• 제목/요약/키워드: track-bridge system

검색결과 124건 처리시간 0.027초

경전철 직결식 콘크리트 궤도구조의 열차주행안전성 평가 (Evaluation of Train Running Safety for Direct Fixation Concrete Track on Light Rapid Transit)

  • 최정열;김준형;정지승;이선길
    • 한국안전학회지
    • /
    • 제32권5호
    • /
    • pp.41-46
    • /
    • 2017
  • The coefficient of derailment and the rate of wheel load reduction were used as the index of train running safety that was directly affected the train derailment safety. In aspects of track, the train running safety depends on the complex interaction between wheel and rail, and the track-vehicle conditions (i.e., the curvature, cant, track system, vehicle speed and the operation conditions, etc). In this study, the relationship between the train running safety and the track curvature and vehicle speed for direct fixation concrete tracks currently employed in Korean light rapid transit was assessed by performing field tests using actual vehicles running along the service lines. The measured dynamic wheel load, lateral wheel load and lateral displacement of rail head were measured for same train running on four tested tracks under real conditions, which included curved and tangent tracks placed on the tunnel and bridge, thus increasing the train speed by approximately maximum design speed of each test site. Therefore, the measured dynamic track response was applied to the running safety analysis in order to evaluate the coefficient of derailment, the rate of wheel load reduction and the track gauge widening at each test site, and compare with the corresponding Korean train running safety standard. As the results, the lateral track response of direct fixation concrete track appeared to increase with the decreased track curvature; therefore, it was inferred that the track curvature directly affected the train running safety.

도시철도 실시간 모니터링 시스템 적용 사례 (Application of 5678SMRT Real-time Monitoring system)

  • 윤재관;박종헌;김기춘
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.737-747
    • /
    • 2011
  • 5678SMRT has installed various sensor for operating conditions(field of electric, facilities, signal, communication equipment and track) and environment of Every Function Room for remotely detecting and monitoring. Installed sound sensor for analyzed after remotely heard the noise of every equipment at Every Function Room and temperature sensor for check the temperature condition of Every Function Room. Additional installed voltage sensor in signal equipment room for monitoring RF track-circuit's voltage condition. Installed displacement sensor at The Chungdam bridge's railway for measuring and monitoring track displacement caused by temperature change and Pan/Tilt camera at sub-station and drainage for remotely field monitoring. Installed sensor for each equipment's operating condition and failure at Every Function Room then periodic check of workforce turned to around-the-clock surveillance by sensor therefore improvement of operating equipment. SMRT is lots of prevent a failure by Immediately detect of precondition of equipment failure by analyzed the sensor data. If the occurrence of an failure, become detected Immediately so possibility correct diagnosis and order by remotely field check by installed camera and sound sensor at field.

  • PDF

Economic and Fast-track Rehabilitation of Concrete Pavements and Bridge Decks

  • Ramseyer, Chris;Chancellor, Brent;Kang, Thomas H.K.
    • International Journal of Concrete Structures and Materials
    • /
    • 제2권2호
    • /
    • pp.107-113
    • /
    • 2008
  • The last 10 years have seen considerable growth in the use of proprietary and special repair cements for concrete pavements in the state of Oklahoma. Many of these products lend themselves to "fast track" construction techniques that allow reopening to traffic within 12 hours or less. These products achieve high early strengths by accelerating the Portland cement hydration process for both Type I and Type III cements. In this paper, the important features of a durable repair which include strength, compatibility and bond or adhesion are first discussed. Then the development, testing and field implementation of the aforementioned materials are discussed including the learning curve required to implement a repair system, not just install a new material. Some of the materials discussed, while expensive on a cost per unit basis, hold great promise for economical use on fast track project.

이동하중에 의한 지지강성 변화구간에 대한 실험적 연구 (Experimental Study of Stiffness transition zone by using Moving Wheel Loads)

  • 이진욱;최찬용;이성혁;박태환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1056-1061
    • /
    • 2007
  • Railroad roadbed was consisted into structure types that earthwork, tunnel, bridge and joint sections. Joint section was affected a large factor confidence and safety of the train running by stiffness transition zone that track substructure stiffness change section as like between tunnel and earthwork from ballast track to concrete track. These problems are the results of increased dynamic wheel loads, which also lead to wear and tear on vehicle components and contribute to poor ride quality. The study presented in this paper was conducted on model test by using Wheel Moving Loading System.

