• Title/Summary/Keyword: train loads

Search Result 232, Processing Time 0.024 seconds

A Study on Behavior of Concrete Slab Track subjected to High Speed Train Loads (고속열차하중을 받는 슬래브궤도의 동적거동에 관한 연구)

  • 조병완;김영진;허민회;정태호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.493-598
    • /
    • 2000
  • In the rail facilities, the rail track consists of rail, tie, fastening, accessories and bed. The rail track is largely divided into Ballast Bed Track (BBT) and Concrete Bed Track (CBT) according to the type of bed. In this thesis, among Concrete Bed Track, slab track, which is used for the Japanese high speed railway, is a target of this study. Dynamic analysis by using finite element method are performed where moving train load is periodic function. Then through parametric study, some conclusions are obtained as follows. Cement Asphalt Mortar (CAM) affects contrary mechanical behavior to rail and slab greatly. Therefore, change of CAM spring coefficient should be handled with care. For slab thickness, thin slab is more profitable to reduction of vibration of rail than thick one but mechanical capacity of slab is deteriorated. Improved structural type is proposed, then structural analysis is performed for this one. This type is effective to reduction of vibration of railway system.

  • PDF

Long-Term Measurement under the Moving train at the Test Reinforced Roadbed Site in Railway (철도강화노반 시험부설구간에서의 열차 주행시 장기거동 계측)

  • 황선근;신민호;이성혁;최찬용;이시한
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.223-230
    • /
    • 2001
  • Nine different types of the reinforced railroad roadbeds which . are located in between Suwon-Chunan station of Kyongbu line were constructed in order to increase the bearing capacity of railroad roadbed and to improve the ridability as a part of speed-up project of conventional railroad systems. Each three sections were composed of weathered granite soil, crushed stone and furnace slag(HMS25), and fully instrumented with earth pressure cells, settlement plates and geophones to monitor the behavior of roadbeds under actual train loads. Field measurement has continued since October 31, 2000 and presently with rather longer measurement interval. The measurement data such as settlement, earth pressure and vibration levels are currently under analysis process. In this paper, only cumulative measurement data of railroad roadbeds were introduced. In the near future, comprehensive measurement data and result of analysis will be presented and design technique for the reinforced railroad roadbed will be proposed as a final product of this study.

  • PDF

Characteristics of Behavior of the Crushed Stone Reinforced Roadbed under Cyclic Loading (동적하중 재하시 쇄석강화노반의 거동 특성)

  • 황선근;이성혁;이일화;최찬용
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.525-532
    • /
    • 2001
  • In this study, performance of reinforced railroad roadbeds with the crushed stones was investigated through the real scale railroad roadbed tests. Several real scale reinforced railroad roadbeds were constructed in the laboratory with different subgrade conditions and were tested with the estimated actual train loads including the impact loading of train. The affecting factors such as settlement, earth pressure and stress change at the surface of reinforced roadbed, subgrade layers as well as surface of rails were measured. It was found through the actual testing that for the roadbed with the same thickness, the settlement and vibration level (velocity) of reinforced roadbed decreases with the increase of reaction modulus of subgrade. The settlement of reinforced roadbed with the same reaction modulus of subgrade also decreases with the increase of thickness of the reinforced roadbed.

  • PDF

Simulation Technique of Wind Turbine Dynamic Behavior using Multibody FEM Analysis (탄성 다물체 동역학 해석기법을 이용한 풍력터빈 드라이브트레인의 동특성 해석)

  • Lee, Seung-Kyu;Lim, Dong-Su;Park, Young-Su;Kim, Jin;Choi, Won-Ho
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.817-821
    • /
    • 2008
  • Wind turbine requires service life of about 20 years and each components of wind turbine requires high durability, because installation and maintenance costs are more expensive than generated electricity by wind turbine. So the design of wind turbine must be verified in various condition before production step. This paper demonstrates the application of a generic methodology, based on the flexible multibody simulation technique, for the dynamic analysis of a wind turbine and its drive train. The concern of the paper is the computation of dynamic loads of wind turbine in emergency-stop condition. The finite element model is used to analyse the dynamic behaviour of the wind turbine.

  • PDF

Compensation of Voltage Drop Using the SVC in Electric Railway Power Supply System (SVC를 이용한 전기철도 급전시스템에서의 전압강하 보상)

  • Bang, Seong-Won;Jung, Hyun-Soo;Jung, Chang-Ho;Kim, Jin-O
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.289-291
    • /
    • 2001
  • This paper represents the application of the Static Var Compensator (SVC) on the electric railway power supply system to compensate for the voltage drop. The high reactance of line and a heavy train load consume a significant amount of the reactive power which results the voltage drop. This paper shows that the SVC is necessary for voltage compensation in the railway power supply system and verify effectiveness of the SVC through the simulation by using PSCAD/EMTDC. In this paper, the case studies were performed with the various line length and train loads.

