• Title/Summary/Keyword: tunnel bottom

Search Result 170, Processing Time 0.026 seconds

Study on the Occurrence of Tunnel Damage when a Large-scale Fault Zone Exists at the Top and Bottom of a Tunnel (대규모 단층대가 터널 상하부에 존재하는 조건에서 터널 변상 사례 연구)

  • Jeongyong Lee;Seungho Lee;Nagyoung Kim
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.12
    • /
    • pp.53-60
    • /
    • 2023
  • Recently, along with the improvement of high-speed rail and road design speed, the proportion of tunnel construction work is increasing proportionally. In particular, the construction of long tunnels is rapidly increasing due to the mountainous terrain of our country. In this way, due to the trend of tunnels becoming longer, it is difficult to design and construct tunnels by avoiding fault zones. In the case of tunnel construction in mountainous areas, ground investigation is often difficult even during design due to the topographical conditions, making precise ground investigation difficult, and as a result, the upper part of the tunnel is damaged during tunnel construction. When fault zones, which are vulnerable to weathering, exist, the stability of the tunnel during excavation is directly affected by the fault zone distribution, strength characteristics, and groundwater distribution range. In particular, when a fault zone is distributed in the upper part of a tunnel, damage such as tunnel collapse and excessive displacement may occur, and in order to prevent this in advance, countermeasures must be established through analysis of similar cases. Therefore, in this study, when a large-scale fault zone exists in the upper part of a tunnel, the relationship and characteristics of damage to the tunnel structure were analyzed.

Study on collapse mechanism and treatment measures of portal slope of a high-speed railway tunnel

  • Guoping Hu;Yingzhi Xia;Lianggen Zhong;Xiaoxue Ruan;Hui Li
    • Geomechanics and Engineering
    • /
    • v.32 no.1
    • /
    • pp.111-123
    • /
    • 2023
  • The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.

Wind loading characteristics of super-large cooling towers

  • Zhao, L.;Ge, Y.J.
    • Wind and Structures
    • /
    • v.13 no.3
    • /
    • pp.257-273
    • /
    • 2010
  • The aerodynamic and aero-elastic model tests of the China''s highest cooling tower has been carried out in the TJ-3 Boundary Layer Wind Tunnel of Tongji University. By adopting a scanivalve system, the external wind pressure is firstly measured on $12{\times}36$ taps for a single tower, two and four grouped towers under the condition of both smooth flow and the boundary layer due to surrounding geographic and building topography. The measurements of internal wind pressure distribution of $6{\times}36$ taps are taken for a single tower under the various ventilation ratios ranging from 0% to 100% of stuffing layers located at the bottom of the tower. In the last stage, the wind tunnel tests with an aero-elastic model are carefully conducted to determine wind-induced displacements at six levels (each with eight points) with laser displacement sensors. According to the measurement results of wind pressure or vibration response, the extreme aerodynamic loading values of the single or grouped towers are accordingly analyzed based on probability correlation technique.

Tunnel i unction-Mangnetorsistance in Co-Al-O$_{x}$-NiFe with oxidation conditions of Al thickness

  • Jeon, Dong-Min;Park, Jin-Woo;Suh, Su-Jeong
    • Journal of the Korean institute of surface engineering
    • /
    • v.34 no.5
    • /
    • pp.494-498
    • /
    • 2001
  • Ferromagnets(FM)-Al-$O_{x}$ -Ferromagnets (FM) tunneling junctions were evaluated by changing the fabricating conditions of an Al-X$/_{x}$ layer. The junction composed of a thicker Al-$O_{x}$ shows the low resistance and the stable MR ratio about 16% in a wide range of oxidation time. For the junctions with the thinner Al-$O_{x}$ , they showed a fast increase of the barrier width as an increase of an oxidation time and exhibited a strong bias dependence. As oxidation time increased, the coercivity ($H_{c}$ ) of bottom Co layer increased gradually due to the local oxidation of Co bottom layer at a interface. However, the small formation of Co oxide did not largely influence on the deterioration of MR ratio.