  • PDF

타설 경계면을 고려한 슬라이딩 궤도 횡방향 지지 콘크리트 블록의 전단 내하력 평가 (Evaluation of Shear Load Carrying Capacity of Lateral Supporting Concrete Block for Sliding Slab Track Considering Construction Joint)

  • 이성철;장승엽;이경찬
    • 한국전산구조공학회논문집
    • /
    • 제30권1호
    • /
    • pp.55-61
    • /
    • 2017
  • 최근 콘크리트 궤도 슬래브 하면과 교량 바닥판 사이에 저마찰 슬라이드층을 형성하는 궤도 시스템인 슬라이딩 궤도와 관련된 연구가 활발히 진행되고 있다. 본 연구에서는 슬라이딩 궤도에서 열차 주행에 따른 횡방향 하중을 저항하기 위해 설치되는 횡방향 지지 콘크리트 블록의 전단 내하력에 대한 연구를 수행하였다. 횡방향 지지 콘크리트 블록의 전단 내하력 산정을 위해 타설경계면에서의 콘크리트 마찰 및 철근의 다월 거동을 고려한 산정 기법을 개발하다. 제안된 산정 기법은 기존의 실험에서 측정된 전단 내하력을 13~23% 정도 보수적으로 예측하는 것으로 나타났다. 이는 균열면 골재 맞물림 효과를 무시한 것에 따른 것으로, 현장에서의 타설경계면 상태가 불확실한 것을 고려할 때 횡방향 지지 콘크리트 블록에 대한 안전측 설계를 위해 제안된 산정 기법이 합리적인 것으로 판단된다. 제안된 전단 내하력 산정 기법을 토대로 횡방향 지지 콘크리트 블록에 대한 설계 방안을 마련하였다.

A theoretical mapping model for bridge deformation and rail geometric irregularity considering interlayer nonlinear stiffness

  • Leixin, Nie;Lizhong, Jiang;Yulin, Feng;Wangbao, Zhou;Xiang, Xiao
    • Steel and Composite Structures
    • /
    • 제46권1호
    • /
    • pp.93-105
    • /
    • 2023
  • This paper examines a high-speed railway CRTS-II ballastless track-bridge system. Using the stationary potential energy theory, the mapping analytical solution between the bridge deformation and the rail vertical geometric irregularity was derived. A theoretical model (TM) considering the nonlinear stiffness of interlayer components was also proposed. By comparing with finite element model results and the measured field data, the accuracy of the TM was verified. Based on the TM, the effect of bridge deformation amplitude, girder end cantilever length, and interlayer nonlinear stiffness (fastener, cement asphalt mortar layer (CA mortar layer), extruded sheet, etc.) on the rail vertical geometric irregularity were analyzed. Results show that the rail vertical deformation extremum increases with increasing bridge deformation amplitude. The girder end cantilever length has a certain influence on the rail vertical geometric irregularity. The fastener and CA mortar layer have basically the same influence on the rail deformation amplitude. The extruded sheet and shear groove influence the rail geometric irregularity significantly, and the influence is basically the same. The influence of the shear rebar and lateral block on the rail vertical geometric irregularity could be negligible.

Investigation of dynamic response of "bridge girder-telpher-load" crane system due to telpher motion

  • Maximov, Jordan T.;Dunchev, Vladimir P.
    • Coupled systems mechanics
    • /
    • 제7권4호
    • /
    • pp.485-507
    • /
    • 2018
  • The moving load causes the occurrence of vibrations in civil engineering structures such as bridges, railway lines, bridge cranes and others. A novel engineering method for separation of the variables in the differential equation of the elastic line of Bernoulli-Euler beam has been developed. The method can be utilized in engineering structures, leading to "a beam under moving load model" with generalized boundary conditions. This method has been implemented for analytical study of the dynamic response of the metal structure of a single girder bridge crane due to the telpher movement along the bridge girder. The modeled system includes: a crane bridge girder; a telpher, moving with a constant horizontal velocity; a load, elastically fixed to the telpher. The forced vibrations with their own frequencies and with a forced frequency, due to the telpher movement, have been analyzed. The loading resulting from the telpher uniform movement along the bridge girder is cyclical, which is a prerequisite for nucleation and propagation of fatigue cracks. The concept of "dynamic coefficient" has been introduced, which is defined as a ratio of the dynamic deflection of the bridge girder due to forced vibrations, to the static one. This ratio has been compared with the known from the literature empirical dynamic coefficient, which is due to the telpher track unevenness. The introduced dynamic coefficient shows larger values and has to be taken into account for engineering calculations of the bridge crane metal structure. In order to verify the degree of approximation, the obtained results have been compared with FEM outcomes. An additional comparison has been made with the exact solution, proposed by Timoshenko, for the case of simply supported beam subjected to a moving force. The comparisons show a good agreement.

