• Title/Summary/Keyword: track safety

Search Result 687, Processing Time 0.026 seconds

The Derailment Safety Estimation of DMT Freight for Real Track Condition (실제 선로조건에 따른 DMT 화차의 탈선안전도 평가)

  • Lee, Jong-Seong;Eom, Beom-Gyu;Lee, Seung-Il;Lee, Hi-Sung
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.830-835
    • /
    • 2011
  • DMT Freight is judged that economic performance is good because can increase cargoes than existing freight. However, the existing freight cars, each with a different balance to the body structure is bogie because the vibrations may occur. Thus, by minimizing vibration over the existing freight securing the safety of the driving if you will not have major problems in cargoes. In this study, multi-body dynamic analysis tool, VI-Rail using the actually Gyeongbu Railroad line and an empty, full freight condition include curve radius, track irregularity, cent. DMT freight of the derailed wagons were assessed for safety analysis. Full and empty freight conditions for parity in the Gyeongbu Railroad line(Dongdaegoo ${\leftrightarrow}$Gyungsan) derailment safety analysis, such as derailment safety coefficient and the radius wheel road decrement, echoing the curve and the orbit is affected by the irregularity was found. Full freight condition than the empty conditions showed a significant derailment safety. Overall, the limits of derailment coefficient (Q/P=0.8) and wheel road decrement limits (${\Delta}P/P=0.6$) is less safe with me confirmed that the derailment safety.

  • PDF

A Cause Analysis of the Construction Incident Using Causal Loop Diagram : Safety Culture Perspective (인과지도를 활용한 건설 안전사고 원인 분석 : 안전문화 관점)

  • Choi, Yun Gil;Cho, Keun Tae
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.34-46
    • /
    • 2020
  • Unlike research focused on existing technologies and individual errors to analyze the causes of incidents, this study approached them from an organization and culture. And this study is not a one way study but cyclical study what can track cause down using causal loop diagram methodology. Four diagnostic criteria for the negative state of the safety culture : secretive, blame, failure to learning, and incremental learning, combine literature study and expert opinion to derive 41 variables. Connecting these variable make 4 causal loop diagrams and total causal loop diagram. Case accumulation in secretive, accident report in blame, knowledge accumulation in failure to learning, near miss discovery in incremental learning are the main variables. Safety incident is the objective variable by classifying them into 4 stages in total loop, leading track as the most affect is case accumulation, and Step 4 as you can see accident report and near miss discovery are the result of tracking down the cause. This study can be used as a basis for improving the management priority and the system in incident prevention.

Landscape Design Method of Bridges and Visual Safety Estimation of Structural Shape (교량의 경관설계 방법과 구조형상의 시각적 안전성 평가)

  • Yang, Seung Hyoun;Shiomi, Hiroyuki
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.2 no.3
    • /
    • pp.235-244
    • /
    • 1998
  • In the design of bridges, the points of concem are the landscape design, the function, safety and economical efficiency. But most of studies have been performed on structural engineering. The study on the landscape design of bridges has not been done in korea. Therefore, in this research, the design method of bridges by the judgement of structural engineering and landscape engineering has been proposed, through the process to decide the shape of bridges. Also, the research studies a problem about the visual safety of the structural shape in the landscape design of bridges. The visual experiments applied to the seven models about the shape of hunch in bridge pier. The experiment was made in moving velocity of view point, steady looking time and track of eyeball movement.

  • PDF

A Study on the Improvement for the Implement Way of a Substitute Block System (대용폐색방식 시행방법 개선에 관한 연구)

