhou Metro Line 5, a field test was conducted to directly cut cement-soil single pile composite foundation with diameter Ф=500 mm. Research results showed that the load transfer mechanism of composite foundation was not changed before and after shield tunnel cut the pile, and pile body and the soil between piles was still responsible for overburden load. The construction disturbance of shield cutting pile is a complicated mechanical process. The load carried by the original pile body was affected by the disturbance effect of pile cutting construction. Also, the fraction of the load carried by the original pile body was transferred to the soil between the piles and therefore, the bearing capacity of composite foundation was not decreased. Only the fractions of the load carried by pile and the soil between piles were distributed. On-site monitoring results showed that the settlement of pressure-bearing plates produced during shield cutting stage accounted for about 7% of total settlement. After the completion of pile cutting, the settlements of bearing plates generated by shield machine during residual pile composite foundation stage and shield machine tail were far away from residual pile composite foundation stage which accounted for about 15% and 74% of total settlement, respectively. In order to reduce the impact of shield cutting pile construction on the settlement of upper composite foundation, it was recommended to take measures such as optimization of shield construction parameters, radial grouting reinforcement and "clay shock" grouting within the disturbance range of shield cutting pile construction. Before pile cutting, the pile-soil stress ratio n of composite foundation was 2.437. After the shield cut pile is completed, the soil around the lining structure is gradually consolidated and reshaped, and residual pile composite foundation reaches a new state of force balance. This was because the condensation of grouting layer could increase the resistance of remaining pile end and friction resistance of the side of the pile.
본 논문에서는 기존의 불연속 변형 해석(DDA) 방법에 대한 세가지 방향의 새로운 개선 방법들이 제시되었다. 이 개선 방법들은 암반 균열에서 암석 블록과 지하수 흐름의 수리-역학적 커플링, 연속적인 하중 재하 또는 제하, 그리고 록볼트, 숏크리트와 콘크리트 라이닝에 의한 보강으로 구성되었다. Shi (1988)와 Lin (1995)에 의한 기존 DDA 프로.그램은 이 방법들에 의하여 추가로 개선되었으며, 이 새로운 DDA프로그램에 대한 몇 가지 적용예들이 제시되었다. 또한, 경부고속철도 공사의 일부인 운주 터널의 지하굴착에 대한 시뮬레이션을 통하여 절리를 통한 지하수의 흐름, 굴착순서, 그리고 록볼트와 숏크리트에 의한 보강이 터널안정에 미치는 영향을 연구하였다. 그 결과 절리를 통한 지하수의 흐름과 부적절한 굴착순서는 터널의 안정성에 악영향을 미치나, 한편 록볼트와 숏크리트에 의한 보강은 터널을 안정화 시킨다는 사실을 밝혀냈었다. 그 결과 세가지 개선방법이 추가된 DDA프로그램은 지하구조물 설계에 있어서 유용한 해석방법으로 사용될 수 있다는 사실을 보여주었다.
해저 지하구조물을 시공할 경우는 높은 수압 및 침투압 등의 영향이 무시될 수 없으므로 지하구조물의 정확한 거동평가를 위해서는 수리-역학적 연계해석이 수행되어야만 한다. 또한, 실무에서는 암반이완하중을 고려하여 터널의 콘크리트 라이닝을 설계하며, 이를 위해 이완하중고($H_{relaxed}$)를 터널 주변의 국부안전율 분포를 이용하여 수치해석에 의해 산정하는 방법이 제안된 바 있다. 따라서 본 연구에서는 해저터널을 대상으로 수리-역학적 연계해석 시 국부안전율을 이용한 이완하중고 산정 기법의 타당성을 살펴보았다. 3 등급 암반을 대상으로 숏크리트 수리특성을 이용한 유도 배수방법과 집수정펌핑을 이용한 유도 배수 방법을 비교한 결과 집수정 펌핑을 이용한 유도 배수방법이 보다 신뢰할 수 있는 결과를 준다고 발표된 바 있다. 따라서 본 연구에서는 집수정의 펌핑을 이용한 유도 배수방법을 이용하여 1, 3, 5 등급 암반을 대상으로 이완하중고를 산정하여 제안식들과 적용성을 비교하였다. 연구 결과 연계해석 시 해저 시설물의 이완하중고를 정확하게 산정하기 위해서는 기존에 제시된 이론식 보다는 집수정의 펌핑을 이용하여 유도 배수하는 모델링 방법이 보다 정확하고 일관성 있는 결과를 얻을 수 있었다.