접속부의 강성완화를 위한 Approach zone의 매개분석 (Approach zone of parametric analysis for hardness mitigation of connection)

  • 손지현;최진유;오지택;황원섭
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.558-564
    • /
    • 2006
  • When vehicles pass the connection between the bridge and earthwork, the difference of both sections' stiffness produces an increasing wheelload. As a consequence, it results in the excessive vibration of vehicles and the damage of bearing system. In general, steel plate girder railway bridges without ballast track have larger stiffness than the bridge with ballast, and produces larger impulse on the bridge superstructure. Thus, it is necessary to reduce the differences of both stiffness. This study presents parametric studies on the behavior of plate girder bridges and their tracks by means of various stiffnesses and the length of approach zone. The results of numerical study showed that the smaller the stiffness of both sides and the longer the length of approach zone, the variation of wheelload becomes smaller. Hence, it gives less burden into the plate girder bridges and their tracks. It is expected that the results of parametric study can be used as a preliminary data for the determination of economical length on the approach zone and the stiffness of both sides.

  • PDF

낙동강교 ILM 가설에 따른 시공 중 계측 (Measurement during Construction of Nakdong Bridge by Incremental Launching Method)

  • 김형태;조남소;정지만;양성만
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.575-580
    • /
    • 2007
  • As the volume of traffic in southern part of the republic of Korea grew, expansion of transportation was required. In that purpose, the railway between Samnangjin and Gwangyang is being extended to a double-track line. This construction includes Nakdong bridge located across Nakdong river. This truss bridge is constructed in incremental launching method (ILM) and composed of two sections, straight line and curved one. Bridge construction in the method goes with the shift of roller supports which results in the change of structural system. To accomplish safe construction, the measurement during the whole launching stages. The locations of member in severe condition and the corresponding response values were estimated through the preliminary construction stage analysis. Based on the analysis, the measurement during construction was planned. Several sensors and measurement devices were installed at appropriate locations. During the whole launching stages, the measurement was performed and the corresponding data were monitored and stored in real time. The comparison of the responses from the analysis and the measurement showed no indication of yielding of the structural members. Consequently, the construction of Nakdong bridge was concluded to be relevant.

  • PDF

Evaluation of torsional response of a long-span suspension bridge under railway traffic and typhoons based on SHM data

  • Xia, Yun-Xia;Ni, Yi-Qing;Zhang, Chi
    • Structural Monitoring and Maintenance
    • /
    • 제1권4호
    • /
    • pp.371-392
    • /
    • 2014
  • Long-span cable-supported bridges are flexible structures vulnerable to unsymmetric loadings such as railway traffic and strong wind. The torsional dynamic response of long-span cable-supported bridges under running trains and/or strong winds may deform the railway track laid on the bridge deck and affect the running safety of trains and the comfort of passengers, and even lead the bridge to collapse. Therefore, it is eager to figure out the torsional dynamic response of long-span cable-supported bridges under running trains and/or strong winds. The Tsing Ma Bridge (TMB) in Hong Kong is a suspension bridge with a main span of 1,377 m, and is currently the world's longest suspension bridge carrying both road and rail traffic. Moreover, this bridge is located in one of the most active typhoon-prone regions in the world. A wind and structural health monitoring system (WASHMS) was installed on the TMB in 1997, and after 17 years of successful operation it is still working well as desired. Making use of one-year monitoring data acquired by the WASHMS, the torsional dynamic responses of the bridge deck under rail traffic and strong winds are analyzed. The monitoring results demonstrate that the differences of vertical displacement at the opposite edges and the corresponding rotations of the bridge deck are less than 60 mm and $0.1^{\circ}$ respectively under weak winds, and less than 300 mm and $0.6^{\circ}$ respectively under typhoons, implying that the torsional dynamic response of the bridge deck under rail traffic and wind loading is not significant due to the rational design.