• 제목/요약/키워드: tunnel ceiling

검색결과 41건 처리시간 0.022초

화원의 높이 및 화재크기별 터널 천장온도 측정 실험 (Measurement of Ceiling Temperature in Tunnel for Heights and Fire Sizes of Fire Source)

  • 박원희
    • 한국유체기계학회 논문집
    • /
    • 제18권1호
    • /
    • pp.5-10
    • /
    • 2015
  • The "Ondong tunnel" is not used now where is one of the tunnels in the Janghang line which is from Cheonan to Iksan. The length of the tunnel is 214 m. The location of the fire source is center of the tunnel and the pool fire with heptane is for the fire source. Tests are carried out for the various fire sizes, the height and obstructed/open condition of the fire source. Temperature on the top of the tunnel is measured. Even if the fire size is same, the maximum temperature on the ceiling of the tunnel for the elevated fire source is very larger than the maximum for the ground fire source. As the fire size is lager the maximum temperature on the ceiling is higher. These test results can be very useful for design and guidelines of fire detectors in tunnels.

도로터널에서 최적의 조명기구 위치 연구 (The Study of the Most Suitable Location of Luminaire for Road Tunnel Lighting System)

  • 한완모;장우진;이인환
    • 조명전기설비학회논문지
    • /
    • 제18권4호
    • /
    • pp.1-7
    • /
    • 2004
  • 우리나라의 지형은 많은 산들로 이루어져 있으며 최근에는 교통량의 증가와 물류비용의 절감 등의 목적으로 많은 터널이 건설되고 있다. 터널에서의 조명은 안전한 도로조건을 만들기 위한 가장 중요한 설비이다. 과거에는 조명기구를 벽면에 설치하였으나 최근에는 천장에 설치하고 있으며 조명기구를 천장에 설치하더라도 어느 위치에 설치하여야 적절한지를 알 수가 없어 설계자의 임의로 설계를 하고 있는 실정이다. 이런 문제를 해결하고자 풍부한 경험과 정확한 데이터를 가지고, Lightscape program을 사용하여 계산 및 시뮬레이션을 시행하여 적정한 위치를 연구 검토하였다. 검토결과 조명기구를 벽면에 설치하는 것보다 천장에 설치하는 것이 균제도가 균일하고 조명률이 높아 경제적이며 휘도비도 대체로 좋다. 그러므로 터널에서는 조명기구의 위치를 일반적으로 벽면보다 천장에 설치하는 것이 바람직하겠다.

도로터널에서 최적의 조명기구 위치 연구 (The Study of the Most Suitable Location of Luminaire for Road Tunnel Lighting System)

  • 한완모;장우진;이인환
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2003년도 학술대회논문집
    • /
    • pp.25-29
    • /
    • 2003
  • As we know, topography of korea is composed of many mountains Also, the volume of traffic is increasing more and more nowadays. So, many tunnels are being constructed to reduce cost of transport and time. Thus, tunnel illumination was considered as the most important thing to make safe traffic conditions. In the past, we installed luminaires on the wall in tunnel, but currently we are installing those on the ceiling. Wherever luminaires are installed on the ceiling, the electric designer may not have known the proper point to install luminaires. Therefore, we researched this project to resolve above problems with abundant experience and accurate data through simulation(Lightscape program).

  • PDF

Mechanical evolution law and deformation characteristics of preliminary lining about newly-built subway tunnel closely undercrossing the existing station: A case study