비파괴적, 비관입적으로 지반 및 구조물의 전단강성 구조를 파악할 수 있는 SASW 기법은 여러 토목분야에서 성공적으로 적용이 되어왔다. 그러나 SASW 기법은 그 기법상의 제약으로 인해 실험이 행해지는 측선의 하부구조가 수평으로 균질하다고 하는 가정을 하여야만 한다. 이러한 수평 다층 구조의 가정은 포장 구조체, 터널 라이닝 등의 토목 구조물의 건전도 검사의 경우에 있어서 반드시 합리적이라고 할 수는 없다. 즉, 지반조사 측선 방향으로의 변이성 평가를 높은 해상도로 수행하여야 할 경우에 기존의 SASW 실험으로 만족스러운 결과를 얻는 것은 용이하지 않다. 최근에는 지반 및 구조물의 건전도 상태를 연속적으로 평가하는 GPR과 같은 비파괴 검사의 중요성이 부각되고 있는 실정이기에, 본 연구에서는 기존의 SASW 실험을 보완하여 지반 조사 측선 방향으로의 전단강성의 연속적 평가가 가능한 토모그래픽 SASW 기법을 새로이 개발하였다. 이러한 토모그래픽 SASW 기법의 개발로 조사대상 매질의 전단강성의 변화에 관한 거리-깊이의 2차원적 컨투어(contour) 도표(토모그래피)의 표현이 가능하게 되어 SASW 기법의 적용성이 토건구조물의 건전도 평가 영역에서 확대되게 되었다. 본 연구에서는 새로이 제안된 토모그래픽 SASW 기법의 타당성을 평가하기 위하여 강사법으로 형성한 모래지반의 횡방향 및 깊이 방향으로의 균질성을 조사하였다. 토모그래픽 SASW 실험으로 모래지반의 전단강성의 변화정도를 용이하게 파악할 수 있었으며, 전단강성의 길이-깊이 방향에 대한 컨투어 도표는 강사법에 사용한 강사기의 문제점을 파악하는데 도움이 되었다. 이러한 모래 지반에서의 전단강성의 평가 실험으로 본 연구에서 제안한 토모그래픽 SASW 실험의 타당성 및 적용성을 확인할 수 있었다.
본 연구의 목적은 운영 중인 콘크리트 지하구조물에서 발생하는 누수를 유도배수하기 위하여 시공성, 차수 및 유도배수 성능을 향상시킨 유도배수시스템을 제안하는 것이다. 기존 유도배수시스템에서 제기된 유도배수관의 시공성 및 누수를 개선하였다. 개선된 유도배수관을 적용한 유도배수시스템은 시공성, 차수 및 유도배수 성능에 대한 현장평가를 위하여 재래식 콘크리트 라이닝 터널에서 시험 시공되었다. 재령 3주, 6주, 9주, 11주, 14주, 17주 및 23주차에 개선된 유도배수시스템 배면에 약 1,000 ml 이상의 붉은색 물을 주입하여 유도배수시스템의 차수와 유도배수 성능을 평가하였다. 현장 성능평가 실험이 진행된 6개월 동안 터널이 위치한 지역의 일일 평균 온도는 $-12.4{\sim}19.7^{\circ}C$이며 일일 최저 온도는 $-17.2^{\circ}C$이고 일일 최고 온도는 $26.7^{\circ}C$였다. 현장 성능평가 실험이 진행되는 6개월 동안 개선된 유도배수시스템에서는 누수가 발생하지 않았다. 또한 개선된 유도배수관에서도 누수가 발생하지 않았다. 개선된 유도배수시스템은 누수가 발생하는 다양한 콘크리트 지하구조물에서 적용가능하며 계절적 영향도 거의 받지 않는 것으로 판단되었다.