  • Song, Nak-Kyoon;Kim, Hae-Gon;Kim, Ho-Soon;Joo, Chang-Hun;Kim, Dae-Sik
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1860-1871
    • /
    • 2011
  • Presently, The Regular Block System(Automatic, Interlocking block system) is usually used during the operation of block section. However, In case that the regular block system fails because of the failure of the fixed signals and block equipment or in case of the unexpected emergent situation which should drive on the single-track due to the accidents in the double-track section or the repair work of the one-track, the Substitute Block System to make use of the driving permission license(mapping ticket, mapping paper) is used. In case of the operation of the opposite line and the temporary one-track, the safety gets worse and the SBS may cause the fatal accidents such as a head-on & a rear-end collision. Also, the unmanned railroad stations has recently increased owing to the effective operation of the stations, for it is difficult to execute the SBS in their absence. As a result, the increase of the operation time made the train delayed. Being on the rise of these problems, in this study, we analyzed the problems and difficulties of the SBS on the single line which is lacking stability and safety and on the sections combined between maned and unmaned railroad stations. And we proposed the method to improve the existing drive permission license used for 50 years into the brand-new one with state-of-the art technology and scientific way. In the era of the 21th century, Carrying out the new SBS equipped with stability and safety, we will contribute to the effective operation of trains and the satisfaction of our customers in the future.

  • PDF

Parametric Study on Steel composite Girder bridges for HONAM High-Speed Railway Considering Criteria Requirement of Dynamic Response (호남고속철도 동적 안정성 요구 조건을 고려한 강합성 거더교의 변수 연구)

  • Cho, Sun-Kyu;Jung, Han-Ouk;Kim, Sung-Il
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1370-1378
    • /
    • 2007
  • High speed railway bridge is affected on safety of bridge by dynamic amplification effect, when dynamic response of bridge is equal to effect cycle load for rolling stock axle according to high speed operation train. And excessive deformation of structure has negative effect on operation safety of train and comfort of passenger due to fluctuation of wheel load by torsion of track etc. and decrease of contact force on vehicle wheel-rail. To ensure the safety of track and train operation safety, it is have to perform the study on resonance and deformation of structure. That criteria and requirement of railway bridge is limitation of vertical acceleration on deck for dynamic behavior of structure, contact of vehicle wheel and rail, limitation of face distortion and rotation angle of end deck, and limitation of vertical displacement by train. Unlike KYEONGBU High Speed Railway, New constructed HONAM High Speed Railway have to applied the new requirement for dynamic behavior safety according to change of condition which is type of ballast (slab ballast), interval of track, and actual rolling stock load. Therefore, in this paper, it was conformed the dynamic characteristic due to parameter, which related with above mentioned criteria, for steel composite bridges.

  • PDF

Influence of Vehicle Vibration on Track Geometry Measurement (차량 진동이 궤도 선형 측정에 미치는 영향)

  • Bae, Kyu-Young;Yong, Jae Chul;Kim, Lee-Hyeon;Kwon, Sam-Young
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.26 no.6_spc
    • /
    • pp.644-650
    • /
    • 2016
  • Track maintenance works based on track geometry recordings are essential to enhance the safety and comfort of railway transportation. Usually, the track irregularity has been measured by a special inspection trains which all were imported from abroad. Because the inspection train speed is limited under 160 km/h, it takes a long time to inspect railways and there is difficulty in daytime operation. To solve this problem, we started to develop a track geometry measuring system (TGMS) with measurement speed up to 300 km/h which can be installed in commercial vehicles such as HEMU-430X. In this paper, we introduce a newly developed inertial TGMS and propose two inertial navigation system (INS) algorithms (method A, B) for measuring track geometry. In order to investigate advantage and disadvantage of each algorithm, we performed vibration test of the TGMS, which was simulated by 6-axis shaking table. Through the vibration test, we analyzed the influence of vehicle vibration on the TGMS which will be installed on bogie frame. To the vibration test, two methods satisfied the required accuracy of track geometry measurement under the level of the actual vehicle vibration of HEMU-430X train. Theoretically, method A is sensitive to vehicle vibration than method B. However, HEMU-430X's bogie vibration frequency range is out of interest range of measurement system. Therefore, method A can also apply the HEMU-430X train.

