• Title/Summary/Keyword: transfer crane

Search Result 134, Processing Time 0.031 seconds

A Study on Development ATCS of Transfer Crane using Neural Network Predictive Control (신경회로망 예측제어에 의한 Transfer Crane의 ATCS 개발에 관한 연구)

  • 손동섭;이진우;이영진;이권순
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2002.11a
    • /
    • pp.113-119
    • /
    • 2002
  • Recently, an automatic crane control system is required with high speed and rapid transportation. During the operation of crane system in container yard it is necessary to control the crane trolley position and loop length so that the swing of the hanging container is minimized We can do development of unmanned automation control system using automation travel control technique and anti-sway technique in crane system. Therefore, we designed a controller for Automation travel control to control the transfer crane system. Analyzed crane system through simulation, and proved excellency of control performance than other conventional controllers.

  • PDF

A Systematic Analysis on the Operation of Busan Container Terminal by Computer Simulation (시뮬레이션에 희한 부산컨테이너 터미널 운영의 체계적인 분석)

  • Kim Hyun;Lee Cheol-Yeong
    • Journal of Korean Port Research
    • /
    • v.2 no.1
    • /
    • pp.29-73
    • /
    • 1988
  • Since the middle of 1950's when sea transportation service by container ship was established, containerization has been rapidly spread over the world with realization of intermodalism, and becomes an index of economy growth of a country. Our country has established Pusan Container Terminal at Pusan harbour in 1978 in step with worldwide trend of containerization, and is constructing New Container Terminal at Pusan outharbour which will be completed in 1990. This paper aims to make a quantitative analysis of the Pusan Container Terminal system through the computer simulation, especially focusing on its subsystems such as ship stevedoring system, storage system and transfer system. First, the capacity of various subsystems are evaluated and it is checked whether the current operation is being performed effectively through the computer simulation. Secondly, the suggestion is presented to improve the operation by considering the throughput that Pusan Container Terminal will have to accept until 1990, when New Container Terminal will be completed. The results are as follows ; 1) As the inefficiency is due to the imbalance between various subsystems at Pusan Container Terminal on the basis of about 1.2 million TEU of container traffic, transfer equipment level must be up to 33% for transfer crane, and free period must be reduced into 4/5 days for export/import. 2) On the basis of about 1.4 million TEU of container traffic, transfer equipment level must be up to $12\%$ for gantry crane, $11\%$ for straddle carrier and $66\%$ for transfer crane, and free period must be reduced into 3/4 days for export/import. 3) On the basis of about 1.7 million TEU of container traffic, transfer equipment level must be up to $25\%$ for gantry crane, $28\%$ for straddle carrier and $100\%$ for transfer crane, and free period must be reduced into 3/4 days for export/import. 4) On the basis of about 2 million TEU of container traffic, transfer equipment level must be up to $25\%$ for gantry crane, $30\%$ for straddle carrier and $110\%$ for transfer crane, and free period must be reduced into 2/3 days for export/import, and it is necessary to enlarge storage yard.

  • PDF

Anti-Sway System for Automated Transfer Crane (자동 트랜스퍼 크레인을 위한 컨테이너 흔들림 장치)

  • 박찬훈;박경택;김두형
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.1743-1746
    • /
    • 2003
  • Automated Container Terminals have been being developed over the world for many recent years and more and more countries get interested in it because the amount of containers exported or imported is steeply increasing. Existed Container Terminals were not designed to control this kind of heavily many containers. They would face many structural problems soon or later, although they have managed to do well until now. One of the most important things in developing Automated Container Terminal is to develop the equipment able to transfer the awfully many containers. Those are maybe Automated Transfer Cranes, Automated Guided Vehicles, and Automated Quay-Side Cranes. The word "Automated" means the equipment is operated without drivers and those equipments are able to work without taking any break. Through the researches on the existed transfer cranes, authors decided that the structure of existed transfer cranes is not proper to swift and fast transfer and it′s not impossible to handle so many containers in limited time. Therefore authors have been studying on the proper structure of the Automated Container Crane for past several years and a new type of transfer crane has been developed. Design concepts and control methods of a new crane will be introduced in this paper.

  • PDF

Anti-Sway System for Container Transfer Crane for Automated Container Terminal: Part Ⅱ - Model Crane Implementation and Verification (자동화 컨테이너 터미널을 위한 컨테이너 트랜스퍼 크레인의 안티스웨이 시스템: Part Ⅱ-모델 크레인 및 실험 검증)

  • Park ChanHun;Kim DooHyung;Shin YoungJae;Park KyoungTaik
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.12
    • /
    • pp.1287-1294
    • /
    • 2004
  • Automated container terminals have been being developed over the world for recent years and many countries are interested in it because the amount of containers exported or imported is rapidly increasing. The conventional container terminals were not designed to control this kind of heavily many containers. They would face many structural problems soon or later, although they have managed to do well so far. One of the most important things in developing automated container terminal is to develop the equipment able to handle many containers efficiently. Those are maybe automated transfer cranes, automatic guided vehicles, and automated quay-side cranes. The word 'automated' means the equipment is operated without drivers and those equipments are able to work without any interruption in working schedule. Through the researches on the conventional transfer cranes, we decided that the structure of the conventional transfer cranes is not efficient in automated container terminal and it's not possible to handle so many containers in limited time. Therefore we have been studying on the proper structure of the automated container crane for past several years and a new type of transfer crane has been developed. Design concept and control method of a new type of transfer crane had been presented in the previous paper: Part Ⅰ. Experimental features will be presented with a model transfer crane in this paper: Part Ⅱ.