  • PDF

Measurement of aerodynamic noise of maglev vehicle models using sound camera (음향카메라를 이용한 자기부상열차 모형의 공력소음 측정)

  • Kim, Sang-Ryul;Kim, Hyun-Sil;Kim, Jae-Seung;Kang, Hyun-Ju;Kim, Bong-Ki
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2008.04a
    • /
    • pp.637-640
    • /
    • 2008
  • Noise generated from maglev vehicles mainly consists of two components, one is due to mechanical noise and the other due to aerodynamic noise. The former is due to the vehicle-guideway interactions and the latter results from the unsteady air flow around the vehicle. Aerodynamic noise could become more predominant around 225 km/h for maglev vehicles. In this paper, the aerodynamic noise of maglev vehicles is investigated experimentally. The results of the wind tunnel experiments of maglev vehicle models are introduced and compared. The comparison shows that the position of the main noise is between the bottom of the vehicle model and the rail. It is also found that the emitted sound pressure level is related to the gap size between the vehicle bottom and the rail.

  • PDF

Consideration for Solution of a Difficult Problem and Application of CM.VM in Blasting Excavation for Korea-China and Korea-Japan Sea Bottom Tunnel (한중.한일 해저터널 발파굴착의 난제해결과 CM.VM 적용에 대한 고찰)

  • Shin, Chang-Yong;Ahn, Myung-Seog;Park, Ho-Kyung
    • Explosives and Blasting
    • /
    • v.28 no.1
    • /
    • pp.71-75
    • /
    • 2010
  • A plan of construction of subsea tunnels connecting Korea-Japan and Korea-China have been discussing over the past several ten years. This paper were wrote about the present capacity of our engineer, the cooperation plan of politics and economy. Especially we examined and studied resolution method and technical problem in the construction of Sub-sea tunnel. In terms of excavation technology, Blasting and water resistance technology should be cared considering the status of rock such as fault in the deep sea. After of a construction work, it should be carefully designed and constructed for the fire and leakage management in Tunnel, It should be applied to High Construction Management Professional and Value Management(CVS) etc.

서울시 지하철구간내 지하수위강하에 따른 지하공간 환경오염 감시의 필요성 및 대책

  • 이기철;김윤영;이주영
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2002.04a
    • /
    • pp.167-172
    • /
    • 2002
  • Seoul subway system has been constructed to solve traffic difficulties of Seoul metropolitan, and now is the major public transportation. However, the more line has added in the system the deeper the bottom of the tunnel base. And a huge amount of groundwater along the line has seeping into the tunnel. Several subway stations has pumping system to extract the groundwater to the outside and consequently, groundwater table along the line has declined gradually. Groundwater table has dropped about 40 meters at some areas, There was some study for the proper usage of the abstracted groundwater and the project to use the groundwater has launched already by the local government. However. more serious problem is expected on quality degradation of soil and groundwater as the decline of groundwater table along the subway line. This study suggests that the detailed groundwater environmental study should be made as soon as possible for this. If there is any pollution leaking at the surface area of the groundwater depression, the pollution will be seep into the subway tunnel in some day even though the time will be different with the soil material and hydraulic characteristics of the aquifer. And the polluted area of the soil and groundwater would be enlarged along the pathway The study on possibility of the soil subsidence and reducing surface water flow in small creek were also needed. This study suggest one of the counter measurement that restoring the declined groundwater table after groundwater environmental study

  • PDF

Wind Flow over Hilly Terrain (언덕지형을 지나는 유동에 관한 연구)