Continuous deformation measurement for track based on distributed optical fiber sensor

  • He, Jianping;Li, Peigang;Zhang, Shihai
    • Structural Monitoring and Maintenance
    • /
    • v.7 no.1
    • /
    • pp.1-12
    • /
    • 2020
  • Railway tracks are the direct supporting structures of the trains, which are vulnerable to produce large deformation under the temperature stress or subgrade settlement. The health status of track is critical, and the track should be routinely monitored to improve safety, lower the risk of excess deformation and provide reliable maintenance strategy. In this paper, the distributed optical fiber sensor was proposed to monitor the continuous deformation of the track. In order to validate the feasibility of the monitoring method, two deformation monitoring tests on one steel rail model in laboratory and on one real railway tack in outdoor were conducted respectively. In the model test, the working conditions of simply supported beam and continuous beam in the rail model under several concentrated loads were set to simulate different stress conditions of the real rail, respectively. In order to evaluate the monitoring accuracy, one distributed optical fiber sensor and one fiber Bragg grating (FBG) sensor were installed on the lower surface of the rail model, the strain measured by FBG sensor and the strain calculated from FEA were taken as measurement references. The model test results show that the strain measured by distributed optical fiber sensor has a good agreement with those measured by FBG sensor and FEA. In the outdoor test, the real track suffered from displacement and temperature loads. The distributed optical fiber sensor installed on the rail can monitor the corresponding strain and temperature with a good accuracy.

Parametric Study of the Effects of Train Wind on Turnover Safety (차량 전복 안전성에 끼치는 열차 풍압의 파라메타 연구)

  • Nam, Seong-Won
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.961-966
    • /
    • 2009
  • When constructing a high-speed railroad, the reduction of the distance between track centers and the width of track bed will save the construction cost. However the shortening the distance between track centers may cause the stability problems due to higher wind pressure. Therefore the extensive technical review and aerodynamical study should be performed to determine the adequate distance between track centers. In this study, the impact that the increase in wind pressure due to the change of aerodynamic phenomena with the change of the distance between track centers may have on two trains passing by each other was predicted, and the stability of train operation was analyzed in order to review the distance between track centers suitable to Honam HSR trains. We conducted the parametric study of the effects of train wind on the running stability.

Development of Verification System and Selection Process for Track Structure (궤도구조 성능검증체계 및 선정프로세스 구축)

  • Lee, Ho-Ryong;Jang, Seung-Yup;Kim, Yeon-Guk;Yun, Sung-Soon
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.292-298
    • /
    • 2010
  • Recently, with the beginning of the commercial operation of high-speed railway, there have been a number of changes in track structure fields. Also, it is expected that the development and introduction of new technology will be increased afterwards. However, it accompanies a lot of risk to install new track structures of which performance and safety are not verified on permanent ways with high traffic density. Therefore, to minimize the risk and enhance the adoption of new technology, it is required to develop a systemic verification system for track structure. To do this, in this paper, main contents of a draft of guidelines for track structure verification, and main issues in debate such as criteria and method for verification, test conditions and test periods are discussed. Also, a process to choose a most appropriate one for a specific project out of proven track structures by the above verification system, the selection process by the technical investigation committee and the VE process to analyze the economical and maintenance aspects based on LCC concept in Korea Rail Network Authority is introduced.

  • PDF

Performance Evaluation of Swing-Nose Crossing on Slab Track (콘크리트궤도용 고속분기기 성능평가)

  • Kim, Si-Chul;Kim, Man-Cheol;Hwang, Kwang-Ha;Bae, Sang-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.282-291
    • /
    • 2010
  • In line with current speed-up of railroad, a slab track has been increasingly adopted in a bid to secure the safety of track structure as well as to reduce the maintenance cost, and furthermore, the need for commercialization of domestically-developed swing-nose crossing turnout on slab track has been on the rise. For commercialization of swing-nose crossing turnout on slab which was developed in Korea, a technical and systematic performance evaluation system, considering local environment, shall be established and then the performance evaluation shall be accordingly implemented. This paper was intended to summarize the performance evaluation system, referring to the data available at home and abroad and the results of performance evaluation for domestically-developed swing-nose crossing turnout on slab track carried out to date based on that system. A performance evaluation system comprises the technical requirement appropriateness evaluation(component performance evaluation and design verification), laboratory test and on-site test. For domestically-developed swing-nose crossing turnout on slab track, appropriateness evaluation and laboratory test have been completed and the on-site test of those installed on the 2nd phase of Kyung-Bu HSR is underway now.

  • PDF