Analytical Models for the Optimal Number and the Optimal Operation of Yard Trucks in Container Terminal (컨테이너 터미널의 야드 트럭의 최적 대수와 최적 운행을 위한 해석 모형)

  • Kim, Ki-Young
    • IE interfaces
    • /
    • v.20 no.4
    • /
    • pp.498-503
    • /
    • 2007
  • The synchronized operation of a quay crane(QC) and a transfer crane(TC) increases the productivity of a container terminal. In this paper, analytical models are suggested for the optimal number and the optimal operation of the yard trucks (YTs) which travel between a quay crane and a transfer crane in a container terminal. YT may represent yard tractor, AGV and shuttle carrier. The analytical models are so simple and useful that the analysis and the results of this paper can be used not only in container terminal practices but also in many other application fields.

Standardization of Maintenance and Failure of Transfer Crane (Transfer Crane의 고장 및 정비 표준화)

  • Yun Won-Young;Lee You-Hyoun;Ha Young-Ju;Kim Gui-Rae;Son Bum-Shin
    • Journal of Navigation and Port Research
    • /
    • v.30 no.6 s.112
    • /
    • pp.525-531
    • /
    • 2006
  • In the port, the yard crane is very important. If a container crane or a transfer crane is broken down, it costs a lot because of the delay of work during the period of repair or reorder. But, we don't have enough spare parts because of the high cost. It is necessary to maintain high reliability of the crane through effective preventive maintenance and failure analysis. In this paper, we analyse the function and failure mechanism of the transfer crane which is a main equipment in the yard Also, we standardize failures and maintenance works using the historical data of failure and maintenance. This study which is a basic work for effective equipment operation and maintenance will support reliability engineers to decide the optimal design of the next generation equipment and operational policy of equipment.

Standardization of maintenance and failure of Transfer Crane (Transfer Crane의 고장 및 정비 작업 표준화)

  • Yun Won-Young;Lee You-Hyoun;Ha Young-Ju;Kim Gui-Rae;Son Beom-Sin
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.06b
    • /
    • pp.363-366
    • /
    • 2006
  • In the port, Yard Crane is very important. If container crane or transfer crane broke down, it costs much money for delaying of work during the period of repair or reorder. But, we can not have enough spare parts for its high cost. It is necessary for having the reliability of crane through the effective preventive maintenance and failure analysis. In this paper, we analysed the system's function and failure mechanism of transfer crane which is main equipment in the yard. Also, we standardized the failure and maintenance work using the historical data of failure and maintenance. This study which is the basic work for IT of equipment operation and maintenance is going to be new attempt for optimal design of next generation equipment and operation policy of equipment.

  • PDF

Position Calibration System of Automatic Transfer Crane (자동 트랜스퍼 크레인의 위치보정 시스템)

  • 박경택;박찬훈;신영재;강병수
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.515-520
    • /
    • 2002
  • Automatic Transfer Crane is needed for automation of container terminal. It requires the control capability of exact position for loading/unloading job in yard. But it has the limitation of improvement because it has the operational environmental and its structural problems. It has the positioning errors caused by the deformation of rail, yawing motion of crane, wear of wheel, sliding motion between wheel and rail and so on. This study shows the calibration method of crane position by using the primitivity sensor and calibrating plate fixed on the ground.

  • PDF

Anti-Sway and Position Control of Overhead Crane Using the LQ Controller (LQ 제어기를 이용한 천정 크레인의 흔들림 억제 및 위치제어)

  • Choi, B.S.;Park, J.W.;Son, J.K.;Kwon, S.J.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2753-2755
    • /
    • 2003
  • Overhead crane must do to control occurrence of Anti-Sway according to work situation that is used in case move industry spot's heavy freight, and do safe transfer of freight. Transfer process that make use of crane suspends and consist of series action that put down freight to do relevant addition decreasing the speed before objective while move by schedule section equal speed because increasing the speed after lift thing. This need skill degree by experience because there are operator's function and affinity. Also, must control this effectively because can affect big productivity elevation according to effect that get in transfer of safe freight, Therefore, illuminate physical characteristic of crane and algorithm of motor drive department and there is purpose of this research to do so that correct control may be available through over head crane's shaking control and position control designing LQ controller.

  • PDF

Modeling and Anti-sway Control of a Container Crane (컨테이너 크레인의 모델링 및 흔들림 억제 방법)

  • Lim, Chang-Jin;Kim, Heung-Geun;Choi, Jong-woo
    • Proceedings of the KIEE Conference
    • /
    • 2004.10a
    • /
    • pp.196-198
    • /
    • 2004
  • In this paper, the container crane which transports containers between a container ship and trucks in the harbor is modeled. The equation of motion is simplified for control purpose. The pole placement technique is used to control the crane to minimize load swing angle The objective of the control is to transfer the load as quickly as possible, while minimizing the amplitude of swing at the end of transfer. Computer simulations are provided.

  • PDF