• Title/Summary/Keyword: transporting load

Search Result 50, Processing Time 0.033 seconds

Load analysis for transporting unit module (유닛모듈 운반시 작용하중 분석)

  • Kim, Kyoon-tai;Jun, Young-Hun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.200-201
    • /
    • 2015
  • The unit modular method is one in which unit modules are prefabricated at a factory and then constructed at a construction site. That is why an important process, transporting unit module, is added in this method. The purpose of this study is to analyse the load for transporting unit module. The results of the analysis of the driving experimental runs revealed that a maximum load of 15 kN was applied on adapter block type A and a maximum load of 25 kN on adapter block type B. These loads were recorded at the points in the road test when the low-bed trailer was driving through unstable sections of the test such as stopping, restarting, passing over a speed bump or taking a left turn at speed.

  • PDF

The Development of Fixing Equipment of the Unit Module Using the Probability Distribution of Transporting Load (운반하중의 확률분포를 활용한 유닛모듈 운반용 고정장치 개발)

  • Park, Nam-Cheon;Kim, Seok;Kim, Kyoon-Tai
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4267-4275
    • /
    • 2015
  • Prefabricated houses are fabricated at the factory for approximately 60 to 80% of the entire construction process, and assembled in the field. In the process of transporting and lifting, internal and external finishes of the unit module are concerned about damages. The purpose of this study is to improve the fixing equipment by analyzing load behavior. The improved fixing equipment would minimize the deformation of internal and external finishes. In order to develop the improved fixing equipment, transporting load on the fixing equipment is analyzed using Monte Carlo simulations, and structural performance is verified by the non-linear finite element analysis. Statistical analysis shows load distribution of unit module is similar with extreme value distribution. Based on the statistical analysis and Monte Carlo simulation, the maximum transporting load is 28.9kN and 95% confidence interval of transporting load is -1.22kN to 9.5kN. The nonlinear structural analysis shows improved fixing equipment is not destructed to the limit load of 35.3kN and withstands the load-bearing in the 95% confidence interval of transporting load.

A comparative analysis of load behavior of the fixing equipments for transporting unit modules (유닛모듈 운반용 고정장치의 하중거동 비교 분석)

  • Kim, Kyoon-tai;Kim, Seok;Jun, Young-Hun;Kim, Tae-Yeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.146-147
    • /
    • 2015
  • This paper compares load behavior of two fixing equipments for transporting unit modules. The suggested fixing equipment shows higher limit load than an existing fixing equipment, which proves that the suggested fixing equipment have higher safety.

  • PDF

Development of controller for anti-swing and position of crane (크레인의 Anti-Swing 및 위치 제어기의 개발)

  • 정승현;권판조;이달해
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.277-281
    • /
    • 1996
  • The roof crane system is used for transporting a variable load to a target position. At this time, the goal of crane system is transporting to a goal position as soon as possible with no rope oscillation. Generally crane is operated by expert's knowledge, but recently automatic control with high speed and rapid transportation is required. In this thesis we developed fuzzy controller of crane which has simplified expert's knowledge base for anti-swing and rapid tansportation to goal position.

  • PDF

Estimation of the Probability Distribution Model on the Load of Transport of the Unit Module (유닛모듈 운반하중에 관한 확률분포 모델 추정)

  • Park, Nam cheon;Kim, kyoon Tai;Kim, Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.220-221
    • /
    • 2014
  • Recently It has been required the research for the load of transport of the unit module to secure the safety of the transport locking device. So the purpose of this study is to analyze the probability distribution of the load of transport of unit modular when transporting unit modular by vehicle.

