• 제목/요약/키워드: train voltage

검색결과 231건 처리시간 0.031초

극 배치 기법을 이용한 양방향 DC-DC 컨버터의 제어기 설계 (Controller design of a bidirectional DC-DC converter based on pole-assignment)

  • 노세진;손경민;최재호
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2008년도 추계학술대회 논문집
    • /
    • pp.221-223
    • /
    • 2008
  • In Korean urban transit system, when the railcar starts, the electric power is absorbed from the line, and then the line voltage is instantaneously collapsed to provide a large accelerating torque. On the other hand, when the railcar brakes, the regenerative power is created and it increases the line voltage at the pantograph of the railcar. Therefor, by using the energy storage system near the train, the regenerated power can be saved to this system. The energy storage system is consisted of supercapacitor and a bidirectional DC-DC converter. In this paper, controller design of a bidirectional DC-DC converter based on pole-assignment is proposed. This method can be easy to design controller. Simulation results by using the calculated parameters are presented.

  • PDF

단상 NPC Module- 3직렬 Cascade 구성 방식의 75KVA급 단상 지능형 변압기 개발 (Single Phase NPC Module - Development of 75KVA Single Phase Smart Transformer with 3 Serial Cascade Configuration)

  • 박주영;니이테게카;조경식;김명룡;박가우
    • 전력전자학회논문지
    • /
    • 제22권2호
    • /
    • pp.118-125
    • /
    • 2017
  • In this paper, we propose a smart transformer for a smart transformer miniature model, which can replace a 60 [Hz] single-phase transformer installed in an electric vehicle. The proposed smart transformer is lighter than a conventional transformer, can control instantaneous voltage, and can be expected to improve power quality through harmonic compensation. The proposed intelligent transformer consists of an incoming part, an AC/DC converter, and a dual active bridge. Only the incoming part and the AC/DC converter are described in this paper. The proposed intelligent transformer has 75 kVA 3.3 kV input and 750 V DC output, which are verified by simulation and experiment.

STATCOM을 이용한 교류 전기철도 급전시스템의 전압강하 보상 (Compensate Voltage Drop for Autotransformer-Fed AC Electric Railroad System with Single-Phase STATCOM)

  • 정현수;이승혁;김진오
    • 조명전기설비학회논문지
    • /
    • 제16권5호
    • /
    • pp.53-60
    • /
    • 2002
  • 본 논문에서는 정전류 부하모델 교류 전기철도 AT 급전시스템을 회로망 해석법(Loop Equation Method)을 이용하여 실제 급전시스템과 유사하게 제약조건을 두고 여러 경우를 가정하여 모델링 하였다. 이 방법을 통해 앞으로 건설될 고속 전기철도 급전시스템의 전력품질에 영향을 줄 수 있는 전압강하에 주안점을 두고 정상급전의 경우뿐만 아니라 연장급전의 경우를 새롭게 확대 해석하였으며 이 결과를 동적 시뮬레이션 프로그램인 PSCAD /EMTDC를 이용하여 그 정확성과 실용성을 검증하였다. 또한 사례연구를 통해 전압 보상기를 설치하지 않는 경우와 STATCOM을 설치한 경우의 전압강하 보상효과를 PSCAD/EMTDC로 시뮬레이션 하여 검증하였다.

전기철도 AT 급전시스템에서의 TSC-SVC를 이용한 전압강하 보상 (Compensation of Voltage Drop Using the TSC-SVC in Electric Railway Power Supply System)

