• 제목/요약/키워드: tower-crane

검색결과 115건 처리시간 0.023초

타워형 크레인의 자동화를 위한 이론적 고찰 및 디지탈 제어에 관한 연구 (Theoretical consideration and digital control for automation of tower cranes)

  • 이진우;이충환;김상봉
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1992년도 한국자동제어학술회의논문집(국내학술편); KOEX, Seoul; 19-21 Oct. 1992
    • /
    • pp.993-998
    • /
    • 1992
  • The paper treated the oscillation control of cargo rope and the position control of cart for a tower crane system by adopting the optimal regulator method. Since the tower crane has nonlinearity and it is very unstable when the cargo is mobiling, an insensitive control system with respect to oscillation of cargo rope and disturbance such as wind is required. In this paper, model equation of the tower crane is induced by using Lagrange equation and it is linearized at equilibrium point. The real time control of tower crane syste is implemented by 16bits microcomputer with A/D and D/A convetters to illustrate the application of the adopted optimal desgn method.

  • PDF

신호체계와 신호수 교육 개선을 통한 양중 작업 중 타워 크레인 사고 저감 대책 (Measures to Reduce Tower Crane Accidents During Operation by Improving Signal System and Education for Signalmen)

  • 윤동훈;박종일;기정훈
    • 한국안전학회지
    • /
    • 제34권4호
    • /
    • pp.68-75
    • /
    • 2019
  • As the tower crane accident emerged as a social issue in 2017, various government measures were prepared. Most of the measures are focused on erecting, climbing, and dismantling phases. Analyzes of 84 serious accidents related to tower cranes from 2000 to 2018 and 104 near misses accidents from 2016 to 2018 revealed that 50% of the serious accidents occurred during the operating phase. The main occupation influencing operating phase accidents was signalman(81.6% of serious accidents), whose communication and competency were governing causes. This result was the same in 294 questionnaires to signalmen. Signal systems and education policies for tower crane signalman in Korea and foreign countries were analyzed, and standardization of wireless signal system and improvement of education system were propose.

타워크레인 텔레스코핑 작업의 안전리스크 대응방안 연구 (A Study on the Safety Risk of Telescoping Work of Tower Cranes)

  • 이동훈;최재휘;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.9-13
    • /
    • 2009
  • As recent construction projects are bigger and higher, the importance of lifting is increasing. In construction sites tower cranes are an essential lifting equipment covering were than 50% of all construction activities. But due to neglect of safety supervision, tower crane-related accidents are frequently taking place. Since most of construction activities is done in heights, the accidents are more likely to be catastrophic. According to an analysis of the causes of tower crane-related accidents, 49% of all accidents claimed for certain periods($1999{\sim}2003$) occurred in the process of telescoping work. Therefore, this research is conducted with the object of analyzing telescoping work of tower cranes and presenting solutions against safety risk. It is expected that the results of this study can be used as useful basic data or material when preparing for effective safety management for tower cranes.

  • PDF

BIM 정보를 활용한 장비 선정 Process Inovation에 관한 연구 (A Study on Process Inovation of Tower-Crane Planning by Using BIM)

  • 장세준;윤석헌;백준홍
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.446-449
    • /
    • 2008
  • Construction project has been changing a huge size and the complicated, so information of each parties are overflow. For more successful construction, more communications are required. Nowadays, BIM has been used widely to solve the problem. But BIM information is used by attribute parties. Many of parties cannot use BIM information. Therefore, this study's purpose is to develope prototype of BIM usage for tower crane. It will overcome current information dividing.

  • PDF

타워크레인 붕괴사고의 구조적 분석 (Structural Analysis for the Collapse Accident of Tower Crane)

  • 이명구;노민래
    • 한국안전학회지
    • /
    • 제16권4호
    • /
    • pp.147-152
    • /
    • 2001
  • The tower cranes are the very useful construction machine in the high place works. But they are very susceptible to the load balance, the wind load and the hanging load because they are the very slender structures and those center of gravity is located in the upper part. Therefore, the collapse accidents of tower one have repeatedly happened during the assemble or disassemble works. The correcting frame may has often used in order to correct the error in the setting of foundation anchors. The goal of this study is that propose the methods preventible the collapse accident of tower crane which is constructed by using the correcting frame. In order to accomplish the goal of this study, the field survey, the reference investigation and the structure analysis were performed for the collapse accident of tower crane using the correcting frame. This study result in the methods preventible the same accident.