  • PDF

Anti-swing and position control of crane using fuzzy controller (퍼지제어기를 이용한 크레인의 진동억제 및 위치제어)

  • Jeong, Seung-Hyun;Park, Jung-Il
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.3 no.5
    • /
    • pp.435-442
    • /
    • 1997
  • The roof crane system is used for transporting a variable load to a target position. The goal of crane control system is transporting the load to a goal position as quick as possible without rope oscillation. The crane is generally operated by an expert operator, but recently an automatic control system with high speed and rapid tansportation is required. In this paper, we developed a simple fuzzy controller which has been introduced expert's knowledge base for anti-swing and rapid tranportation to goal position. In particular, we proposed the synthesis reasoning method which synthesizes on the basis of expert knowledge of the angle control input and position control input which are inferenced parallel and simultaneously. And we confirmed that the performance of the developed controller is effective as a result of applying it to crane simulator and also verified whether the proposed synthesis rules have been applied correctly using clustering algorithm from the measured data.

  • PDF

Ice slurry transporting and branching characteristics for the district cooling (지역냉방을 위한 아이스슬러리 시스템의 수송 및 분기 특성)

  • Lee, Sang-Hoon;Yoo, Ho-Seon;Lee, Yoon-Pyo;Lee, Chang-Jun;Kwon, Hyeok-Min
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.662-667
    • /
    • 2009
  • The research are performed to check the characteristics of the ice slurry transport system for the district cooling. The system are installed at the 1st floored building which is as large as the $1204\;m^2$ ($86\;m{\times}14\;m$), and the pumping power and branching characteristics are measured by transporting of the ice slurry. The ice slurry transporting pipe is as long as 200 m. For the same cooling load, the higher IPF is, the lower the transporting flow rate and the pumping power are. But when the IPF is higher than 15%, no less decrease of the pumping power does happen. For the branching characteristics, through the branch pipe where the flow resistance is higher, the higher IPF is measured. A little higher IPF is measured at the thermal expansion branch.

  • PDF

A District Cooling System using Ice Slurry for the Uncertain Cooling Load of the Future (미래의 불확실한 냉방부하에 대한 아이스슬러리를 이용한 지역냉방시스템)

  • Lee, Yoon-Pyo;Ahn, Young-Hwan;Yoon, Seok-Mann
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.233-238
    • /
    • 2006
  • A new district cooling system using ice slurry for the uncertain cooling load of the future is presented. The chilled water produced by the absorption chillers is used for the base cooling load. The temperature of the chilled water is reduced by mixing of ice slurry depending on increasing of the cooling load. Finally, IPF of the ice slurry is increased up to 10% at the peak load. The transporting mass flow rate is decreased down to 44.7%, and the diameter of the main pipe is decreased down to 66.7%, but the diameter of the branched pipe is designed as the same size of the chilled water.

  • PDF

Behavior of Integrated Column and Foundation by Field Load Tests (기초와 기둥 통합구조물의 현장시험 및 거동)

  • Yoon, Yeo-Won;Kim, Keun-Soo;Min, Kwang-Hong;Lee, Young-Ho;Kim, Dae-Hak
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1073-1076
    • /
    • 2010
  • Shallow foundations of various columns such as traffic signs, CCTVs, traffic lights, street lights, steel telephone poles and so on are made by cast-in-situ concrete method. However, typical cast-in-situ method has many problems because of the long duration of construction, occupation of sidewalks and low strength of the concrete after curing. In order to solve the problems, field load tests for the prefabricated DSF foundation made by combination of column and foundation was conducted to know load-deformation behavior by torsional tests.

  • PDF

A District Cooling System using Ice Slurry for the Uncertain Cooling Load of the Future and its Economic Evaluation (미래의 불확실한 냉방부하에 대한 아이스슬러리를 이용한 지역냉방시스템 및 경제성 평가)

  • Lee Yoon-Pyo;Ahn Young-Hwan;Yoon Seok-Mann
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.18 no.10
    • /
    • pp.776-782
    • /
    • 2006
  • A new district cooling system using ice slurry for the uncertain cooling load of the future is presented. The chilled water produced by the absorption chillers is used for the base cooling load. The temperature of the chilled water is reduced by mixing of ice slurry depending on increasing of the cooling load. Finally, IF of the ice slurry is increased up to 10% at the peak load. The transporting mass flow rate is decreased down to 44.7%, and the diameter of the main pipe is decreased down to 66.7%, but the diameter of the branched pipe is designed as the same size of the chilled water.