  • 정현수;방성원;김진오
    • 조명전기설비학회논문지
    • /
    • 제16권3호
    • /
    • pp.29-36
    • /
    • 2002
  • 최근 들어 국내 전기철도가 고속 대용량화되고 새로운 전력반도체 기술이 전력변환장치에 채용되면서 이로 인해 AT급전계통에 전압강하 등 전력품질 문제가 대두되고 있다. 지금까지 급전계통의 전압강하 대책으로는 직렬콘덴서(SC)를 주로 설치/운용하였으나 기술적인 한계로 인해 충분한 효과를 달성하지 못하고 있으며 고조파 공진현상도 새롭게 문제시 되고 있다. 또한 신규 전기철도 건설에 따른 전철변전소 위치확보 문제와 운행선로에서의 수송량 증가에 따른 열차 증량편성 및 시격(열차운행시간 간격)단축으로 인한 부하 중대가 예상되고 있으며, 급전사고로 인한 인근 전철변전소로부터의 연장급전 운용 등도 고려해야 하므로 이에 따른 급전시스템의 전압강하 및 전력품질 보상 대책이 요구되고 있다. 따라서 본 논문에서는 효과적인 보상대책 설비의 하나로 TSC방식 SVC를 전기철도의 AT 급전시스템에 적용하는 방안을 검토하고 PSCAD/EMTDC를 이용하여 시뮬레이션을 통해 확인하였다.

AF궤도회로의 전기적 구분 장치 설치이전에 따른 커패시터 보상으로 LC공진 주파수 대역의 전압특성 분석 (An Analysis of Voltage Characteristics for LC Resonant Frequency Band of Capacitor Compensation According to Moving of Electrical Separation Equipment of AF Track Circuit)

  • 원서연;최재식;박주훈;김희식
    • 전기학회논문지
    • /
    • 제65권8호
    • /
    • pp.1466-1477
    • /
    • 2016
  • This paper analyzes the electrical characteristic such as the impedance(Z), inductance(L), and cable resistance($R_p$) according to the change of cable length in order to move the electrical sorting device for distinguishing between AF non-insulated track circuits from the center of railway to outside railway. The simulation is performed to check the voltage difference between the voltage of sender and the voltage of receiver and determine the possibility of the voltage restoration availability in the frequency filter band through the capacitor compensation. It was applied to the results of the simulation to the sorting devices installed in the actual field. It is proved the availability by checking the measured voltage characteristic according to the capacitor compensating change of $10{\mu}F$ and $16{\mu}F$ before, and after the length of cable is increased with 6 meters. Through this, the prevention of breakdown and damage to facilities and the prevention the safety-related accidents of line workers from the train are expected according to moving the sorting devices of AR non-insulated track circuits to outside railway.

전기철도 단권변압기 중성점 탭절환 특성연구 (Parametric Study for Variable Tap of Autotransformer Neutral in AC Feeding)

  • 한문섭;이장무;김재원;창상훈
    • 전기학회논문지
    • /
    • 제67권1호
    • /
    • pp.137-141
    • /
    • 2018
  • The voltage drop is important in electric railway for feeding a huge power of train on fixed feeding area. Nowadays it is tried to operate a high speed trains on conventional lines and there is problem on the voltage drop too. It is simulated on the conditions increased the turn ratio of trolley, installed autotransformer neutral line with variable taps. In result, it is compensated the voltage drop between ATs and better on last AT, not on the position of AT. And it is decreased a return current and neutral current of AT because of unbalance between trolley and feeder. It should be studied faster and more controllable the solid state switchs instead of the mechanical one in order to utilize this system.

회생에너지 저장시스템이 제동 브랜딩 안정화에 미치는 영향 (The Effect of Regenerative Energy Storage System on Stabilization of Electro-Pneumatic Braking Blending)

  • 김규중;이근오
    • 한국안전학회지
    • /
    • 제25권5호
    • /
    • pp.15-21
    • /
    • 2010
  • Regenerative Energy Storage System(ESS) is a system that saves regenerative energy which generated instantly in the regenerative braking of Electric Multiple Unit(EMU) and disappear, and reuse the stored energy when EMU is in powering. Such system related to a research field of renewable energy which emerged concerning climate change and high oil prices. In the case of existing domestic rolling stock, about 25% to 30% of generated regenerative energy is restored to power source and is regarded as direct factor of raising catenary voltage. Such rapid change of catenary voltage is a cause of the failure of EMU's electronic equipment and lowering its reliability and is also a cause of train's fault occurred by tripping circuit breaker. In this paper, we intend to investigate the effect on blending characteristics of electric-braking and pneumatic-braking whether the regenerative energy storage system is used or not in urban transit DC 1,500V feeding system, while trains run. And we also intend to investigate its effect on stabilization of the blending, fluctuation of catenary voltage and various electric equipments.