  • PDF

타워크레인의 기울어짐 측정 시스템 개발 (The Development of the Slope Monitoring System(SMS) of the Tower Crane)

  • 신운철;홍용수
    • 한국안전학회지
    • /
    • 제25권6호
    • /
    • pp.60-64
    • /
    • 2010
  • The purpose of this study if to prevent dangerous accident of the overthrow of the tower crane in summer's hurricane. We develop the SMS in order to give automatic alarm system to operator within the dangerous range and to give a information of the exactly slope in the real time. The slope value of the tower crane is compose of direction, pitch by the front and rear, roll by the right and left and synthesis by the its pitch and roll. Especially, the synthesis eliminate the effect of the wall tie or wire bracing. So, this value should correctly indicate the actual slope. In this study, more applying field test should be applied with the SMS. In the future, a more measurement device can be applied to, and be able to feed more alarm criteria for the review of the risk in the field.

타워크레인의 용접부 비파괴검사 데이터 기반 취약부위 분석 (Analysis of Vulnerable Parts based on Non-destructive Testing Data of Tower Crane Welding Parts)

  • 정성모;임재용
    • 자동차안전학회지
    • /
    • 제13권2호
    • /
    • pp.50-56
    • /
    • 2021
  • The purpose of this study is to investigate vulnerable parts of tower crane structures by analyzing extensive non-destructive test data. Approximately ten percent of domestically registered tower cranes were inspected by using magnetic particle inspection. The testing was carried out as advised in KS B 0213. The non-destructive results was analyzed with respect to jib types, age and crane size. As a result, the number of crack occurrences were the largest in mast parts, followed by main jib part. Moreover, it was found that turntables were important parts deserved to be noticed at the perspective of safe maintenance.

스마트 기기의 증강현실을 이용한 타워크레인 선정방안 (Method to Select Tower Cranes Using Augmented Reality in Smart Devices)

  • 류한국;최희복;장명훈
    • 한국건축시공학회지
    • /
    • 제14권5호
    • /
    • pp.407-413
    • /
    • 2014
  • 고층건축공사의 양중장비의 선정은 프로젝트 성공의 중요한 요소 중의 하나이다. 건설현장에서는 전문가나 경험이 많은 공사관리자가 2차원 도면 위에 타워크레인의 회전반경을 고려하여 위치를 이동시키는 방법을 통해 적절한 위치를 결정한다. CAD와 BIM, 가상현실 등이 건축설계와 시공단계에 많이 활용되고 있지만 가설계획이나 타워크레인을 선정하기 위해서는 사용되지 않고 있다. 이 연구는 적절한 타워크레인의 위치를 선정하기 위해 증강현실 기술을 이용하는 방법을 제안하고 있다. Vuforia와 Unity 3d를 이용하여 타워크레인의 위치를 선정할 수 있는 증강현실 프로토타입을 구현하였으며 실제 건축도면을 통해 활용성을 검증하였다.

타워크레인 기초설계 및 안정성 검토 모델 (Tower Crane Foundation Design and Stability Review Model)

  • 호종관;한갑규;김선국
    • KIEAE Journal
    • /
    • 제7권6호
    • /
    • pp.99-106
    • /
    • 2007
  • Tower crane is a large construction equipment which is extremely tall for its section when it is erected, with its high slenderness ratio, and it has a heavy load by itself due to large lifting stuff to handle. In line with the construction projects in these days which increasingly tend to become higher, larger and complex, the stuff and height subject to lifting are also getting larger and higher, which has also increased the risk of disastrous accidents. A stable foundation design thus to deal with the increasing self load becomes more important. When a typhoon Maemi swept the nation in 2003, as many as 43 tower cranes fell down or collapsed, causing a severe damage to the people and the properties. Considering such fatal damages, a technical evaluation of the stability to prevent the safety accident with the tower crane must be very crucial. Tower cranes operation in domestic construction sites, in fact, have been simply dependent on personal experience and intuition of the engineers. Particularly when it comes to the foundation design, it mostly depends on manufacturer's recommendation. The study hence was intended to develop the fundamental measures for granting the objective stability, instead of following the individual's experience only. The simulation model recommended in the study is expected to make a good commitment to achieving an effective lifting work as well as preventing the safety accident.