  • PDF

A study on the characteristic of ballast fracture by M.T.T. works (MTT작업에 의한 도상자갈 파쇄특성에 관한 연구)

  • Lee, Choon-Kil;Kim, Nam-Hong;Woo, Byoung-Koo;Kim, Yong-Hyok;Kim, Kwan-Hyung;Lee, Sung-Wook
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.268-273
    • /
    • 2008
  • The ballast, one of track components, plays an essential role as intermedium in transmitting train load to subgrade safely, and the deterioration of ballast directly effects the growth of track irregularity. So far, gravel fining of ballast track was mainly related to the repetition of train loads, but was gradually increased with using MTT(Multiple Tie Tamper) recently. Therefore, in this study, an evaluation of the abrasion and crush process of ballast particles was performed with outdoor field test by MTT works. From this study, the amount of abrasion and crush of ballast particles appeared to increase linearly with MTT works, and the gradient of particle size distribution curve appeared to deviate gradually from a criterion of aggregated ballast size distribution in high-speed railroad.

  • PDF

Dynamic Behavior of a Open-Deck Steel Bridge considering Surface Irregularities of Rail Joints (레일이음매에 의한 주행면 불규칙성을 고려한 판형교의 동적거동)

  • Kim Sung-Il;Kim Hyun-Min;Oh Ji-Taek
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1028-1033
    • /
    • 2004
  • The open deck steel bridge is the most common type in railway bridges. Steel I-shaped girders are connected with sleepers directly without ballast and moving train loads are transmitted directly to the girder, so this bridge has weak characteristics on impact. Therefore, considerable accelerations can cause unsatisfactory dynamic behavior of the open deck steel bridge. Especially, Impact created at rail joints can increase the dynamic response of the bridge and this phenomenon would be injurious to passenger comfort. In the present study, dynamic behavior of the open deck steel bridge which has a rail joint is estimated through experimental studies and bridge-train interaction analysis considering surface irregularities by rail joints.

  • PDF

Dynamic analysis of coupled wind-train-bridge system considering tower shielding and triangular wind barriers

  • Zhang, Nan;Ge, Guanghui;Xia, He;Li, Xiaozhen
    • Wind and Structures
    • /
    • v.21 no.3
    • /
    • pp.311-329
    • /
    • 2015
  • A method for analyzing the coupled wind-vehicle-bridge system is proposed that also considers the shielding effect of the bridge tower with triangular wind barriers. The static wind load and the buffeting wind load for both the bridge and the vehicle are included. The shielding effects of the bridge tower and the triangular wind barriers are incorporated by taking the surface integral of the wind load. The inter-history iteration is adopted to solve the vehicle-bridge dynamic equations with time-varying external loads. The results show that after installing the triangular wind barriers in the area of the bridge tower, the bridge response and the vehicle safety factors change slightly. The peak value of the train car body acceleration is significantly reduced when the wind barrier size is increased.

Dynamics of a bridge beam under a stream of moving elements -Part 2 - Numerical simulations

  • Podworna, M.
    • Structural Engineering and Mechanics
    • /
    • v.38 no.3
    • /
    • pp.301-314
    • /
    • 2011
  • The paper constitutes the second part of the author's study. The first part (Podworna 2010) formulates four fundamental tasks in dynamics of the bridge-track-train systems. The following cyclic moving loads are considered: a concentrated forces stream (model P), an unsprung masses stream (model M), a single-mass viscoelastic oscillators stream (model $M_o$) and a double-mass viscoelastic oscillators stream (model $MM_o$). Three problems precluding to the numerical simulations have been developed, i.e., prediction of the forced resonances, the parameters of integration of equations of motion, the output results. A computer programme was written in Pascal and numerical research in the scope of the fundamental tasks was worked out. The investigations were focused on adequacy evaluation of the moving load models, P, M, $M_o$, $MM_o$, in predicting dynamic processes in railway bridges.

A Study on the Mechanical Behavior of Resilient Sleeper in Concrete Bed by Connection (콘크리트 도상 방진 침목의 연결재 유·무에 대한 역학적 거동 고찰)

  • Kim, Sung-Chil;Lee, Ki-Sung;Kim, Jun-Hung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.2 no.1
    • /
    • pp.121-128
    • /
    • 1998
  • The rail, which supports the train road, distributes the wheel loads to the tie by rail stiffness. Subway sleeper on concrete ballast is construction of PC or RC sleeper. The present, PC sleeper is constructed of line 1, 2, 3, 4 Seoul Subway and RC sleeper is planing construction for the STEDEF system on concrete ballast of the line 5, Seoul, Taegu, and Kwangju Subway. The major purpose of this study is to check influence of the angle with analysising the behavior of sleeper according to the existent or non-existent of angle. And the study is carried to check static analysis by manufacture of same model.

  • PDF