  • 임희창;김현구;이정묵;경남호
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.12 no.4
    • /
    • pp.459-472
    • /
    • 1996
  • An experimental investigation on the wind flow over smooth bell-shaped two-dimensional hills with hill slopes (the ratio of height to half width) of 0.3 and 0.5 is performed in an atmospheric boundary-layer wind tunnel. Two categories of the models are used in the present investigation; six two-dimensional single-hills, and four continuous double-hills. The measurements of the flow field and surface static-pressure distribution are carried out over the Reynolds number (based on the hill height) of 1.9 $\times 10^4, 3.3 \times 10^4, and 5.6 \times 10^4$. The velocity profiles and turbulence characteristics are measured by the pitot-tube and X-type hot-wire anemometer, respectively. The undisturbed boundary-layer profile on the bottom surface of the wind tunnel is reasonably consistent with the power-law profile with $\alpha = 7.0 (1/\alpha$ is the power-law exponent) and shows good spanwise uniformities. The profiles of turbulent intensity are found to be consistent along the centerline of the wind tunnel. The measured non-dimensional speed-up profiles at the hill crest show good agreements with the predictions of Jackson and Hunt's linear theory. The flow separation occurs in the hill slope of 0.5, and the oil-ink dot method is used to find the reattachment points in the leeside of the hill. The measured reattachment points are compared with the numerical predictions. Comparisons of the mean velocity profiles and surface pressure distributions between the numerical predictions and the experimental results show good agreements.

  • PDF

A Study on Wind-drift Sand Deposition by Vegetation and Coastal Debris using a Wind Tunnel Test (식생 및 해안표착물에 의한 비사 퇴적 풍동실험 연구)

  • Je, Young Jun;Jeon, Yong Ho;Yoon, Han Sam
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.3
    • /
    • pp.163-170
    • /
    • 2013
  • The correlation and interaction mechanisms between marine debris and the vegetation zone were studied on the Jinu-do natural beach of the Nakdong river estuary. Laboratory wind tunnel experiments were carried out under the wind-field and bottom-sand conditions using wind tunnel test equipment to investigate the sedimentation characteristics of wind-drift sand deposition around marine debris and the vegetation zone. The major environmental factors/loads considered in this study were the motion of sand by wind on the beach, deposition of marine debris, and change in the vegetation zone/line. When the marine debris was installed in the wind tunnel, deposition at the front of the structure appeared first by wind action, and then deposition developed from behind at 70% of the front ground level. In contrast, in the case of vegetation, the deposition phenomenon appeared first from behind the vegetation zone/line, and was 60% higher than the front. When the height of the debris and vegetation was the same, the required experimental time to bury the vegetation completely was about twice that of the marine debris.

The appropriate shape of the boundary transition section for a mountain-gorge terrain model in a wind tunnel test

  • Hu, Peng;Li, Yongle;Huang, Guoqing;Kang, Rui;Liao, Haili
    • Wind and Structures
    • /
    • v.20 no.1
    • /
    • pp.15-36
    • /
    • 2015
  • Characterization of wind flows over a complex terrain, especially mountain-gorge terrain (referred to as the very complex terrain with rolling mountains and deep narrow gorges), is an important issue for design and operation of long-span bridges constructed in this area. In both wind tunnel testing and numerical simulation, a transition section is often used to connect the wind tunnel floor or computational domain bottom and the boundary top of the terrain model in order to generate a smooth flow transition over the edge of the terrain model. Although the transition section plays an important role in simulation of wind field over complex terrain, an appropriate shape needs investigation. In this study, two principles for selecting an appropriate shape of boundary transition section were proposed, and a theoretical curve serving for the mountain-gorge terrain model was derived based on potential flow theory around a circular cylinder. Then a two-dimensional (2-D) simulation was used to compare the flow transition performance between the proposed curved transition section and the traditional ramp transition section in a wind tunnel. Furthermore, the wind velocity field induced by the curved transition section with an equivalent slope of $30^{\circ}$ was investigated in detail, and a parameter called the 'velocity stability factor' was defined; an analytical model for predicting the velocity stability factor was also proposed. The results show that the proposed curved transition section has a better flow transition performance compared with the traditional ramp transition section. The proposed analytical model can also adequately predict the velocity stability factor of the wind field.