DC전철구간의 에너지회생장치 개발 방향 (Direction for Development of Energy Regeneration Device for DC Electric Railway System)

  • 김용기;배창한;한문섭;양영철;장수진
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.804-808
    • /
    • 2007
  • when electric traction system used DC 1500V runs on decline of rail road track and slows down, Dc voltage goes beyond regular voltage. In this case extra power is forcibly wasted by resister because rectifier of substation and electric train including power converter and so on are out of order. This paper described a DC electric railway system, which can generate the excessive DC power form DC bus line to AC source in substation for traction system. The proposed regeneration inverter system for DC traction can be used as both an inverter and an active power filter(APF). As a regeneration inverter mode, it can recycle regenerative energy caused by decelerating tractions and as an active power filter mode, it can compensate for harmonic distortion produced by the rectifier substation. In addition, electric traction system products harmonic current and voltage distortion and reactive power because power converter is used so regeneration inverter normally runs such as active power filter(APF) for improving power quality. From the viewpoint of both power capacity and switching losses, the system is designed on the basis of three phase PWM inverters and composed of parallel inverters, output transformers, and an LCL filter.

  • PDF

도시철도의 직류전력 공급을 위한 사이리스터를 사용한 병렬 듀얼 컨버터의 순차적 모드 전환 제어 알고리즘에 대한 연구 (A Studies for Sequential Mode Change Control Algorithm of the Parallel Dual Converter of Using Thyristor for Supplying the Urban Railway DC Power)

  • 한성우;김성안;조윤현;변기식
    • 전기학회논문지
    • /
    • 제65권3호
    • /
    • pp.511-519
    • /
    • 2016
  • This paper is proposed control algorithm for the using thyristor of the parallel dual converter for Urban railway power supply in order to return the regenerative power generated by regenerative braking in urban railway train. Conventional control algorithm of Thyristor dual converter for urban railway power supply has voltage variation within a control range of hysteresis band. The purposed control algorithm of the parallel thyristor dual converter is to maintain a constant voltage without voltage variation in accordance with variable load through the Sequential mode change. And the control algorithm need calculating optimum initial firing angle to consider magnitude of the load current slope. For this purpose, Proposed algorithm for sequential conversion mode of the dual converter was verified by applying for the simulation.

위상전이 풀-브리지 DC/DC 컨버터를 이용한 차세대 고속 전철용 Battery Charger에 관한 연구 (A Study on Battery Chargers for the next generation high speed train using the Phase-shift Full-bridge DC/DC Converter)

  • 조한진;김근용;이상석;김태환;원충연
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2009년도 춘계학술대회 논문집
    • /
    • pp.384-387
    • /
    • 2009
  • There is an increasing demand for efficient high power/weight auxiliary power supplies for use on high speed traction application. Many new conversion techniques have been proposed to reduce the voltage and current stress of switching components, and the switching losses in the traditional pulse width modulation (PWM) converter. Especially, the phase shift full bridge zero voltage switching PWM techniques are thought must desirable for many applications because this topology permits all switching devices to operate under zero voltage switching(ZVS) by using circuit parasitic components such as leakage inductance of high frequency transformer and power device junction capacitance. The proposed topology is found to have higher efficiency than conventional soft-switching converter. Also it is easily applicable to phase shift full bridge converter by applying an energy recovery snubber consisted of fast recovery diodes and capacitors.

  • PDF