본 연구에서는 지하 콘크리트 구조물 내로 누수된 지하수를 유도하여 배수하는 유도배수공법을 제시하였다. 유도배수공법은 유도배수판, 철망, 고정핀, 광물질 혼입 모르타르로 구성된다. 시공성 향상을 위하여 유도배수판 및 철망은 공압타카와 고정핀를 사용하여 콘크리트 표면에 부착하였다. 고로슬래그미분말을 30% 혼입한 모르타르는 뿜어 붙임 모르타르 장비를 사용하여 유도배수판 및 철망 표면에 타설하였다. 유도배수공법의 현장 시공성 및 성능 검증을 위하여 재래식 콘크리트라이닝 터널과 콘크리트 옹벽에서 시험시공을 수행하였다. 시험시공 완료 3년 후 유도배수공법은 성능저하의 문제점이 없는 것으로 판단되었다. 재령 14일과 3년에 뿜어 붙임 모르타르의 부착력 실험을 수행하였다. 유도배수판 표면에 철망을 적용한 경우 뿜어 붙인 모르타르의 부착력은 재령 14일에 1.04 MPa, 재령 3년에 1.46 MPa로 측정되었다. 철망을 적용하지 않은 경우의 부착력은 재령 14일에 1.13 MPa로 측정되었지만, 재령 3년에는 0.89 MPa로 기준 부착력 1 MPa보다 낮게 측정되었다.
본 연구는 최근 들어 인천지역에서 발생하는 폐콘크리트 폐기물을 새로운 재생시스템에 의해서 생산된 재생골재를 사용하여 재생콘크리트로 활용가능성을 평가하기 위하여 천연골재에 재생골재를 혼합한 5개의 재생콘크리트 조합으로 나누어 재생콘크리트의 강도특성을 비교해 보았다. 기본적으로 재생골재 각 조합의 물성시험을 통해 골재의 물성치를 확인한 후 이를 바탕으로 콘크리트의 배합설계를 하였다. 모든 조합은 상대비교를 위해 단위골재량 값만을 변화시키고 여타 조건들은 동일하게 하였다. 또한 동결융해 시험 및 플라이애쉬, 고성능 감수제를 첨가한 시험을 통해 내구성과 작업성 문제에 대해서 고찰해 보았다. 재생골재의 물리적 특성 시험결과 재생굵은골재와 재생잔골재 모든 조합에서 비중은 KS의 1종 재생골재 기준을, 흡수율은 2종 재생골재 기준을 만족함을 알 수 있었고, 특히 재생골재 대체율 50%까지는 자연골재와 거의 유사한 물성값을 나타내었다. 또한 동결융해 시험결과 동결전과 동결후의 재생콘크리트 강도 감소율은 일반콘크리트보다 최대 7%까지 낮음을 확인 할 수 있었다. 기존의 폐콘크리트는 단순히 대지조성재, 기초 매립재, 노반재, 아스팔트 혼합물로 이용하는 것이 대부분이었으나 본 시험을 통해 도출된 결과 재생콘크리트는 교량하부공, 옹벽, 터널 라이닝공 등에 사용이 가능할 것으로 판단되고 심한 건조수축의 영향을 받지 않는 구조물 등에도 충분히 사용이 가능하리라 판단된다.
Zhang, Yuting;Ding, Xiuli;Huang, Shuling;Wu, Yongjin;He, Jun
Geomechanics and Engineering
/
제21권1호
/
pp.63-71
/
2020
Strength anisotropy is a typical feature of thin-bedded rock masses and their strength will be degraded subjected to water immersion effect. Such effect is crucial for the operation of hydropower plant because the impoundment lifts the water level of upstream reservoir and causes the rock mass of nearby slopes saturated. So far, researches regarding mechanical property of natural thin-bedded rock masses and their strength variation under water immersion based on field test method are rarely reported. This paper focuses on a thin-bedded stratified rock mass and carries out field test to investigate the mechanical property and strength variation characteristics. The field test is highlighted by samples which have a large shear dimension of 0.5 m*0.5 m, representing a more realistic in-situ situation than small size specimen. The test results confirm the anisotropic nature of the concerned rock mass, whose shear strength of host rocks is significantly larger than that of bedding planes. Further, the comparison of shear strength parameters of the thin-bedded rock mass under natural and saturated conditions show that for both host rocks and bedding planes, the decreasing extent of cohesion values are larger than friction values. The quantitative results are then adopted to analyze the influence of reservoir impoundment of a hydropower plant on the surrounding rock mass stability of diversion tunnels which are located in the nearby slope bank. It is evaluated that after reservoir impoundment, the strength degradation induced incremental deformations of surrounding rock mass of diversion tunnels are small and the stresses in lining structure are acceptable. It is therefore concluded that the influences of impoundment are small and the stability of diversion tunnels can be still achieved. The finings regarding field test method and its results, as well as the numerical evaluation conclusions are hoped to provide references for rock projects with similar concerns.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.