  • Huijian Zhang;Gongning Liu;Weixiong Liu;Shuai Zhang;Zekun Chen
    • Geomechanics and Engineering
    • /
    • 제35권5호
    • /
    • pp.525-538
    • /
    • 2023
  • The development of a city is closely linked to the construction and operation of its subway system. However, constructing a new subway tunnel under an existing station is an extremely complex task, and the deformation characteristics and mechanical behavior of the new subway tunnel during the excavation process can greatly impact the normal operation of the existing station. Although the previous studies about the case of underpass engineering have been carried out, there is limited research on the condition of a newly-built subway tunnel that closely undercrossing an existing station with zero distance between them. Therefore, this study analyzes the deformation law and mechanical behavior characteristics of the preliminary lining of the underpass tunnel during the excavation process based on the real engineering case of Chengdu Metro Line 8. This study also makes an in-depth comparison of the influence of different excavation methods on this issue. Finally, the accuracy of numerical simulation is verified by comparing it with on-site result. The results indicate that the maximum bending moment mainly occurs at the floor slab of the preliminary lining, while that of the ceiling is small. The stress state at the ceiling position is less affected by the construction process of the pilot tunnel. Compared to the all-in-one excavation method, although the process of partial excavation method is more complicated, the deformation of preliminary lining caused by it is basically less than the upper limit value of the standard, while that of the all-in-one excavation method is beyond standard requirements.

쉴드 TBM터널 상부 지반 연약대 전기탐사 (Electrical Resistivity Imaging for Upper Layer of Shield TBM Tunnel Ceiling)

  • 정현기;박철환
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.401-408
    • /
    • 2005
  • Recently shield TBM tunnellings are being applied to subway construction in Korean cities. Generally these kinds of tunnellings have the problems in the stability of ground such as subsidence because urban subway is constructed in the shallow depth. A sinkhole occurred on the road just above the tunnel during tunneling in Kwangju, so a survey for upper layer of the tunnel was needed. But conventional Ground Probing Radar can't be applicable due to the presence of steel-mesh screen in the shield segment, so no existent geophysical method is applicable in this site. Because the outer surface of each shield segment is electrically insulated, dipole-dipole resistivity method which is popular in engineering site investigation, was tried to this survey for the first time. Specially manufactured flexible ring-type electrodes were installed into the grouting holes at an interval of 2.4 m on the ceiling. The K-Ohm II system which has been developed by KIGAM and tested successfully in many sites, was used in this site. The system consists of 1000Volt-1Ampere constant-current transmitter, optically isolated 24 bit sigma-delta A/D conversion receiver - maximum 12 channel simultaneous measurements, and graphical automatic acquisition software for easy data quality check in real time. Borehole camera logging with circular white LED lighting was also done to investigate the state of the layer. Measured resistivity data lack of some stations due to failing opening lids of holes, shows general high-low trend well. The dipole-dipole resistivity inversion results discriminate (1) one approximately 4 meter diameter cavity (grouted but incompletely hardened, so low resistivity - less than $30{\Omega}m$), (2) weak zone (100-200${\Omega}m$), and (3) hard zone (high resistivity - more than 1000${\Omega}m$) very well for the distance of 320 meters. The 2-D inversion neglects slight absolute 3-D effect, but we can get satisfactory and useful information. Acquired resistivity section and video tapes by borehole camera logging will be reserved and reused if some problem occurs in this site in the future.

  • PDF

터널 화재시 터널 단면의 종횡비에 따른 연기 거동에 관한 (An Experimental Study of Smoke Movement in Tunnel Fires with Aspect Ratio of Tunnel Cross Section)

  • 이성룡;유홍선;김충익
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2003년도 추계학술대회
    • /
    • pp.115-120
    • /
    • 2003
  • In this study, smoke movement in tunnel fires was investigated with various aspect ratio(0.5, 0.667, 1.0, 1.5, 2.0) of tunnel cross section. Reduced-scale experiments were carried out under the Froude scaling using 8.27 kW ethanol pool fire. Temperatures were measured under the ceiling and vertical direction along the center of the tunnel. Smoke front velocity and temperature decrease rate were reduced as higher aspect ratio of the tunnel cross-section. Smoke movement was evaluated by analysis of vertical temperature distribution 3 m downstream from the fire source. Elevation of smoke interface according to N percent rule was under about 60% of tunnel height.

  • PDF

Comparison of Two Different Smoke Extraction Schemes of Transversely Ventilated Tunnel Fire

  • Rie, Dong-Ho;Kim, Hyung-Taek;Yoo, Ji-Oh;Shin, Hyun-Jun;Yoon, Sung-Wook
    • International Journal of Safety
    • /
    • 제4권2호
    • /
    • pp.30-35
    • /
    • 2005
  • In case of tunnel fire, one of the most effective facilities to save lives is the smoke control system. In this study, two different smoke extraction schemes of transversely ventilated tunnel were compared. One is the smoke extraction using the fixed exhaust ports on the false ceiling to achieve the uniform and distributed smoke extraction (uniform exhaust). The other is that using the remote controlled smoke extraction where only vents close to the fire is opened whereas the others are closed to enhance the limitation of the smoke spread (localized exhaust). A number of numerical simulations were performed to find out the optimal smoke extraction rate at each smoke extraction scheme to allow the tunnel users to escape to the safe area without endangering their lives by smoke.

수직갱이 설치된 터널내 화재시 연기거동에 관한 실험적 연구 (An Experimental Study of Smoke Movement in Tunnel Fires with a Vertical Shaft)

  • 이성룡;유홍선;김충익
    • 설비공학논문집
    • /
    • 제16권2호
    • /
    • pp.135-141
    • /
    • 2004
  • The present paper concerns a smoke movement in a tunnel fire with a vertical shaft. The model tunnel measured 13.4m long, 0.4m wide and 0.4m high. The cross section is 1: 20 of a full scale tunnel. Ethanol was used as a fuel. The fire size in model tests varied from 1.35 kW to 13.37 kW, which corresponds to full scale fires of 2.41 to 23.91 MW. Smoke front velocity and temperatrue were decreased due to the vertical shaft install. Temperature was reduced maximum about 2$0^{\circ}C$ at ceiling and about 23$^{\circ}C$ at vertical position. CO concentration was reduced as the vent width widened. When vent width was more than 15 cm, CO concentration was not reached 100 ppm. Descent degree of the smoke layer was confirmed through the visualization.

터널화재시 환기방식에 따른 연기거동에 관한 실험적 연구 (An Experimental Study of Smoke Movement in Tunnel Fires According to Ventilation Method)

  • 이성룡;정진용;김충익;유홍선
    • 설비공학논문집
    • /
    • 제14권9호
    • /
    • pp.691-698
    • /
    • 2002
  • In this study, reduced-scale experiments were conducted to analyze smoke movement in tunnel fires according to vepntilation method. The 1/20 scale experiments were carried out under the Froude scaling using gasoline pool fires ranging from 6.6 to 10 cm in diameter corresponding to total heat release rate from 0.714 to 2.5 kW. Temperatures near the ceiling were lowered by installing the vent, and much lowered by operating fan compared wiht tile case without vent. In case of forced ventilation, the exhaust fan was more effective than the intake fan. Vertical temperatures at the upper part of the tunnel were also lowered by installing the vent. But, when suction fan was operated, temperatures at the lower part of the tunnel were higher than that without vent.

자연 배기 터널에서의 연기 거동에 관한 연구 (A Study of Smoke Movement in Tunnel Fire with Natural Ventilation)

  • 김성찬;이성룡;김충익;유홍선
    • 대한기계학회논문집B
    • /
    • 제26권7호
    • /
    • pp.976-982
    • /
    • 2002
  • In this study, smoke movement in tunnel fire with natural ventilation shaft has been investigated with various size of fire source. Gasoline pool fire with different size of diameter - 73mm, 100mm, 125mm and 154mm - was used to describe fire source. Experimental data is obtained with 1/20 model tunnel test and its results are compared with numerical results. The computation were carried out using FDS 1.0 which is a field model of fire-driven now. Temperature profiles between measured and predicted data are compared along ceiling and near the ventilation shaft. Both results are in good agreement with each other. In order to evaluating a safe egress time in tunnel fire, horizontal smoke front velocity was measured in model tunnel fire tests and those are compared with numerical results. According to the presence or absence of natural ventilation shaft, ventilation effect are estimated quantitatively. Finally, this paper shows that computational fluid dynamics(CFD) is applicable to predict fire-induced flow in tunnel.